|
North America: Barbados · Canada · Costa Rica · Cuba · Dominica · Dominican Republic · El Salvador · Grenada · Guatemala · Honduras · Jamaica · Mexico · Nicaragua · Panama · Puerto Rico · Saint Kitts and Nevis · The Bahamas · USA
South America: Argentina · Bolivia · Brazil · Chile · Colombia · Curaçao · Ecuador · Guyana · Peru · Uruguay · Venezuela
Europe: Albania · Austria · Belarus · Belgium · Bosnia and Herzegovina · Bulgaria · Croatia · Cyprus · Czech Republic · Denmark · Estonia · Faroe Islands · Finland · France · Germany · Greece · Hungary · Iceland · Ireland · Italy · Kosovo · Latvia · Lithuania · Luxembourg · Moldova · Montenegro · Netherlands · North Macedonia · Norway · Poland · Portugal · Romania · Serbia · Slovakia · Slovenia · Spain · Sweden · Switzerland · Ukraine · United-Kingdom
Africa: Algeria · Cape Verde · Chad · Djibouti · Egypt · Eritrea · Ethiopia · Gambia · Ghana · Kenya · Libya · Mauritania · Mauritius · Morocco · Mozambique · Namibia · Niger · Nigeria · Senegal · Seychelles · South Africa · Sudan · Tanzania · Tunisia · Uganda
Asia: Armenia · Azerbaijan · Bahrain · Bangladesh · Bhutan · Cambodia · China · Georgia · India · Iran · Israel · Japan · Jordan · Kazakhstan · Kuwait · Laos · Mongolia · Oman · Pakistan · Russia · Saudi Arabia · Singapore · South Korea · Sri Lanka · Syria · Taiwan · Thailand · Turkey · United Arab Emirates · Uzbekistan · Vietnam
Oceania: Australia · Fiji · Guam · Indonesia · Micronesia · New-Zealand · Philippines · Samoa · Tonga · Vanuatu
Name Area |
Power (kW) Number of turbines |
Hub height (m) |
Manufacturer | Status | Commissioning date |
||
25 Mile Creek | 250,000 60 | Operational | |||||
3-D Metals | 100 1 | Operational | |||||
6th Space Warning Squadron | 3,360 2 | Operational | |||||
AB Tehachapi | 6,970 31 | Operational | |||||
Adair | Dismantled | ||||||
Adair | 174,800 76 | Operational | |||||
Adams (Iowa) | 144,900 60 | Operational | |||||
Adams (Iowa) | 9,384 4 | Operational | |||||
Adams (Minnesota) | 14,000 | Operational | |||||
Adams Community Wind | 20,040 12 | Operational | |||||
Aeroman repower (2003) | 3,000 2 | Operational | |||||
AeroTurbine | 4,680 39 | Operational | |||||
AFCEE MMR Turbines | 3,000 2 | Operational | |||||
Agassiz Beach | 1,980 3 | Operational | |||||
Agriwind | 8,400 4 | Operational | |||||
Aikido Demonstration | 2,000 1 | Planned | |||||
Ainsworth | 59,400 36 | Operational | |||||
Air Force | 2,000 1 | Operational | |||||
Air Force Center for Engineering & the Environment | 1,500 1 | Operational | |||||
Akron-Westfield School District | 600 1 | Operational | |||||
Alaska Village Cooperative | 300 3 | Operational | |||||
Alexander | 48,300 21 | Operational | |||||
Alite | 24,000 8 | Operational | |||||
Alle-Catt Wind Energy | 340,000 117 | Under construction | |||||
Allegheny Ridge wind farm | 80,000 40 | Operational | |||||
Allendorf | 1,200 | Operational | |||||
Alta Farms | 200,000 | Operational | |||||
Alta I | 150,000 100 | Operational | |||||
Alta II (Vestas) | 150,000 50 | Operational | |||||
Alta III | 150,000 50 | Operational | |||||
Alta IV | 102,000 34 | Operational | |||||
Alta IX | 132,000 44 | Operational | |||||
Alta Mesa I | 18,720 117 | Dismantled | |||||
Alta Mesa I | 39,000 | Under construction | |||||
Alta Mesa II | 9,450 42 | Operational | |||||
Alta V | 168,000 56 | Operational | |||||
Alta VI | 150,000 50 | Operational | |||||
Alta VII | 168,000 56 | Operational | |||||
Alta VIII | 21,000 7 | Operational | |||||
Alta VIII | 129,000 43 | Operational | |||||
Altamont Pass | 11,000 | Dismantled | |||||
Altech 3 (b) | 21,710 201 | Dismantled | |||||
Amadeus | 214,320 76 | Operational | |||||
Amadeus | 35,800 20 | Operational | |||||
Amazon Wind Farm | 149,500 65 | Operational | |||||
Amazon Wind Farm Texas | 253,000 110 | Operational | |||||
Amazon Wind Farm US East | 208,000 104 | Operational | |||||
American Windmill Museum | 660 1 | Operational | |||||
AMP-Ohio-Green Mountain Energy Wind Farm | 1,800 1 | Operational | |||||
AMP-Ohio-Green Mountain Energy Wind Farm | 1,800 1 | Operational | |||||
Anacacho | 99,000 55 | Operational | |||||
Anderson | 9,000 5 | Operational | |||||
Anderson | 6,000 3 | Operational | |||||
Anheuser-Busch Fairfield | 1,850 1 | Operational | |||||
Anheuser-Busch Fairfield | 1,500 1 | Operational | |||||
Antrim | 28,800 9 | Operational | |||||
Apogee Stadium Wind | 300 3 | Operational | |||||
Appalachian State | 100 1 | Operational | |||||
Appaloosa Run | 174,840 62 | Operational | |||||
Apple Blossom | 100,050 29 | Operational | |||||
Applied Materials | 2,500 1 | Operational | |||||
Aragonne Mesa | 90,000 90 | Dismantled | |||||
Aragonne Mesa | 90,000 | Operational | |||||
Aragonne Wind | 145,000 53 | Operational | |||||
Arbor Hill 2018 | 250,000 125 | Operational | |||||
Arbor Hill 2019 | 8,000 4 | Operational | |||||
Arbor Hill 2019 | 50,400 12 | Operational | |||||
Arbuckle Mountain | 100,000 50 | Operational | |||||
Archbold Area Schools | 750 1 | Operational | |||||
Arends Brothers | 100 1 | Operational | |||||
Arkwright Summit | 70,400 32 | Operational | |||||
Arkwright Summit | 8,000 4 | Operational | |||||
Armadillo Flats | 105,800 46 | Operational | |||||
Armadillo Flats | 103,820 58 | Operational | |||||
Armadillo Flats | 8,575 5 | Operational | |||||
Armenia Mountain | 100,500 67 | Operational | |||||
Arnold Wind Farm | 1,650 1 | Operational | |||||
Ashtabula - Otter Tail | 48,000 32 | Operational | |||||
Ashtabula I | 148,500 99 | Dismantled | |||||
Ashtabula I | 148,500 99 | Operational | |||||
Ashtabula II | 67,500 45 | Operational | |||||
Ashtabula II | 52,500 35 | Operational | |||||
Ashtabula III | 62,400 39 | Operational | |||||
Atlantic Shores 1 | 2,509,600 | Planned | |||||
Atlantic Shores 2 | 1,425,000 | Planned | |||||
Atlantic Shores North | 1,230,000 | Planned | |||||
Atlas Wind | 2,000,000 | Planned | |||||
Attentive Energy One | 1,710,000 | Planned | |||||
Attentive Energy Two | 1,342,000 | Planned | |||||
August Wind Energy | 1,790 1 | Operational | |||||
Aurora County Wind | 20,700 9 | Operational | |||||
Aurora Wind | 30,000 15 | Operational | |||||
Aurora Wind | 268,800 56 | Operational | |||||
Autumn Hills | 1,900 | Operational | |||||
Auwahi Wind Farm | 24,000 8 | Operational | |||||
Aviator | 369,920 136 | Operational | |||||
Aviator | 155,100 55 | Operational | |||||
AVTEC | 100 1 | Operational | |||||
Azure Sky Wind | 312,000 65 | Operational | |||||
Azure Sky Wind | 14,000 7 | Operational | |||||
Azure Sky Wind | 24,150 7 | Operational | |||||
Babbitt Ranch | 161,000 | Under construction | |||||
Baffin | 202,000 101 | Operational | |||||
Baldwin Wind | 102,400 654 | Dismantled | |||||
Baldwin Wind | 102,400 64 | Operational | |||||
Baldwinville | 1,650 1 | Operational | |||||
Balko Wind | 299,700 162 | Operational | |||||
Ball Hill Wind | 108,000 | Operational | |||||
Barnstable Wastewater | 200 2 | Operational | |||||
Baron Winds | 121,800 32 | Operational | |||||
Bartlett’s Ocean Wind Farm | 250 1 | Dismantled | |||||
Barton | 160,000 80 | Operational | |||||
Barton Chapel Wind | 120,000 60 | Operational | |||||
Bayonne Wind Project | 1,500 1 | Operational | |||||
Beacon Wind 1 | 1,230,000 | Planned | |||||
Beacon Wind 2 | 1,170,000 | Planned | |||||
Bear Creek | 24,000 12 | Operational | |||||
Bearkat I | 196,650 57 | Operational | |||||
Bearkat II | 162,150 47 | Operational | |||||
Beaver Creek | 170,000 85 | Operational | |||||
Beaver Creek (Montana) | 50,000 | Under construction | |||||
Beaver Creek (Montana) | 60,000 | Under construction | |||||
Beaver Creek (Montana) | 60,000 | Under construction | |||||
Beaver Creek (Montana) | 50,000 | Under construction | |||||
Beaver Creek II | 170,000 85 | Operational | |||||
Beaver Ridge Wind | 4,500 3 | Operational | |||||
Beebe | 81,600 34 | Operational | |||||
Beebe | 50,400 21 | Operational | |||||
Beech Ridge 1 | 100,500 67 | Operational | |||||
Beech Ridge 2 | 5,440 2 | Operational | |||||
Beech Ridge 2 | 50,760 18 | Operational | |||||
Beethoven | 79,550 43 | Operational | |||||
Bellevue High School | 100 1 | Operational | |||||
Bennett Creek | 21,000 10 | Operational | |||||
Bennington | 96,060 33 | Operational | |||||
Benson Creek | 10,000 5 | Operational | |||||
Bent Tree Wind Farm | 201,300 122 | Operational | |||||
Berkshire Wind Farm | 15,000 10 | Operational | |||||
Berkshire Wind Farm | 900 1 | Operational | |||||
Berkshire Wind Farm | 4,600 2 | Operational | |||||
Bethel (AK) | 900 1 | Operational | |||||
Bethel (TX) | 276,000 120 | Operational | |||||
Big Blue Wind Farm | 36,000 18 | Operational | |||||
Big Horn | 199,500 133 | Operational | |||||
Big Horn II | 50,000 25 | Operational | |||||
Big Level | 21,600 6 | Operational | |||||
Big Level | 68,400 19 | Operational | |||||
Big Sky | 239,400 114 | Dismantled | |||||
Big Sky Repowering | 228,800 104 | Operational | |||||
Big Sky Repowering | 10,000 5 | Operational | |||||
Big Smile Wind Farm | 132,000 66 | Operational | |||||
Big Spring I | 27,720 42 | Operational | |||||
Big Spring II | 7,000 4 | Dismantled | |||||
Big Spring III | 7,000 4 | Dismantled | |||||
Big Timber | 25,060 14 | Operational | |||||
Big Turtle | 20,000 10 | Operational | |||||
Big Turtle II | 29,400 14 | Operational | |||||
Big Windy | 110 1 | Operational | |||||
Biglow Canyon | 125,400 76 | Operational | |||||
Biglow Canyon | 149,500 65 | Operational | |||||
Biglow Canyon | 174,800 76 | Operational | |||||
Bingham Lake | 15,000 12 | Operational | |||||
Bingham Wind | 184,800 56 | Operational | |||||
Birch Power | 1,790 1 | Operational | |||||
Bishop Hill I | 156,800 98 | Operational | |||||
Bishop Hill I | 52,500 35 | Operational | |||||
Bishop Hill II | 81,000 50 | Operational | |||||
Bishop Hill III | 132,500 53 | Operational | |||||
Bison Wind Project | 36,800 16 | Operational | |||||
Bison Wind Project | 204,800 64 | Operational | |||||
Bison Wind Project | 105,000 35 | Operational | |||||
Bison Wind Project | 24,000 8 | Operational | |||||
Bison Wind Project | 21,000 7 | Operational | |||||
Bison Wind Project | 51,000 17 | Operational | |||||
Bison Wind Project | 54,000 18 | Operational | |||||
Bitter Ridge | 146,640 52 | Operational | |||||
Bitworks | 100 1 | Operational | |||||
Black Oak | 11,900 7 | Operational | |||||
Black Oak Wind Farm | 78,000 39 | Operational | |||||
Black Rock | 115,000 23 | Operational | |||||
Blackfeet Nation | 100 1 | Operational | |||||
Blackjack Creek project | 240,000 50 | Operational | |||||
Blackwell Wind | 59,800 26 | Operational | |||||
Blazing Star Wind Farm | 198,000 90 | Operational | |||||
Blazing Star Wind Farm | 38,000 19 | Operational | |||||
Blazing Star Wind Farm | 162,000 81 | Operational | |||||
Block Island Wind Farm | 30,000 5 | Operational | |||||
Bloom | 178,200 54 | Operational | |||||
Blooming Grove | 18,400 8 | Operational | |||||
Blooming Grove | 242,520 86 | Operational | |||||
Blue Breezes I & II | 2,500 2 | Operational | |||||
Blue Canyon | 74,250 45 | Operational | |||||
Blue Canyon II | 133,200 74 | Dismantled | |||||
Blue Canyon II | 18,000 10 | Operational | |||||
Blue Canyon II | 148,000 74 | Operational | |||||
Blue Canyon V | 64,500 43 | Operational | |||||
Blue Canyon V | 34,500 23 | Operational | |||||
Blue Canyon VI | 99,000 55 | Operational | |||||
Blue Cloud | 148,350 43 | Operational | |||||
Blue Creek | 304,000 152 | Operational | |||||
Blue Sky Green Field | 145,200 88 | Operational | |||||
Blue Summit | 43,200 27 | Operational | |||||
Blue Summit | 83,200 52 | Operational | |||||
Blue Summit | 9,000 6 | Operational | |||||
Blue Summit II | 60,000 24 | Operational | |||||
Blue Summit II | 6,860 4 | Operational | |||||
Blue Summit III | 13,720 8 | Operational | |||||
Blue Summit III | 186,480 74 | Operational | |||||
Bluegrass Ridge wind energy project | 56,700 27 | Operational | |||||
Bluepoint Wind | 1,700,000 | Planned | |||||
Bluestem | 198,000 60 | Operational | |||||
Bluestone wind farm | 112,000 | Operational | |||||
Bluff Point | 119,700 57 | Operational | |||||
Bobcat Bluff | 150,000 100 | Dismantled | |||||
Bobcat Bluff | 162,000 100 | Operational | |||||
Boiling Springs | 92,000 40 | Operational | |||||
Boiling Springs | 56,400 20 | Operational | |||||
Bolton Valley Resort | 100 1 | Operational | |||||
Border Winds | 150,000 75 | Operational | |||||
Borderlands | 9,200 4 | Operational | |||||
Borderlands | 90,000 30 | Operational | |||||
Boswell Springs | 329,800 | Operational | |||||
Boulder NREL Wind | 3,000 1 | Dismantled | |||||
Boulder NREL Wind | 1,500 1 | Operational | |||||
Boulder NREL Wind | 2,300 1 | Dismantled | |||||
Boulder NREL Wind | 2,000 1 | Dismantled | |||||
Boulder NREL Wind | 600 1 | Operational | |||||
Boulder NREL Wind | 100 1 | Dismantled | |||||
Boulder NREL Wind | 2,300 1 | Operational | |||||
Boulder NREL Wind | 2,000 1 | Operational | |||||
Boulder NREL Wind | 3,000 1 | Operational | |||||
Boulder NREL Wind | 3,000 1 | Dismantled | |||||
Boulder NREL Wind | 3,000 1 | Operational | |||||
Boyce Dairy Farm | 100 1 | Operational | |||||
Brady II Wind Energy Center | 136,500 65 | Operational | |||||
Brady II Wind Energy Center | 12,530 7 | Operational | |||||
Brady Wind Energy Center | 149,730 87 | Operational | |||||
Brahms | 19,800 12 | Operational | |||||
Brazos Wind Ranch | 25,000 25 | Operational | |||||
Brazos Wind Ranch | 135,000 135 | Operational | |||||
Breckinridge | 98,600 58 | Operational | |||||
Brewster | 7,500 6 | Operational | |||||
Brewster | 7,500 6 | Operational | |||||
Bright Stalk | 205,200 57 | Operational | |||||
Briscoe | 149,850 81 | Operational | |||||
Broadlands | 159,100 37 | Operational | |||||
Broadlands | 40,700 11 | Operational | |||||
Broadview Wind (NM) | 241,500 105 | Operational | |||||
Broadview Wind (TX) | 82,800 36 | Operational | |||||
Broken Bow I | 80,000 50 | Operational | |||||
Broken Bow II | 73,100 43 | Operational | |||||
Bronco Plains | 276,360 98 | Operational | |||||
Bronco Plains | 23,000 10 | Operational | |||||
Bronco Plains II | 200,000 72 | Operational | |||||
Brookfield Tehachapi 1 (CCDLP) | 102,000 34 | Operational | |||||
Brookfield Wind Park | 74,800 44 | Operational | |||||
Brown County Wind | 1,500 1 | Operational | |||||
Bruenning’s Breeze | 228,000 76 | Operational | |||||
Brule County Wind | 20,700 9 | Operational | |||||
Buckeye | 200,480 112 | Operational | |||||
Buckthorn | 10,350 3 | Operational | |||||
Buckthorn | 89,700 26 | Operational | |||||
Buena Vista | 38,000 38 | Operational | |||||
Buena Vista | 36,920 211 | Operational | |||||
Buffalo Bear | 18,900 9 | Operational | |||||
Buffalo Dunes Wind Project | 249,750 135 | Operational | |||||
Buffalo Gap 1 | 120,600 67 | Operational | |||||
Buffalo Gap 2 | 232,500 155 | Operational | |||||
Buffalo Gap 3 | 170,200 74 | Operational | |||||
Buffalo Mountain Wind Energy Center | 27,000 15 | Operational | |||||
Buffalo Mountain Wind Energy Center | 1,980 3 | Dismantled | |||||
Buffalo Ridge (MN) | 26,280 73 | Dismantled | |||||
Buffalo Ridge (SD) | 50,400 24 | Operational | |||||
Buffalo Ridge II (MN) | 112,800 40 | Operational | |||||
Buffalo Ridge II (SD) | 210,000 105 | Operational | |||||
Building Energy | 30,000 10 | Operational | |||||
Bull Creek Wind Farm | 180,000 180 | Operational | |||||
Bull Hill | 34,200 19 | Operational | |||||
Bulldog | 1,500 1 | Operational | |||||
Burco Farm & Feed | 100 1 | Operational | |||||
Bureau Valley School District | 660 1 | Operational | |||||
Burke Mountain | 100 1 | Operational | |||||
Burley Butte Wind | 19,500 13 | Operational | |||||
Busch Ranch Wind I | 28,800 16 | Operational | |||||
Busch Ranch Wind II | 59,400 27 | Operational | |||||
Butler Ridge | 54,000 36 | Operational | |||||
Byers Auto | 100 1 | Operational | |||||
Cabazon | 40,920 62 | Operational | |||||
Cabazon | 39,750 53 | Operational | |||||
Cactus Flats | 148,350 43 | Operational | |||||
Caddo Wind | 302,500 110 | Operational | |||||
CADEMO Demonstration | 60,000 | Planned | |||||
Cajun Wind | 600,000 | Planned | |||||
California Ridge | 217,080 134 | Operational | |||||
California State Prison LA County | 1,850 1 | Operational | |||||
Callahan Divide Wind Energy Center | 114,000 76 | Dismantled | |||||
Callahan Divide Wind Energy Center | 114,000 76 | Operational | |||||
CalWind II CEC | 8,580 13 | Operational | |||||
Camden Hills Regional HS | 100 1 | Operational | |||||
Camelot | 1,500 1 | Operational | |||||
Cameron | 165,000 55 | Operational | |||||
Cameron Ridge | 60,000 80 | Operational | |||||
Camp Grove Wind Farm | 150,000 100 | Operational | |||||
Camp Reed Wind | 22,500 15 | Operational | |||||
Camp Springs I | 130,500 87 | Operational | |||||
Camp Springs II (1Q08) | 88,500 59 | Operational | |||||
Camp Springs II (4Q07) | 31,500 21 | Operational | |||||
Camp Williams Utah National Guard | 660 1 | Operational | |||||
Camp Williams Utah National Guard | 225 1 | Operational | |||||
Campbell County | 95,200 56 | Operational | |||||
Campbell Hill | 99,000 66 | Operational | |||||
Canadian Breaks | 200,100 87 | Operational | |||||
Canadian Hills Wind | 148,800 62 | Operational | |||||
Canadian Hills Wind | 149,650 73 | Operational | |||||
Caney River | 199,800 111 | Operational | |||||
Canisteo wind farm | 291,000 | Under construction | |||||
Cannon | 900 1 | Operational | |||||
Cannon I | 860 8 | Operational | |||||
Cannon II (California) | 12,600 28 | Operational | |||||
Cannon II (Iowa) | 900 1 | Operational | |||||
Canopy | 1,600,000 | Planned | |||||
Canton Mountain | 22,800 8 | Operational | |||||
Cape Cod Regional Transit Authority | 100 1 | Operational | |||||
Capricorn Ridge (GE Energy) | 214,500 143 | Operational | |||||
Capricorn Ridge (Siemens) | 149,500 65 | Dismantled | |||||
Capricorn Ridge (Siemens) | 149,500 65 | Operational | |||||
Capricorn Ridge Expansion | 142,500 95 | Dismantled | |||||
Capricorn Ridge Expansion | 156,000 104 | Dismantled | |||||
Caprock Wind Ranch | 60,000 60 | Operational | |||||
Caprock Wind Ranch II | 20,000 20 | Operational | |||||
Cardinal Point Wind | 150,000 60 | Operational | |||||
Carleton College | 1,650 1 | Operational | |||||
Carleton College | 1,600 1 | Operational | |||||
Carousel | 149,600 88 | Operational | |||||
Carroll | 150,000 100 | Dismantled | |||||
Carroll | 20,700 9 | Operational | |||||
Carroll | 36,000 24 | Operational | |||||
Carroll | 123,120 76 | Operational | |||||
Carthage Wind Turbine | 110 1 | Operational | |||||
Casa Mesa | 47,500 19 | Operational | |||||
Casa Mesa | 3,400 2 | Operational | |||||
Cascadia Wind | 2,000,000 | Planned | |||||
Case Western University | 1,000 1 | Operational | |||||
Case Western University | 225 1 | Operational | |||||
Case Western University | 100 1 | Operational | |||||
Cashton Greens | 5,000 2 | Operational | |||||
Casper Wind Farm | 16,500 11 | Operational | |||||
Cassadaga | 99,225 27 | Operational | |||||
Cassadaga | 26,250 10 | Operational | |||||
Casselman Wind Project | 34,500 23 | Operational | |||||
Cassia | 29,400 14 | Operational | |||||
Castle Gap | 197,000 | Operational | |||||
CCC Hastings Wind Turbine | 1,700 1 | Operational | |||||
CED Centerville Wind Project | 5,600 2 | Operational | |||||
CED Manchester Wind | 8,400 3 | Operational | |||||
Cedar Bluff | 188,700 111 | Operational | |||||
Cedar Creek (Colorado) | 221,000 221 | Operational | |||||
Cedar Creek (Colorado) | 79,500 53 | Operational | |||||
Cedar Creek (Idaho) | 152,000 | Operational | |||||
Cedar Creek II (GE Energy) | 94,500 63 | Operational | |||||
Cedar Creek II (Nordex) | 150,000 60 | Operational | |||||
Cedar Hills Wind Facility | 19,500 13 | Operational | |||||
Cedar Point Wind Farm | 250,200 139 | Operational | |||||
Cedar Ridge | 67,650 41 | Operational | |||||
Cedar Springs I | 183,300 65 | Operational | |||||
Cedar Springs I | 16,100 7 | Operational | |||||
Cedar Springs II | 186,120 66 | Operational | |||||
Cedar Springs II | 16,100 7 | Operational | |||||
Cedar Springs III | 124,080 44 | Operational | |||||
Cedar Springs III | 9,200 4 | Operational | |||||
Cedro Hill | 150,000 100 | Operational | |||||
Cemex Madison | 3,600 2 | Operational | |||||
Centennial Wind Energy Project (2006) | 60,000 40 | Operational | |||||
Centennial Wind Energy Project (2007) | 60,000 40 | Operational | |||||
Central Plains | 99,000 33 | Operational | |||||
Century I | 150,000 100 | Operational | |||||
Century II | 35,000 35 | Operational | |||||
Century III | 12,000 8 | Operational | |||||
Century III | 3,000 2 | Operational | |||||
Cerro Gordo | 41,250 55 | Dismantled | |||||
Cerro Gordo Repower | 36,800 16 | Operational | |||||
Chamberlain Wind Project | 2,600 2 | Operational | |||||
Champepaden - Chandler Hills Phase II | 1,980 3 | Operational | |||||
Chanarambie | 85,500 57 | Dismantled | |||||
Chandler Hills | 1,980 3 | Operational | |||||
Chapman Ranch | 249,075 81 | Operational | |||||
Charles City (1Q08) | 57,000 38 | Operational | |||||
Charles City (2Q08) | 18,000 12 | Operational | |||||
Charlestown Wind Turbine | 1,500 1 | Operational | |||||
Chestnut Flats | 34,000 17 | Operational | |||||
Chestnut Flats | 4,000 2 | Operational | |||||
Chestnut Flats | 46,000 23 | Operational | |||||
Chevak | 400 4 | Operational | |||||
Chevelon Butte | 238,000 | Operational | |||||
Chevelon Butte | 216,000 48 | Under construction | |||||
Cheyenne Ridge | 444,400 202 | Operational | |||||
Cheyenne Ridge | 52,000 26 | Operational | |||||
Chilocco wind farm | 169,200 | Under construction | |||||
Chisholm View | 235,200 140 | Operational | |||||
Chisholm View II | 64,800 27 | Operational | |||||
Chokecherry And Sierra Madre Wind Energy Project | 750,000 | Under construction | |||||
Chokecherry And Sierra Madre Wind Energy Project | 750,000 | Under construction | |||||
Chokecherry And Sierra Madre Wind Energy Project | 500,000 | Under construction | |||||
Chokecherry And Sierra Madre Wind Energy Project | 500,000 | Under construction | |||||
Chokecherry And Sierra Madre Wind Energy Project | 500,000 | Under construction | |||||
Chopin | 8,950 5 | Operational | |||||
Chopin II | 6,860 4 | Operational | |||||
Chopin II | 1,790 1 | Operational | |||||
Cimarron Bend I | 200,000 100 | Operational | |||||
Cimarron Bend II | 200,000 100 | Operational | |||||
Cimarron Bend III | 174,840 62 | Operational | |||||
Cimarron Bend III | 24,000 12 | Operational | |||||
Cimarron I | 165,600 72 | Operational | |||||
Cimarron II | 131,100 57 | Operational | |||||
Cirrus 1 | 61,200 17 | Operational | |||||
Cisco Wind Energy | 8,400 4 | Operational | |||||
City of Medford | 100 1 | Operational | |||||
City of Seward | 1,700 1 | Operational | |||||
City of Soldad | 1,850 1 | Operational | |||||
Clark Thompson 1 | 900 1 | Operational | |||||
Clay Central-Everly School District | 100 1 | Operational | |||||
Clay High School | 900 1 | Operational | |||||
Clearwater | 750,000 131 | Operational | |||||
Clearwater Energy Project 1A | 14,100 5 | Operational | |||||
Clines Corners | 324,800 116 | Operational | |||||
Cloud County Community College | 100 1 | Operational | |||||
Cloud County Community College | 100 1 | Operational | |||||
Cloud Power Wind Farm | 300 3 | Operational | |||||
Clovis Wind Power Project | 660 1 | Operational | |||||
Coachella Hills | 46,800 13 | Operational | |||||
Coachella Hills | 13,800 4 | Operational | |||||
Coastal Energy | 1,500 1 | Operational | |||||
Coastal Energy | 4,500 3 | Operational | |||||
Cohocton Wind Farm | 57,500 23 | Operational | |||||
Cohocton Wind Farm | 67,500 27 | Operational | |||||
Cohocton Wind Farm | 67,500 27 | Dismantled | |||||
Colebrook South | 5,700 2 | Operational | |||||
Colorado Green | 150,000 100 | Dismantled | |||||
Colorado Green | 144,000 90 | Operational | |||||
Colorado Green | 12,000 8 | Operational | |||||
Colorado Highlands 1 | 67,200 42 | Operational | |||||
Colorado Highlands 2 | 23,800 14 | Operational | |||||
Combine Hills I | 41,000 41 | Operational | |||||
Combine Hills II | 63,000 63 | Operational | |||||
Commonwealth Wind | 1,200,000 | Planned | |||||
Community Offshore Wind | 2,610,000 | Planned | |||||
Community Offshore Wind | 1,314,000 | Planned | |||||
Community Wind North | 30,000 12 | Dismantled | |||||
Community Wind North wind farm | 24,000 12 | Operational | |||||
Community Wind South | 30,750 15 | Operational | |||||
Conception Wind Project | 50,400 24 | Operational | |||||
Condon | 24,600 41 | Operational | |||||
Condon II | 25,200 42 | Operational | |||||
Conneaut Middle School | 600 1 | Dismantled | |||||
Conneaut Middle School | 600 1 | Operational | |||||
Conneaut Waste Water Facility | 400 1 | Dismantled | |||||
Contrail | 11,500 5 | Operational | |||||
Contrail | 84,600 30 | Operational | |||||
Contrail | 16,320 6 | Operational | |||||
Cooper Farms | 4,500 3 | Operational | |||||
Copenhagen (US) | 80,000 40 | Operational | |||||
Coram Energy (Aeroman repower) | 10,500 7 | Operational | |||||
Coram Energy (Aeroman repower) | 4,500 3 | Operational | |||||
Corn Plus | 4,200 2 | Operational | |||||
Correctional Training Facility | 1,700 1 | Operational | |||||
Corriedale Wind Energy Project | 59,220 21 | Operational | |||||
Cotton Plains | 50,400 21 | Operational | |||||
Cottonwood (NE) | 5,145 3 | Operational | |||||
Cottonwood (NE) | 85,100 37 | Operational | |||||
Courtenay | 200,000 100 | Operational | |||||
Cow Branch Wind Energy Center | 50,400 24 | Operational | |||||
Coyote Ridge | 6,900 3 | Operational | |||||
Coyote Ridge | 87,500 35 | Operational | |||||
Coyote Wind Farm | 216,000 42 | Operational | |||||
Coyote Wind Farm | 26,565 11 | Operational | |||||
CR Holland Crane Service | 100 1 | Operational | |||||
Crane Creek | 99,000 66 | Operational | |||||
Cranell | 220,000 100 | Operational | |||||
Crescent Ridge | 54,450 33 | Dismantled | |||||
Crescent Ridge | 61,600 28 | Operational | |||||
Crescent Wind | 13,800 6 | Operational | |||||
Crescent Wind | 146,800 54 | Operational | |||||
Creston Ridge | 6,800 4 | Operational | |||||
Creston Ridge | 6,900 3 | Operational | |||||
Crisfield Waste Water Treatment Plant | 750 1 | Operational | |||||
Criterion | 70,000 28 | Dismantled | |||||
Criterion | Under construction | ||||||
Crocker Wind Farm | 209,440 77 | Operational | |||||
Crofton Bluffs | 36,000 20 | Operational | |||||
Crofton Bluffs | 6,000 2 | Operational | |||||
Cross Winds | 105,400 62 | Operational | |||||
Cross Winds II | 43,700 19 | Operational | |||||
Cross Winds III | 75,900 33 | Operational | |||||
Crossing Trails | 86,000 20 | Operational | |||||
Crossing Trails | 18,000 5 | Operational | |||||
Crosswinds | 195,500 85 | Operational | |||||
Crosswinds | 9,000 3 | Operational | |||||
Crosswinds | 23,000 10 | Operational | |||||
Crosswinds (Iowa) | 21,000 10 | Operational | |||||
Crow Lake | 160,500 107 | Operational | |||||
Crow Lake | 1,500 1 | Operational | |||||
Crowned Ridge I | 200,100 87 | Operational | |||||
Crowned Ridge II | 181,700 79 | Operational | |||||
Crowned Ridge II | 18,900 9 | Operational | |||||
Crystal Lake | 162,000 | Operational | |||||
Crystal Lake - Clipper | 190,000 76 | Dismantled | |||||
Crystal Lake - Clipper | 10,000 4 | Operational | |||||
Crystal Lake - Clipper | 190,000 76 | Operational | |||||
Crystal Lake - GE Energy | 150,000 100 | Dismantled | |||||
Crystal Lake - GE Energy | 66,000 44 | Operational | |||||
Cumberland Rose | 1,600 1 | Operational | |||||
Cuyahoga County Fairgrounds | 500 1 | Operational | |||||
CVOW Commercial - Phase Four plus | 2,600,000 | Planned | |||||
Dakota Range Wind I & II | 2,200 1 | Operational | |||||
Dakota Range Wind I & II | 153,600 32 | Operational | |||||
Dakota Range Wind I & II | 275,200 64 | Operational | |||||
Dakota Range Wind I & II | 26,600 7 | Operational | |||||
Danielson Wind | 20,040 12 | Operational | |||||
Dan’s Mountain | 55,000 | Under construction | |||||
Day County | 99,000 66 | Dismantled | |||||
Day County | 105,600 66 | Operational | |||||
Day County | 106,000 | Operational | |||||
Deerfield | 150,000 72 | Operational | |||||
Deerfield II | 112,000 | Operational | |||||
Deerfield Wind | Dismantled | ||||||
Deerfield Wind | 30,000 15 | Operational | |||||
Delaware Mountain | 28,500 38 | Dismantled | |||||
Delta | 185,000 | Under construction | |||||
Delta Junction | 100 1 | Operational | |||||
Delta Junction | 900 1 | Operational | |||||
Delta Junction | 900 1 | Operational | |||||
Department of Correction - NCCI Gardner | 3,300 2 | Operational | |||||
Desert Sky Wind Farm | 160,500 107 | Dismantled | |||||
Desert Sky Wind Farm Repowering | 5,100 3 | Operational | |||||
Desert Sky Wind Farm Repowering | 29,600 16 | Operational | |||||
Desert Sky Wind Farm Repowering | 108,000 72 | Operational | |||||
Deuel | 307,380 109 | Operational | |||||
DeWind Demonstration Project | 2,000 1 | Operational | |||||
DH Blattner Headquarters | 100 1 | Operational | |||||
Diablo Winds | 20,460 31 | Operational | |||||
Diamond Spring Wind | 273,540 97 | Operational | |||||
Diamond Spring Wind | 23,000 10 | Operational | |||||
Diamond Spring Wind | 14,100 5 | Operational | |||||
Diamond Trail | 137,600 32 | Operational | |||||
Diamond Trail | 11,000 5 | Operational | |||||
Diamond Trail | 16,000 8 | Operational | |||||
Diamond Trail | 4,200 1 | Operational | |||||
Diamond Trail Expansion | 13,200 6 | Operational | |||||
Diamond Trail Expansion | 70,500 25 | Operational | |||||
Diamond Vista | 299,250 95 | Operational | |||||
Diamond Willow extension | 10,500 7 | Operational | |||||
Diamond Willow Wind (07) | 1,500 1 | Operational | |||||
Diamond Willow Wind (08) | 18,000 12 | Operational | |||||
DifWind I | 7,344 56 | Operational | |||||
DifWind II | 3,024 16 | Operational | |||||
DifWind IV | 8,360 76 | Operational | |||||
Difwind IX | 14,550 97 | Operational | |||||
Difwind IX | 3,000 25 | Operational | |||||
DifWind V | 11,772 81 | Dismantled | |||||
Difwind VI | 27,000 199 | Operational | |||||
Difwind VII | 22,680 189 | Dismantled | |||||
Difwind VIII | 15,000 100 | Dismantled | |||||
Dillon | 45,000 45 | Operational | |||||
Dinosaur Point Wind Farm | 16,905 161 | Operational | |||||
Doerfler Farms | 250 1 | Operational | |||||
Dole Fresh Vegetables | 5,640 2 | Operational | |||||
Don Sneve Wind Project | 950 1 | Operational | |||||
DOW Wind | 100,000 | Planned | |||||
Downeast | 126,000 30 | Under construction | |||||
Drift Sand | 108,000 54 | Operational | |||||
Dry Lake | 63,000 30 | Operational | |||||
Dry Lake II | 65,100 31 | Operational | |||||
Dunkirk | 275 1 | Operational | |||||
Dunlap | 111,000 74 | Dismantled | |||||
Dunlap | 136,900 74 | Operational | |||||
Duran Mesa | 106,400 38 | Operational | |||||
Durbin Creek | 10,000 5 | Operational | |||||
Dutch Hill Wind Project | 68,000 | Operational | |||||
Dutch Pacific | 10,000 20 | Dismantled | |||||
Dyersville | 6,000 3 | Operational | |||||
Dynapower | 100 1 | Operational | |||||
East Fork | 195,840 72 | Operational | |||||
East Raymond | 198,000 90 | Operational | |||||
East Raymond | 2,000 1 | Operational | |||||
East Ridge | 3,750 3 | Operational | |||||
East Ridge | 6,250 5 | Operational | |||||
East Winds (formerly Altech III) | 4,165 7 | Operational | |||||
Echo I | 29,700 18 | Operational | |||||
Echo I | 14,850 9 | Operational | |||||
Echo II-III | 20,500 10 | Operational | |||||
Echo Wind Park | 112,000 70 | Operational | |||||
Eclipse | 200,100 87 | Operational | |||||
EcoGrove | 100,500 67 | Operational | |||||
Eden-Angola | 275 1 | Operational | |||||
Edom Hill | 11,000 | Dismantled | |||||
Edom Hills repower | 20,000 8 | Operational | |||||
Eight Point | 111,800 25 | Operational | |||||
Ekola Flats | 23,000 10 | Operational | |||||
Ekola Flats | 227,900 53 | Operational | |||||
El Algodon Alto | 171,600 78 | Operational | |||||
El Algodon Alto | 28,600 13 | Operational | |||||
El Cabo | 298,200 142 | Operational | |||||
El Campo (US) | 34,000 17 | Operational | |||||
El Campo (US) | 7,200 2 | Operational | |||||
El Campo (US) | 201,600 48 | Operational | |||||
El Dorado Waste Water Facility | 1,000 1 | Operational | |||||
El Sauz | 301,500 67 | Operational | |||||
Elbow Creek Wind Farm | 121,900 53 | Dismantled | |||||
Elbow Creek Wind Farm | 121,900 53 | Operational | |||||
Eldora - New Providence Schools | 750 1 | Operational | |||||
Electra Wind Farm | 230,000 100 | Operational | |||||
Elk | 42,500 17 | Operational | |||||
Elk City Wind | 98,900 43 | Operational | |||||
Elk City Wind II | 72,000 48 | Dismantled | |||||
Elk City Wind II | 27,000 18 | Dismantled | |||||
Elk City Wind II | 29,160 18 | Operational | |||||
Elk City Wind II | 72,000 48 | Operational | |||||
Elk River | 150,000 100 | Operational | |||||
Elkhorn Ridge | 81,000 27 | Operational | |||||
Elkhorn Valley | 3,300 2 | Operational | |||||
Elkhorn Valley | 97,350 59 | Operational | |||||
Elm Creek | 99,000 66 | Operational | |||||
Elm Creek II | 148,800 62 | Operational | |||||
Emmonak | 400 4 | Operational | |||||
Emmons Logan | 104,920 61 | Operational | |||||
Emmons Logan | 111,520 41 | Operational | |||||
Empire Wind | 816,000 80 | Approved | |||||
Empire Wind 2 | 1,260,000 | Planned | |||||
Endeavor I | 25,000 10 | Dismantled | |||||
Endeavor I | 12,500 5 | Dismantled | |||||
Endeavor I | 62,500 25 | Dismantled | |||||
Endeavor I | 11,500 5 | Operational | |||||
Endeavor I | 87,500 35 | Operational | |||||
Endeavor II | 50,000 20 | Dismantled | |||||
Endeavor II | 45,000 18 | Operational | |||||
Endeavor II | 4,600 2 | Operational | |||||
Energy Unlimited | 10,000 10 | Operational | |||||
English Farms | 145,000 58 | Operational | |||||
English Farms | 25,300 11 | Operational | |||||
Ensign Wind | 98,900 43 | Operational | |||||
Eolos | 2,500 1 | Operational | |||||
Equity Industrial Partners | 4,000 2 | Operational | |||||
Erie | 1,200 1 | Operational | |||||
Erie Industrial Park | 900 1 | Operational | |||||
Escalade Wind | 252,000 45 | Operational | |||||
Escalade Wind | 84,000 20 | Operational | |||||
Eswood School | 225 1 | Operational | |||||
Euiph | 26,000 | Dismantled | |||||
Eva Creek Windfarm | 24,600 12 | Operational | |||||
Evansville WWTP | 100 1 | Operational | |||||
Eve | 2,500 1 | Operational | |||||
Even Keel Wind | 2,000,000 | Planned | |||||
Ewington Wind Farm | 21,000 10 | Operational | |||||
Excelsior Wind | 1,314,000 | Planned | |||||
F.E. Warren Air Force Base | 1,320 2 | Operational | |||||
Fair Wind | 30,000 12 | Operational | |||||
Fairbank | 6,000 3 | Dismantled | |||||
Fairbanks Wind | 72,450 21 | Operational | |||||
Fairfield | 10,080 6 | Operational | |||||
Fairhaven Wind | 3,000 2 | Operational | |||||
Falmouth I | 1,650 1 | Operational | |||||
Falmouth II | 3,300 2 | Dismantled | |||||
Falvez Astra | 163,200 68 | Operational | |||||
Farmers City | 146,000 73 | Operational | |||||
Farmer’s | 5,700 6 | Operational | |||||
Federated | 2,100 1 | Operational | |||||
Fenner Wind Power Project | 30,000 20 | Operational | |||||
Fenner Wind Power Project | 1,500 1 | Operational | |||||
Fenton Wind Power Project | 205,500 137 | Operational | |||||
FHSU Wind | 4,000 2 | Operational | |||||
Field’s Point Wastewater Treatment Facility | 4,500 3 | Operational | |||||
Findlay Whirlpool | 3,000 2 | Operational | |||||
Fire Island | 17,600 11 | Operational | |||||
Firewheel Wind | 301,740 107 | Operational | |||||
Firewheel Wind | 360,960 128 | Operational | |||||
Firewheel Wind | 211,500 75 | Operational | |||||
Flat Ridge I | 50,000 20 | Dismantled | |||||
Flat Ridge I | 40,000 20 | Dismantled | |||||
Flat Ridge I | 38,000 19 | Operational | |||||
Flat Ridge II | 470,400 294 | Operational | |||||
Flat Ridge III | 88,000 44 | Operational | |||||
Flat Ridge III | 39,600 18 | Operational | |||||
Flat Top | 200,000 100 | Operational | |||||
Flat Water Wind Farm | 60,000 40 | Operational | |||||
Fluvanna I | 155,400 74 | Operational | |||||
Flying Cloud | 43,500 29 | Operational | |||||
Foard City | 350,280 139 | Operational | |||||
Foote Creek | 66,000 | Operational | |||||
Foote Creek Rim I | 41,400 69 | Operational | |||||
Foote Creek Rim II | 1,800 3 | Dismantled | |||||
Foote Creek Rim III | 24,750 33 | Dismantled | |||||
Foote Creek Rim IV | 16,800 28 | Dismantled | |||||
Forbes Park | 600 1 | Operational | |||||
Ford County Wind | 120,400 43 | Operational | |||||
Forest City High School | 600 1 | Operational | |||||
Forest Creek | 87,400 38 | Operational | |||||
Forest Creek | 36,800 16 | Operational | |||||
Fort Hays State University | 4,000 2 | Operational | |||||
Fort Huachuca | 1,000 1 | Dismantled | |||||
Fort Totten | 100 1 | Operational | |||||
Forward | 29,400 14 | Operational | |||||
Forward Fontanelle (IA) | 1,600 1 | Operational | |||||
Forward Fontanelle (WI) | 1,600 1 | Operational | |||||
Forward Phase I | 99,000 66 | Operational | |||||
Forward Phase II | 30,000 20 | Operational | |||||
Fossil Gulch | 10,500 7 | Operational | |||||
Four Mile Ridge | 40,000 16 | Operational | |||||
Fowler Ridge - Clipper | 100,000 40 | Operational | |||||
Fowler Ridge - Vestas | 300,300 182 | Operational | |||||
Fowler Ridge II | 199,500 133 | Operational | |||||
Fox Islands Wind Project | 4,500 3 | Operational | |||||
Foxtail Wind | 136,000 68 | Operational | |||||
Foxtail Wind | 14,000 7 | Operational | |||||
Franklin County Wind | 99,000 60 | Operational | |||||
Freeborn (IA part) | 138,000 69 | Operational | |||||
Freeborn (IA part) | 14,000 7 | Operational | |||||
Freeborn (MN part) | 46,000 23 | Operational | |||||
Frisco | 20,000 10 | Operational | |||||
Frontier Windpower | 184,800 56 | Operational | |||||
Frontier Windpower | 15,000 5 | Operational | |||||
Frontier Windpower II | 355,200 74 | Operational | |||||
Future Generation Wind | 8,000 4 | Operational | |||||
Gaines Cavern Wind Project | 2,000 1 | Operational | |||||
Galactic Wind | 4,950 3 | Operational | |||||
Galactic Wind | 4,950 3 | Operational | |||||
Gambell Wind | 300 3 | Operational | |||||
Garden State Offshore Energy | 680,000 | Planned | |||||
Garnet Wind Project | 6,500 13 | Operational | |||||
GE 1 6 100 Prototype | 2,000 | Operational | |||||
GE 1 6 100 Prototype | 2,000 | Operational | |||||
Geneseo Wind Farm | 3,000 2 | Operational | |||||
Georgia Mountain | 10,000 4 | Operational | |||||
GL Wind | 5,000 2 | Operational | |||||
Glacier Hills | 162,000 90 | Operational | |||||
Glacier I | 106,500 71 | Operational | |||||
Glacier II | 103,500 69 | Operational | |||||
Glacier Sands Wind Power | 184,900 43 | Operational | |||||
Glaciers Edge | 34,500 15 | Operational | |||||
Glaciers Edge | 81,780 29 | Operational | |||||
Glaciers Edge | 95,760 38 | Operational | |||||
Glass Sands | 116,100 27 | Operational | |||||
Glass Sands | 2,000 1 | Operational | |||||
Glen Ullin Energy Center | 97,500 39 | Operational | |||||
Glen Ullin Energy Center | 9,200 4 | Operational | |||||
Glenrock I | 99,000 66 | Dismantled | |||||
Glenrock I | 122,100 66 | Operational | |||||
Glenrock II | 99,000 66 | Dismantled | |||||
Glenrock III | 39,000 26 | Dismantled | |||||
Glenrock III | 48,100 26 | Operational | |||||
Goat Mountain Phase I | 80,000 80 | Operational | |||||
Goat Mountain Phase II | 69,600 29 | Operational | |||||
Gob Nob | 900 1 | Operational | |||||
Gold Hills (OR) | 176,300 41 | Operational | |||||
Gold Hills (OR) | 25,000 10 | Operational | |||||
Golden Acorn Casino | 1,850 1 | Operational | |||||
Golden Hills | 81,600 48 | Operational | |||||
Golden Hills II | 86,700 51 | Operational | |||||
Golden Plains | 71,300 31 | Operational | |||||
Golden Plains | 128,520 51 | Operational | |||||
Golden Spread Panhandle Wind Ranch | 78,200 34 | Operational | |||||
Golden State Wind | 2,000,000 | Planned | |||||
Golden Valley Wind | 12,000 8 | Operational | |||||
Golden West Wind Farm | 246,500 145 | Operational | |||||
Goldthwaite | 7,500 3 | Operational | |||||
Goldthwaite | 141,100 83 | Operational | |||||
Goodland I | 130,500 87 | Operational | |||||
Goodnight wind farm | 248,400 69 | Under construction | |||||
Goodnight wind farm | 252,000 70 | Operational | |||||
Goodnoe Hills | 70,000 35 | Dismantled | |||||
Goodnoe Hills | 103,000 | Operational | |||||
Goodnoe Hills | 24,000 12 | Dismantled | |||||
Goodwell | 56,000 28 | Operational | |||||
Goodwell | 144,000 72 | Operational | |||||
Gopher Creek | 158,000 79 | Operational | |||||
Gordon Butte | 9,000 6 | Operational | |||||
Goshen North Project | 124,500 83 | Operational | |||||
Grady Wind | 220,500 84 | Operational | |||||
Grand Meadow | 100,500 67 | Operational | |||||
Grand Ridge I | 99,000 66 | Operational | |||||
Grand Ridge II | 51,000 34 | Operational | |||||
Grand Ridge III | 30,000 20 | Operational | |||||
Grand Ridge IV | 30,000 20 | Operational | |||||
Grande Prairie | 400,000 200 | Operational | |||||
Grandview | 105,610 59 | Operational | |||||
Grandview | 105,610 59 | Operational | |||||
Grandview II | 200,480 112 | Operational | |||||
Granite Reliable | 99,000 33 | Operational | |||||
Grant County | 21,000 10 | Operational | |||||
Grant Plains | 147,200 64 | Operational | |||||
Grant Wind | 151,800 66 | Operational | |||||
Gratiot Farms | 128,520 51 | Operational | |||||
Gratiot Farms | 16,100 7 | Operational | |||||
Gratiot Windfarm | 110,400 69 | Operational | |||||
Gratiot Windfarm | 102,400 64 | Operational | |||||
Gray County | 112,200 170 | Operational | |||||
Great Lakes Science Center | 225 1 | Operational | |||||
Great Pathfinder | 222,400 | Operational | |||||
Great Prairie | 210,000 | Operational | |||||
Great Prairie | 299,000 | Operational | |||||
Great Prairie | 358,000 | Operational | |||||
Great Prairie Wind 3 | 50,760 18 | Operational | |||||
Great River Energy Headquarters | 225 1 | Operational | |||||
Great Western | 99,000 30 | Operational | |||||
Great Western | 126,000 63 | Operational | |||||
Green Energy Machine | 1,790 1 | Operational | |||||
Green Mountain Power (Illinois) | 500 1 | Operational | |||||
Green Mountain Power (Vermont) | 5,500 11 | Operational | |||||
Green Mountain Wind Farm | 10,400 8 | Dismantled | |||||
Green Pastures I | 150,000 50 | Operational | |||||
Green Pastures II | 150,000 50 | Operational | |||||
Green Ridge Power | 12,300 41 | Operational | |||||
Green Ridge Power | 134,300 1,343 | Operational | |||||
Green River Wind Farm | 194,250 74 | Operational | |||||
Greenfield | 32,500 13 | Operational | |||||
Greenfield Wind | 1,600 1 | Operational | |||||
Greensburg | 12,500 10 | Operational | |||||
Greenville Whirlpool | 4,500 3 | Operational | |||||
Griffin Trail | 225,600 80 | Operational | |||||
Groton | 48,000 24 | Operational | |||||
Gruver Wind | 155,100 55 | Operational | |||||
GSA | 200 2 | Operational | |||||
GSG Wind Farm | 80,000 40 | Dismantled | |||||
GSG Wind Farm | 80,000 26 | Operational | |||||
Gulf Wind | 283,200 118 | Dismantled | |||||
Gulf Wind | 271,400 118 | Operational | |||||
Gunsight | 119,930 67 | Operational | |||||
Guthrie WWTP | 100 1 | Operational | |||||
GWE LLC | 4,000 2 | Operational | |||||
GWE LLC | 4,000 2 | Operational | |||||
Hackberry | 165,600 72 | Operational | |||||
Hale Wind | 432,000 216 | Operational | |||||
Hale Wind | 46,000 23 | Operational | |||||
Half Hollow Nursery | 100 1 | Operational | |||||
Hancock | 56,100 17 | Operational | |||||
Hancock County Wind Farm | 97,680 148 | Operational | |||||
Happy Jack | 29,400 14 | Operational | |||||
Harbec Plastic wind turbine | 250 1 | Operational | |||||
Harbec Plastic wind turbine | 850 1 | Operational | |||||
Harbor Wind | 9,000 6 | Operational | |||||
Hardin Hilltop | 14,700 7 | Operational | |||||
Hardscrabble | 74,000 37 | Operational | |||||
Harpster Wind | 1,500 1 | Operational | |||||
Harvest Ridge (Exelon) wind farm | 202,000 | Operational | |||||
Harvest Wind 1 | 52,800 32 | Operational | |||||
Harvest Wind 2 | 59,400 33 | Operational | |||||
Harvest Wind Farm | 98,900 43 | Operational | |||||
Hasslebach Meats | 100 1 | Operational | |||||
Hatchett Ridge | 101,200 44 | Operational | |||||
Haviland | 4,500 3 | Operational | |||||
Hawai Renewable | 10,560 16 | Operational | |||||
Hawkeye | 36,000 15 | Operational | |||||
Hay Canyon | 100,800 48 | Operational | |||||
Haystack | 43,200 18 | Operational | |||||
Haystack | 225,000 45 | Operational | |||||
Headwaters | 200,000 100 | Operational | |||||
Headwaters II | 151,200 36 | Operational | |||||
Headwaters II | 46,800 13 | Operational | |||||
Heart of Texas | 169,200 60 | Operational | |||||
Heart of Texas | 2,520 1 | Operational | |||||
Heart of Texas | 8,160 3 | Operational | |||||
Heartland College | 1,650 1 | Operational | |||||
Heartland Divide | 6,800 4 | Operational | |||||
Heartland Divide | 80,000 32 | Operational | |||||
Heartland Divide Wind II | 199,400 72 | Operational | |||||
Heartland Farms | 201,000 72 | Operational | |||||
Helena wind farm | 268,000 66 | Operational | |||||
Helzel & Schwarzhoff 88 | 6,000 8 | Operational | |||||
Helzel & Schwarzhoff 88 | 16,500 22 | Operational | |||||
Hereford I | 99,900 54 | Operational | |||||
Hereford I | 100,000 50 | Operational | |||||
Heritage Flight | 100 1 | Operational | |||||
Heritage Garden | 28,000 14 | Operational | |||||
Hidalgo II | 50,400 14 | Operational | |||||
High Banks Wind | 643,000 | Under construction | |||||
High Lonesome (NM) | 100,000 40 | Dismantled | |||||
High Lonesome (NM) | 100,000 40 | Operational | |||||
High Lonesome (TX) | 135,135 39 | Operational | |||||
High Lonesome (TX) | 147,000 49 | Operational | |||||
High Lonesome (TX) | 50,600 22 | Operational | |||||
High Lonesome (TX) | 107,100 34 | Operational | |||||
High Lonesome (TX) | 41,400 18 | Operational | |||||
High Lonesome (TX) | 50,600 22 | Operational | |||||
High Mesa | 39,900 19 | Operational | |||||
High Plains | 99,000 66 | Dismantled | |||||
High Plains | 122,100 66 | Operational | |||||
High Plains Tech Center | 100 1 | Operational | |||||
High Prairie | 358,600 163 | Operational | |||||
High Prairie | 41,400 12 | Operational | |||||
High Sheldon | 112,500 75 | Operational | |||||
High Winds | 162,000 90 | Operational | |||||
Highland | 495,006 211 | Operational | |||||
Highland II | 7,038 3 | Operational | |||||
Highland North | 72,500 29 | Operational | |||||
Highland North | 2,500 1 | Operational | |||||
Highland Wind Project | 62,500 25 | Operational | |||||
Highmore Wind Energy Project | 40,500 27 | Operational | |||||
Hilltop | 2,000 1 | Operational | |||||
HillTopper | 185,000 74 | Operational | |||||
Hodges Badge | 250 1 | Operational | |||||
Hog Creek | 66,000 30 | Operational | |||||
Holcim - Paulding Wind | 4,500 3 | Operational | |||||
Holiday Hill Community Wind | 5,000 2 | Operational | |||||
Holy Name Central Catholic School | 600 1 | Operational | |||||
Hometown WindPower Anoka | 160 1 | Operational | |||||
Hometown WindPower Arlington | 160 1 | Operational | |||||
Hometown WindPower Brownton | 160 1 | Operational | |||||
Hometown WindPower Buffalo | 160 1 | Operational | |||||
Hometown WindPower Chaska | 160 1 | Operational | |||||
Hometown WindPower East Grand Forks | 160 1 | Operational | |||||
Hometown WindPower Faribault | 160 1 | Operational | |||||
Hometown WindPower North St. Paul | 160 1 | Operational | |||||
Hometown WindPower Shakopee | 160 1 | Operational | |||||
Hometown WindPower Winthrop | 160 1 | Operational | |||||
Honda Transmissions Manufacturing | 3,400 2 | Operational | |||||
Hooper Bay | 300 3 | Operational | |||||
Hoopeston | 98,000 49 | Operational | |||||
Hoosac | 31,350 19 | Operational | |||||
Hoosier | 108,650 53 | Operational | |||||
Hopkins Ridge I | 149,400 83 | Operational | |||||
Hopkins Ridge II | 7,200 4 | Operational | |||||
Horizon Hill | 202,000 34 | Operational | |||||
Horse Butte Wind | 57,600 32 | Operational | |||||
Horse Creek | 230,000 100 | Operational | |||||
Horse Hollow I | 3,000 2 | Operational | |||||
Horse Hollow I | 210,000 140 | Operational | |||||
Horse Hollow II | 299,000 130 | Dismantled | |||||
Horse Hollow II | 299,000 130 | Operational | |||||
Horse Hollow III | 223,500 149 | Dismantled | |||||
Horse Hollow III | 224,000 | Operational | |||||
Horseshoe Bend | 9,000 6 | Operational | |||||
Hot Springs | 21,000 10 | Operational | |||||
Howard | 51,250 25 | Operational | |||||
Howard II | 4,100 2 | Operational | |||||
Howard Wind Energy Project | 220 2 | Operational | |||||
Hubbard | 25,000 10 | Operational | |||||
Hubbard | 276,360 98 | Operational | |||||
Hudson South E | 1,635,000 | Planned | |||||
Hueco Mountain Wind Ranch | 1,320 2 | Dismantled | |||||
Huerfano River Wind Farm | 8,000 4 | Operational | |||||
Hull | 660 1 | Operational | |||||
Hull II | 1,800 1 | Operational | |||||
Humboldt SW | 1,000,000 | Planned | |||||
Huron Schools | 100 1 | Operational | |||||
Hyannis Country Garden | 100 1 | Operational | |||||
IBEW Local 103 | 100 1 | Operational | |||||
Icebreaker | 20,700 6 | Approved | |||||
Ida Grove | 276,000 120 | Operational | |||||
Ida Grove | 25,060 14 | Operational | |||||
Ida Grove II | 18,400 8 | Operational | |||||
Ida Grove II | 183,960 73 | Operational | |||||
IDWGP | 2,250 3 | Operational | |||||
Illinois Rural Electric Cooperative | 1,650 1 | Operational | |||||
Independence wind farm | 56,400 20 | Operational | |||||
Independence wind farm | 4,600 2 | Operational | |||||
Indian Mesa | 3,000 1 | Operational | |||||
Indian Mesa Wind Farm | 82,500 125 | Dismantled | |||||
Indian Mesa Wind Farm | 82,000 | Operational | |||||
Indiana Crossroads | 302,400 72 | Operational | |||||
Indiana Crossroads II | 202,000 | Under construction | |||||
Inertia Wind Project | 33,600 12 | Operational | |||||
Inertia Wind Project | 38,000 19 | Operational | |||||
Inertia Wind Project | 320,000 64 | Operational | |||||
Inland Empire Utility Agency (IEUA) | 1,000 1 | Operational | |||||
Intrepid | 160,500 107 | Dismantled | |||||
Intrepid | 160,500 107 | Operational | |||||
Intrepid Expansion | 15,000 15 | Operational | |||||
Iowa Lake Superior Wind | 10,500 7 | Operational | |||||
Iowa Lakes Community College | 1,650 1 | Operational | |||||
Iowa Lakes Lakota Wind | 10,500 7 | Operational | |||||
Iowa State Fair Wind Turbine | 660 1 | Operational | |||||
Ipswich | 1,600 1 | Operational | |||||
Ipswich | 2,000 1 | Operational | |||||
Irish Creek | 301,660 108 | Operational | |||||
Iron Star Wind Project | 297,600 62 | Operational | |||||
Ironwood I | 167,900 73 | Operational | |||||
Isabella Wind I & II | 341,220 121 | Operational | |||||
Isabella Wind I & II | 42,300 15 | Operational | |||||
Ivester | 12,075 5 | Operational | |||||
Ivester | 78,750 30 | Operational | |||||
Javelina | 19,690 11 | Operational | |||||
Javelina | 230,000 115 | Operational | |||||
Javelina II | 200,000 100 | Operational | |||||
Jawbone Wind Project | 80,000 38 | Under construction | |||||
Jayhawk Wind | 197,400 70 | Operational | |||||
JD Wind 1 | 10,000 8 | Operational | |||||
JD Wind 10 | 10,000 8 | Operational | |||||
JD Wind 11 | 10,000 8 | Operational | |||||
JD Wind 2 | 10,000 8 | Dismantled | |||||
JD Wind 3 | 10,000 8 | Dismantled | |||||
JD Wind 4 | 79,800 38 | Operational | |||||
JD Wind 5 | 10,000 8 | Operational | |||||
JD Wind 6 | 10,000 8 | Operational | |||||
JD WInd 7 | 10,000 8 | Operational | |||||
JD Wind 8 | 10,000 8 | Operational | |||||
JD Wind 9 | 10,000 8 | Operational | |||||
Jeffers | 50,000 20 | Dismantled | |||||
Jeffers Repowering | 44,000 20 | Operational | |||||
Jericho Mountain | 14,250 5 | Operational | |||||
Jericho Rise | 77,700 37 | Operational | |||||
Jersey Atlantic Wind Farm | 7,500 5 | Operational | |||||
Jett Creek | 10,000 5 | Operational | |||||
Jiminy Peak Ski Resort | 1,500 1 | Operational | |||||
JJNWind Farm | 1,500 1 | Operational | |||||
Johnson Controls | 100 1 | Operational | |||||
Jordan Creek | 226,800 90 | Operational | |||||
Jordan Creek | 113,400 45 | Operational | |||||
Jordan Creek | 32,200 14 | Operational | |||||
Judith Gap | 135,000 90 | Operational | |||||
Jumbo Hill | 160,740 57 | Operational | |||||
Jumbo Road | 299,700 162 | Operational | |||||
Junction Hilltop Wind | 8,000 5 | Operational | |||||
Juniper Canyon | 151,200 63 | Operational | |||||
Kaheawa I | 30,000 20 | Operational | |||||
Kaheawa II | 21,000 14 | Operational | |||||
Kahuku | 30,000 12 | Operational | |||||
Kamaoa | 9,250 37 | Dismantled | |||||
Kansas State University | 100 1 | Operational | |||||
Karankawa | 50,600 22 | Operational | |||||
Karankawa | 234,360 93 | Operational | |||||
Karankawa | 22,500 9 | Operational | |||||
Karen Avenue (San Gorgonio Farms) | 3,000 6 | Operational | |||||
Karen Avenue II (San Gorgonio Farms) | 4,500 3 | Operational | |||||
Kas Farms | 1,500 2 | Operational | |||||
Kasigluk | 300 3 | Operational | |||||
Kawailoa | 69,000 30 | Operational | |||||
Kay Wind | 299,000 130 | Operational | |||||
Keechi | 110,000 55 | Operational | |||||
Keenan II | 151,800 66 | Operational | |||||
Kelly Creek | 184,000 92 | Operational | |||||
Kenetech | 30,300 101 | Operational | |||||
Kenston School District | 750 1 | Operational | |||||
Keuka 125kW Rim Drive Prototype | 125 1 | Dismantled | |||||
Kibby Mountain - Phase I | 66,000 22 | Operational | |||||
Kibby Mountain - Phase II | 66,000 22 | Operational | |||||
Kimball | 10,500 7 | Dismantled | |||||
Kimball | 30,000 12 | Operational | |||||
King Creek wind farm | 209,000 | Operational | |||||
King Creek wind farm | 184,000 | Operational | |||||
King Mountain Wind Ranch | 3,000 1 | Operational | |||||
King Mountain Wind Ranch | 76,700 59 | Operational | |||||
King Mountain Wind Ranch | 2,600 2 | Operational | |||||
King Mountain Wind Ranch | 198,900 153 | Operational | |||||
King Plains | 248,160 88 | Operational | |||||
Kingdom Community Wind | 63,000 21 | Operational | |||||
Kingfisher | 118,000 59 | Operational | |||||
Kingfisher | 180,000 90 | Operational | |||||
Kingman (AZ) | 10,000 5 | Operational | |||||
Kingman (KS) | 17,900 10 | Operational | |||||
Kingman (KS) | 188,650 110 | Operational | |||||
Kings Point | 125,400 57 | Operational | |||||
Kings Point | 24,000 12 | Operational | |||||
Kingston | 2,000 1 | Dismantled | |||||
Kirkwood Community College | 2,500 1 | Operational | |||||
Kit Carson Project | 51,000 34 | Operational | |||||
Kittitas Valley Wind Farm | 100,800 48 | Operational | |||||
Kitty Hawk North | 1,000,000 | Planned | |||||
Kitty Hawk South | 2,500,000 | Planned | |||||
Klondike I | 24,000 16 | Operational | |||||
Klondike II | 75,000 50 | Dismantled | |||||
Klondike II | 80,000 50 | Operational | |||||
Klondike III | 2,400 1 | Operational | |||||
Klondike III | 101,200 44 | Operational | |||||
Klondike III | 120,000 80 | Operational | |||||
Klondike IIIA | 76,500 51 | Operational | |||||
KODE Novus 1 | 80,000 40 | Dismantled | |||||
KODE Novus 2 | 4,000 20 | Dismantled | |||||
Kodiak Island Wind Project | 4,500 3 | Operational | |||||
Kossuth | 126,900 45 | Operational | |||||
Kossuth | 25,300 11 | Operational | |||||
Kossuth County Wind | 7,560 3 | Operational | |||||
Kossuth County Wind | 62,040 22 | Operational | |||||
Kotzebue Wind Project | 100 1 | Operational | |||||
Kotzebue Wind Project | 1,800 2 | Operational | |||||
Kumeyaay | 50,000 25 | Operational | |||||
La Chalupa | 198,450 63 | Operational | |||||
La Joya | 306,000 111 | Operational | |||||
Lac qui Parle Valley School | 230 1 | Operational | |||||
Lacy Creek | 304,560 108 | Operational | |||||
Lafayette CityBus | 300 3 | Operational | |||||
Lake Benton I | 106,500 142 | Operational | |||||
Lake Benton II | 103,500 138 | Dismantled | |||||
Lake Benton II | 89,700 39 | Operational | |||||
Lake Benton II | 2,100 1 | Operational | |||||
Lake Benton II | 8,400 4 | Operational | |||||
Lake Charles | 1,244,000 | Planned | |||||
Lake Palmdale | 950 1 | Operational | |||||
Lake Region State College | 1,600 1 | Operational | |||||
Lake Winds Energy Park | 100,800 56 | Operational | |||||
Lakefield | 205,500 137 | Operational | |||||
Lakeswind | 48,000 32 | Operational | |||||
Lakeview Ridge | 900 1 | Operational | |||||
Lakota Ridge | 8,250 11 | Operational | |||||
Lakota Ridge | 2,640 4 | Operational | |||||
Lakota Wind | 1,900 2 | Operational | |||||
Lalamilo Wells | 3,300 5 | Operational | |||||
Lamar | 1,500 1 | Operational | |||||
Lamar | 1,500 1 | Operational | |||||
Lamar | 4,500 3 | Operational | |||||
Langdon I | 19,500 13 | Dismantled | |||||
Langdon I | 59,940 37 | Dismantled | |||||
Langdon I | 46,980 29 | Dismantled | |||||
Langdon I | 59,940 37 | Operational | |||||
Langdon I | 19,500 13 | Operational | |||||
Langdon I | 46,980 29 | Operational | |||||
Langdon II | 40,500 27 | Dismantled | |||||
Langdon II | 40,500 27 | Operational | |||||
Langdon II | 43,740 27 | Operational | |||||
Langford | 150,000 100 | Dismantled | |||||
Langford | 160,000 100 | Operational | |||||
Laredo Ridge | 81,000 54 | Operational | |||||
Las Lomas (TX) | 21,000 5 | Operational | |||||
Las Lomas (TX) | 180,600 43 | Operational | |||||
Las Majadas | 259,600 118 | Operational | |||||
Las Majadas | 14,000 7 | Operational | |||||
Latigo | 62,100 27 | Operational | |||||
Laurel Hill | 69,000 30 | Operational | |||||
Laurel Mountain | 97,600 61 | Operational | |||||
Laurel Project | 119,600 52 | Operational | |||||
Leading Light Wind | 1,725,000 | Planned | |||||
Leaning Juniper | 100,500 67 | Dismantled | |||||
Leaning Juniper 2a | 90,300 43 | Operational | |||||
Leaning Juniper 2b | 111,000 74 | Operational | |||||
Leaning Juniper Repowering | 109,000 | Operational | |||||
Ledyard Windpower | 207,000 46 | Operational | |||||
Lempster Wind Farm | 24,000 12 | Operational | |||||
Lenox Municipal Utilities | 750 1 | Operational | |||||
Leon Sneve Wind Project | 1,500 1 | Operational | |||||
Leonardo Wind 1 | 3,000 | Operational | |||||
Lewandowski Wind | 300 3 | Dismantled | |||||
Lime Wind | 1,500 3 | Operational | |||||
Lime Wind | 1,500 3 | Operational | |||||
Limestone Wind | 295,800 87 | Operational | |||||
Limon Wind I | 200,000 125 | Operational | |||||
Limon Wind II | 200,000 125 | Operational | |||||
Limon Wind III | 205,700 121 | Operational | |||||
Lincoln County Wind Farm | 900 1 | Operational | |||||
Lincoln Electric | 2,500 1 | Operational | |||||
Lincoln Land Wind | 301,740 107 | Operational | |||||
Lindahl | 150,000 75 | Operational | |||||
Linden | 8,200 4 | Operational | |||||
Linden | 43,050 21 | Operational | |||||
Little Blue Wind | 250,000 100 | Operational | |||||
Little Cedar | 1,500 1 | Operational | |||||
Little Elk | 74,000 37 | Operational | |||||
Little Pringle I | 10,000 5 | Operational | |||||
Little Pringle II | 10,000 5 | Operational | |||||
Live Oak | 199,500 76 | Operational | |||||
Llano Estacado | 80,000 80 | Operational | |||||
Llano Estacado Wind Ranch | 1,320 2 | Operational | |||||
Llano Estacado Wind Ranch | 660 1 | Operational | |||||
LLC 2 | 200 2 | Operational | |||||
Lockett | 183,750 75 | Operational | |||||
Locust Ridge I | 26,000 13 | Operational | |||||
Locust Ridge II | 102,000 51 | Operational | |||||
Loess Hills Wind Energy Center | 5,000 4 | Operational | |||||
Logan Wind Energy | 201,000 134 | Operational | |||||
Logan’s Gap | 200,100 87 | Operational | |||||
Lon Wright wind farm | 41,000 | Operational | |||||
Lone Star I (4Q07) | 18,000 9 | Operational | |||||
Lone Star I (Q2) | 72,000 36 | Operational | |||||
Lone Star I (Q3) | 110,000 55 | Operational | |||||
Lone Star II (1Q08) | 104,000 52 | Operational | |||||
Lone Star II (2Q08) | 52,000 26 | Operational | |||||
Lone Star II (4Q07) | 44,000 22 | Operational | |||||
Lone Tree | 81,200 29 | Operational | |||||
Lone Tree | 6,900 3 | Operational | |||||
Longhorn | 200,000 100 | Operational | |||||
Lookout | 37,800 18 | Operational | |||||
Loraine | 100,500 67 | Operational | |||||
Loraine | 49,500 33 | Operational | |||||
Loranger Power Generation | 1,400 4 | Operational | |||||
Lorenzo Winds | 69,000 30 | Operational | |||||
Lorenzo Winds | 6,860 4 | Operational | |||||
Los Mirasoles | 150,000 75 | Operational | |||||
Los Mirasoles | 100,000 50 | Operational | |||||
Los Vientos I | 200,100 87 | Operational | |||||
Los Vientos II | 201,600 84 | Operational | |||||
Los Vientos III | 200,000 100 | Operational | |||||
Los Vientos IV | 200,000 100 | Operational | |||||
Los Vientos V | 110,000 55 | Operational | |||||
Lost Creek Ridge Wind Farm | 150,000 100 | Operational | |||||
Lost Lakes Wind Farm | 100,650 61 | Operational | |||||
Lower Snake River I | 216,200 94 | Operational | |||||
Lower Snake River I | 126,500 55 | Operational | |||||
Lubbock Wind Ranch I | 7,500 3 | Operational | |||||
Lundgren | 251,022 107 | Operational | |||||
Luther College Turbine | 1,600 1 | Operational | |||||
Luverne | 49,500 33 | Operational | |||||
LWSC Wind Turbine | 600 1 | Operational | |||||
Macho Springs | 50,400 28 | Operational | |||||
Mackinaw City | 1,800 2 | Operational | |||||
Macksburg | 119,646 51 | Operational | |||||
Madison Wind Power Project | 11,550 7 | Operational | |||||
Magic Valley I | 203,280 112 | Operational | |||||
Maiden Winds | 8,250 5 | Operational | |||||
Maine Research Array | 144,000 | Planned | |||||
Majestic | 80,000 | Dismantled | |||||
Majestic | 32,000 20 | Operational | |||||
Majestic | 49,600 31 | Operational | |||||
Majestic | 84,800 53 | Operational | |||||
Mammoth Plains | 198,900 117 | Operational | |||||
Mann Packing | 1,790 1 | Operational | |||||
Manzana | 189,000 126 | Operational | |||||
Maple Ridge | 33,000 20 | Operational | |||||
Maple Ridge | 61,050 37 | Operational | |||||
Maple Ridge | 136,950 83 | Operational | |||||
Maple Ridge II | 90,750 55 | Operational | |||||
Marble River | 215,250 70 | Operational | |||||
Marengo I | 140,400 78 | Dismantled | |||||
Marengo I | 156,000 78 | Operational | |||||
Marengo II | 70,200 39 | Dismantled | |||||
Marengo II | 78,000 39 | Operational | |||||
Margaretta Elementary School | 100 1 | Operational | |||||
Mariah North | 230,400 96 | Operational | |||||
Marion Whirlpool | 4,500 3 | Operational | |||||
Mark Richey Woodworking | 600 1 | Operational | |||||
Mars Hill | 33,000 22 | Operational | |||||
Mars Hill | 9,000 6 | Operational | |||||
Marsh Hill | 16,200 10 | Operational | |||||
Marshall (KS) | 72,000 36 | Operational | |||||
Marshall Wind Farm | 18,900 9 | Operational | |||||
Marshalltown | 110 1 | Operational | |||||
Martinsdale Colony South | 2,000 8 | Operational | |||||
Maryneal | 182,400 38 | Operational | |||||
Mason City | 4,000 2 | Operational | |||||
Mason City | 6,000 3 | Operational | |||||
Mason City Wind | 2,300 1 | Operational | |||||
Mason City Wind | 5,640 2 | Operational | |||||
Mason Wind Perry | 6,000 3 | Operational | |||||
Massachusetts Maritime Academy | 660 1 | Operational | |||||
Maverick Creek | 306,600 73 | Operational | |||||
Maverick Creek | 76,800 16 | Operational | |||||
Maverick Creek | 20,000 10 | Operational | |||||
Maverick Creek | 22,000 10 | Operational | |||||
Maverick Creek | 59,200 16 | Operational | |||||
Maverick Wind Energy Center | 288,400 103 | Operational | |||||
McAdoo | 150,000 100 | Operational | |||||
McEvoy Ranch | 225 1 | Operational | |||||
McFadden Ridge | 28,000 | Dismantled | |||||
McFadden Ridge | 35,150 19 | Operational | |||||
McKinley Wind Park | 14,400 9 | Operational | |||||
McNeilus | 9,900 6 | Operational | |||||
McNeilus | 13,500 9 | Operational | |||||
McNeilus | 9,000 6 | Operational | |||||
McNeilus | 1,650 1 | Operational | |||||
McNeilus | 9,000 10 | Operational | |||||
Meadow Creek | 119,700 57 | Operational | |||||
Meadow Lake I | 199,650 121 | Operational | |||||
Meadow Lake II (2Q10) | 91,500 61 | Operational | |||||
Meadow Lake II (3Q10) | 7,500 5 | Operational | |||||
Meadow Lake III | 103,500 69 | Operational | |||||
Meadow Lake IV | 98,700 47 | Operational | |||||
Meadow Lake V | 100,000 50 | Operational | |||||
Meadow Lake VI | 24,000 12 | Operational | |||||
Meadow Lake VI | 176,400 49 | Operational | |||||
Meadow Ridge | 1,600 1 | Operational | |||||
Medicine Bow | 1,420 2 | Operational | |||||
Medicine Bow | 3,550 5 | Operational | |||||
Medicine Bow | 1,420 2 | Operational | |||||
Medicine Bow 3 | 2,500 1 | Dismantled | |||||
Mehoopany Wind Farm | 104,000 65 | Operational | |||||
Mehoopany Wind Farm | 36,800 23 | Operational | |||||
Mendota Hills | 53,550 63 | Dismantled | |||||
Mendota Hills Repowering | 76,130 29 | Operational | |||||
Meridian Trust | 7,400 74 | Operational | |||||
Meridian Trust | 150 1 | Operational | |||||
Meridian Way | 105,000 35 | Operational | |||||
Meridian Way II | 96,000 32 | Operational | |||||
Meridian Wind Park | 225,000 77 | Operational | |||||
Merricourt | 150,000 75 | Operational | |||||
Mesalands Community College | 1,500 1 | Operational | |||||
Mesquite Creek | 211,220 118 | Operational | |||||
Mesquite Sky wind farm | 345,000 69 | Operational | |||||
Mesquite Star | 418,900 118 | Operational | |||||
Mesteno | 201,600 56 | Operational | |||||
Method Manufacturing Plant | 600 1 | Operational | |||||
Metro Wind LLC | 660 1 | Operational | |||||
Meyersdale | 30,000 20 | Operational | |||||
Miami | 288,600 156 | Operational | |||||
Michelangelo Wind 4 | 3,000 | Operational | |||||
Michigan I | 69,000 46 | Operational | |||||
Michigan II | 90,000 50 | Operational | |||||
Midland | 106,000 | Under construction | |||||
Midway Wind | 162,855 47 | Operational | |||||
Milford Wind Corridor - Phase I (Clipper) | 145,000 58 | Operational | |||||
Milford Wind Corridor - Phase I (GE Energy) | 58,500 39 | Operational | |||||
Milford Wind Corridor - Phase II (GE Energy) | 102,000 68 | Operational | |||||
Mill Run Wind Power Project | 15,000 10 | Operational | |||||
Milligan 1 Wind | 66,000 33 | Operational | |||||
Milligan 1 Wind | 99,000 36 | Operational | |||||
Milligan 1 Wind | 135,000 30 | Operational | |||||
Milner Dam Wind | 19,500 13 | Operational | |||||
Milo | 50,000 25 | Operational | |||||
Minco Wind I | 99,200 62 | Dismantled | |||||
Minco Wind I | 99,000 | Operational | |||||
Minco Wind II | 98,000 | Operational | |||||
Minco Wind II | 100,800 63 | Dismantled | |||||
Minco Wind III | 111,000 | Operational | |||||
Minco Wind III | 100,800 63 | Dismantled | |||||
Minco Wind IV | 25,000 10 | Operational | |||||
Minco Wind IV | 66,700 29 | Operational | |||||
Minco Wind IV | 10,140 6 | Operational | |||||
Minco Wind IV | 24,010 14 | Operational | |||||
Minco Wind IV | 1,140 1 | Operational | |||||
Minden Wind Park | 32,000 | Operational | |||||
Minden Wind Park | 32,000 20 | Operational | |||||
Minn-Dakota Wind Farm (MN) | 96,000 64 | Operational | |||||
Minn-Dakota Wind Farm (SD) | 54,000 36 | Operational | |||||
Minnesota Wind Share | 5,400 3 | Operational | |||||
Minonk | 200,000 100 | Operational | |||||
MinWind I-II | 3,800 4 | Operational | |||||
MinWind III-IX | 11,550 7 | Operational | |||||
Missouri River Energy Services (MRES) | 1,900 2 | Operational | |||||
Missouri River Energy Services (MRES) | 1,800 2 | Operational | |||||
Mogul Energy | 4,000 8 | Operational | |||||
Mojave 16-17-18 | 18,000 30 | Operational | |||||
Mojave 16-17-18 | 66,750 267 | Operational | |||||
Mojave 3 & 5 | 50,600 184 | Operational | |||||
Mojave 4 | 31,900 116 | Operational | |||||
Mojave-Morowind | 35,400 59 | Operational | |||||
Momentum Wind | 808,500 | Planned | |||||
Montague | 183,600 51 | Operational | |||||
Montague | 17,250 5 | Operational | |||||
Montezuma Wind I | 36,800 16 | Operational | |||||
Montezuma Wind II | 78,200 34 | Operational | |||||
Montfort Wind Farm | 30,000 20 | Operational | |||||
Moorhead | 750 1 | Operational | |||||
Moorhead | 750 1 | Operational | |||||
Moraine I | 51,000 34 | Operational | |||||
Moraine II | 49,500 33 | Operational | |||||
Moraine Sands | 170,000 | Under construction | |||||
Morning light | 101,200 44 | Operational | |||||
Mount St. Mary’s Abbey | 100 1 | Operational | |||||
Mount Storm | 164,000 82 | Operational | |||||
Mount Storm II | 100,000 50 | Operational | |||||
Mount Wachusetts Wind Farm | 3,000 2 | Operational | |||||
Mount Wachusetts Wind Farm | 3,300 2 | Operational | |||||
Mountain Air Projects | 23,000 10 | Operational | |||||
Mountain Air Projects | 23,000 10 | Operational | |||||
Mountain Air Projects | 23,000 10 | Operational | |||||
Mountain Air Projects | 23,000 10 | Operational | |||||
Mountain Air Projects | 23,000 10 | Operational | |||||
Mountain Air Projects | 23,000 10 | Operational | |||||
Mountain Breeze | 155,100 55 | Operational | |||||
Mountain Breeze | 13,800 6 | Operational | |||||
Mountain Home | 42,000 20 | Operational | |||||
Mountain Lake Wind | 15,000 12 | Operational | |||||
Mountain Peak Special Utility District | 100 1 | Operational | |||||
Mountain View Grand Resort | 100 1 | Operational | |||||
Mountain View I | 44,400 74 | Dismantled | |||||
Mountain View II | 22,200 37 | Operational | |||||
Mountain View III | 22,440 34 | Operational | |||||
Mountain View IV | 49,000 49 | Operational | |||||
Mountain View Power Partners Repower | 55,900 13 | Operational | |||||
Mountain View Power Partners Repower | 10,800 3 | Operational | |||||
Mountain Wind I | 60,900 29 | Operational | |||||
Mountain Wind II | 79,800 38 | Operational | |||||
Mountaineer Wind Energy Center | 66,000 44 | Operational | |||||
Mower County | 98,900 43 | Dismantled | |||||
Mower County | 99,000 | Operational | |||||
Mozart | 30,000 12 | Operational | |||||
Munnsville | 34,500 23 | Operational | |||||
Musselshell Wind Project I | 10,500 7 | Operational | |||||
Musselshell Wind Project II | 10,500 7 | Operational | |||||
MUTI | 100 1 | Operational | |||||
MWRA Deer Island | 1,200 2 | Operational | |||||
Na Pua Makani | 27,600 8 | Operational | |||||
Nantucket High School | 100 1 | Operational | |||||
Nature’s Classroom | 100 1 | Operational | |||||
Neosho Ridge Wind | 253,000 115 | Operational | |||||
Neosho Ridge Wind | 52,800 24 | Operational | |||||
Neppel Wind Power Project | 1,500 1 | Operational | |||||
Nestle Waters II | 1,850 1 | Operational | |||||
Nevada High School | 500 2 | Operational | |||||
New Creek | 8,000 4 | Operational | |||||
New Creek | 94,500 45 | Operational | |||||
New England Aqua Ventus | 12,000 | Planned | |||||
New England Tech | 100 1 | Operational | |||||
New Frontier | 100,050 29 | Operational | |||||
New Harvest | 100,000 50 | Operational | |||||
New London | 1,500 1 | Operational | |||||
New Mexico Wind Energy Center | 204,000 136 | Operational | |||||
New York State Thruway Authority | 100 1 | Operational | |||||
NEXGEN | 100 1 | Operational | |||||
Nextera Dekalb County Wind | 217,500 145 | Operational | |||||
Nine Canyon I | 48,100 37 | Operational | |||||
Nine Canyon II | 15,600 12 | Operational | |||||
Nine Canyon III | 32,200 14 | Operational | |||||
Ninnescah | 17,900 10 | Operational | |||||
Ninnescah | 190,365 111 | Operational | |||||
Niyol | 203,040 72 | Operational | |||||
No Fossil Fuel - Kingston | 6,000 3 | Operational | |||||
Noble Altona Windpark | 97,500 65 | Operational | |||||
Noble Bliss Windpark | 100,500 67 | Operational | |||||
Noble Chateaugay | 106,500 71 | Operational | |||||
Noble Clinton Windpark | 100,500 67 | Operational | |||||
Noble Ellenburg Windpark | 81,000 54 | Operational | |||||
Noble Great Plains | 114,000 76 | Operational | |||||
Noble Wethersfield | 126,000 84 | Operational | |||||
Nobles | 201,000 134 | Operational | |||||
Nobles | 2,100 1 | Operational | |||||
Nobles 2 | 230,400 64 | Operational | |||||
Nobles 2 | 20,000 10 | Operational | |||||
Nome Newton Peak | 1,800 2 | Operational | |||||
Nordex Energy | 10,000 10 | Operational | |||||
NORESCO | 100 1 | Operational | |||||
Norgaard Wind Project | 8,750 7 | Operational | |||||
North Allegheny | 70,000 35 | Operational | |||||
North Dakota Wind I | 40,500 27 | Operational | |||||
North Dakota Wind II | 21,000 14 | Operational | |||||
North English I | 200,000 100 | Operational | |||||
North English II | 140,000 70 | Operational | |||||
North Fork Ridge | 125,400 57 | Operational | |||||
North Fork Ridge | 24,000 12 | Operational | |||||
North Kingstown Green | 1,500 1 | Operational | |||||
North Newton School Corporation | 900 1 | Operational | |||||
North Shaokatan Wind Farm | 11,880 18 | Operational | |||||
North Sky River Wind Energy Center | 162,000 100 | Operational | |||||
Northeastern Colorado Wind Energy Center - GE Energy | 22,500 15 | Dismantled | |||||
Northeastern Colorado Wind Energy Center - GE Energy | 24,000 15 | Operational | |||||
Northeastern Colorado Wind Energy Center - Siemens | 151,800 66 | Dismantled | |||||
Northeastern Colorado Wind Energy Center - Siemens | 151,800 66 | Operational | |||||
Northern Divide Wind Energy Center | 179,250 66 | Operational | |||||
Northern Divide Wind Energy Center | 13,720 8 | Operational | |||||
Northern Wind Site | 100,000 | Operational | |||||
Northlands Job Corps | 100 1 | Operational | |||||
Northwest Ohio | 105,000 42 | Operational | |||||
Northwest Wind Wind Farm | 1,400 2 | Operational | |||||
Northwestern School Corporation | 900 1 | Operational | |||||
Notrees 1A (Vestas) | 90,750 55 | Operational | |||||
Notrees 1B (GE Energy) | 60,000 40 | Operational | |||||
Notrees 1C (Vestas) | 1,800 1 | Operational | |||||
Number Three | 105,800 27 | Operational | |||||
Oak Creek - Phase 2A | 1,600 2 | Operational | |||||
Oak Creek 2 | 23,100 33 | Operational | |||||
Oak Creek Energy Systems | 800 1 | Operational | |||||
Oak Creek Energy Systems | 1,350 1 | Operational | |||||
Oak Creek Phase I (ON-Energy) | 4,200 7 | Operational | |||||
Oak Glen | 43,200 24 | Operational | |||||
Oak Tree | 20,350 11 | Operational | |||||
Oakfield | 147,600 48 | Operational | |||||
Oasis Power Partners | 60,000 60 | Dismantled | |||||
Oasis Repowering | 54,000 15 | Operational | |||||
Oasis Repowering | 18,000 6 | Operational | |||||
Ocean Wind | 1,100,000 | Approved | |||||
Ocean Wind 2 | 1,148,000 | Planned | |||||
Ocotillo Wind | 41,400 18 | Operational | |||||
Ocotillo Wind | 222,780 94 | Operational | |||||
Ocotillo Wind Farm | 58,800 28 | Operational | |||||
OCS-A 0545 | 650,000 | Planned | |||||
OCS-A 0546 | 650,000 | Planned | |||||
Odell | 200,000 100 | Operational | |||||
Odin (US) | 21,000 10 | Operational | |||||
Ohio Northern University | 1,600 4 | Operational | |||||
Oklahoma Wind Energy Center A | 51,000 34 | Dismantled | |||||
Oklahoma Wind Energy Center B | 51,000 34 | Dismantled | |||||
Oklahoma Wind Energy Center RP | 102,000 | Operational | |||||
Old Settler | 151,200 63 | Operational | |||||
Oliver I | 50,600 22 | Dismantled | |||||
Oliver I | 51,000 | Operational | |||||
Oliver II | 48,000 32 | Dismantled | |||||
Oliver II | 51,200 32 | Operational | |||||
Oliver III | 8,950 5 | Operational | |||||
Oliver III | 86,100 41 | Operational | |||||
Olsen Wind Farm | 1,500 2 | Operational | |||||
Olympic Wind US | 2,000,000 | Planned | |||||
Omaha | 660 1 | Operational | |||||
Orangeville | 84,240 52 | Operational | |||||
Orangeville | 9,720 6 | Operational | |||||
Orchard Wind | 40,000 16 | Operational | |||||
Oregon Trail Wind | 13,500 9 | Operational | |||||
Orient I | 102,000 51 | Operational | |||||
Orient II | 258,000 129 | Operational | |||||
Orient II | 140,800 64 | Operational | |||||
Origin | 150,000 75 | Operational | |||||
Osage | 150,360 84 | Operational | |||||
Osage Utilities | 1,500 1 | Operational | |||||
Osborn Wind Energy | 147,000 70 | Operational | |||||
Osborn Wind Energy | 8,950 5 | Operational | |||||
Oso Grande | 216,000 48 | Operational | |||||
Oso Grande | 31,395 13 | Operational | |||||
Other World Computing | 500 1 | Operational | |||||
Otis Wind Energy Project | 1,500 1 | Operational | |||||
Ottawa Whirlpool | 1,500 1 | Operational | |||||
Otter Creek | 13,800 4 | Operational | |||||
Otter Creek | 144,400 38 | Operational | |||||
OU Spirit | 101,200 44 | Operational | |||||
Outlaw | 36,000 18 | Operational | |||||
Outlaw | 48,400 22 | Operational | |||||
Outlaw | 214,200 51 | Operational | |||||
O’Brien | 250,260 104 | Operational | |||||
Pacific Crest-Caithness | 46,860 71 | Operational | |||||
Pacific West I | 2,100 3 | Operational | |||||
Pacific Wind | 143,500 70 | Operational | |||||
Painted Hills | 39,000 13 | Operational | |||||
Painted Hills | 19,000 | Dismantled | |||||
Pakini Nui | 21,000 14 | Operational | |||||
Palmas Altas | 144,900 46 | Operational | |||||
Palmer’s Creek | 37,500 15 | Operational | |||||
Palmer’s Creek | 4,600 2 | Operational | |||||
Palo Alto I (US) | 250,000 125 | Operational | |||||
Palo Alto II (US) | 90,000 45 | Operational | |||||
Palo Duro | 249,900 147 | Operational | |||||
Palouse | 104,400 58 | Operational | |||||
Panhandle I | 218,300 118 | Operational | |||||
Panhandle II | 181,700 79 | Operational | |||||
Panorama | 145,200 66 | Operational | |||||
Pantex | 11,500 5 | Operational | |||||
Panther Creek I | 142,500 99 | Dismantled | |||||
Panther Creek II | 115,500 77 | Dismantled | |||||
Panther Creek III | 199,500 133 | Dismantled | |||||
Panther Creek III | 105,600 66 | Operational | |||||
Panther Creek III | 107,200 67 | Operational | |||||
Panther Creek IV | 258,000 | Operational | |||||
Papalote Creek I | 179,850 109 | Operational | |||||
Papalote Creek II | 200,100 87 | Operational | |||||
Park City Wind | 1,500,000 | Planned | |||||
Passadumkeag | 42,900 13 | Operational | |||||
Patriot Wind | 17,250 5 | Operational | |||||
Patriot Wind | 208,800 58 | Operational | |||||
Patterson Pass | 13,000 | Dismantled | |||||
Patton | 6,000 3 | Operational | |||||
Patton | 24,000 12 | Operational | |||||
Patu | 9,000 6 | Operational | |||||
Payne’s Ferry Wind Park | 21,000 14 | Operational | |||||
Peak View | 60,860 34 | Operational | |||||
Pebble Springs | 98,700 47 | Operational | |||||
Peetz Table | 199,500 133 | Dismantled | |||||
Peetz Table | 29,700 33 | Operational | |||||
Peetz Table | 212,800 133 | Operational | |||||
Pegasus | 15,120 6 | Operational | |||||
Pegasus | 9,200 4 | Operational | |||||
Pegasus | 24,480 9 | Operational | |||||
Pegasus II | 102,500 41 | Operational | |||||
Pembina Border Station | 1,000 1 | Operational | |||||
Penescal | 201,600 84 | Operational | |||||
Penescal II | 201,600 84 | Operational | |||||
Perennial Wind | 6,900 3 | Operational | |||||
Perrin Ranch | 99,200 62 | Operational | |||||
Persimmon Creek I | 16,100 7 | Operational | |||||
Persimmon Creek I | 182,500 73 | Operational | |||||
Petersburg (ND) | 900 1 | Operational | |||||
Petersburg (NE) | 40,500 27 | Operational | |||||
Pettisville Schools | 750 1 | Operational | |||||
Peyton Creek | 151,200 48 | Operational | |||||
Pheasant Run I | 74,800 44 | Operational | |||||
Philips Lightolier | 2,000 1 | Operational | |||||
Phoenix Press | 100 1 | Operational | |||||
Pick-a-Part Columbia | 100 1 | Operational | |||||
Pigeon Creek | 900 1 | Operational | |||||
Pilgrim Stage Station | 10,500 7 | Operational | |||||
Pillar Mountain II | 4,500 3 | Operational | |||||
Pilot Hill | 175,100 103 | Operational | |||||
Pilot Point | 200 2 | Operational | |||||
Pine Ridge Job Corp | 100 1 | Operational | |||||
Pine River | 13,800 6 | Operational | |||||
Pine River | 147,500 59 | Operational | |||||
Pine Tree | 120,000 80 | Operational | |||||
Pine Tree Extension | 15,000 10 | Operational | |||||
Pinnacle | 36,000 15 | Dismantled | |||||
Pinnacle | 55,000 | Operational | |||||
Pinnacle | 19,200 8 | Dismantled | |||||
Pinnebog | 51,000 30 | Operational | |||||
Pioneer | 85,100 46 | Operational | |||||
Pioneer Grove | 3,000 1 | Operational | |||||
Pioneer Grove | 3,000 1 | Operational | |||||
Pioneer Prairie I | 191,400 116 | Operational | |||||
Pioneer Prairie I | 6,600 4 | Operational | |||||
Pioneer Prairie II | 31,350 19 | Operational | |||||
Pioneer Prairie II | 70,950 43 | Operational | |||||
Pioneer Trail | 150,400 94 | Operational | |||||
Pipestone School District | 750 1 | Operational | |||||
Pisgah Mountain Wind | 9,100 5 | Operational | |||||
Pleasant Hill | 22,000 11 | Operational | |||||
Pleasant Valley | 200,000 100 | Operational | |||||
Plum Creek | 229,600 82 | Operational | |||||
Plymouth wind farm | 16,100 7 | Operational | |||||
Plymouth wind farm | 186,120 66 | Operational | |||||
Pocahontas Prairie Wind | 80,000 40 | Dismantled | |||||
Pocahontas Prairie Wind | 48,000 24 | Operational | |||||
Pocahontas Prairie Wind | 35,200 16 | Operational | |||||
Point | 57,600 16 | Operational | |||||
Polaris | 152,500 61 | Operational | |||||
Polaris | 16,100 7 | Operational | |||||
Polk County Renewables | 2,500 1 | Operational | |||||
Pomeroy I | 123,000 82 | Dismantled | |||||
Pomeroy II | 1,500 1 | Dismantled | |||||
Pomeroy II | 73,500 49 | Dismantled | |||||
Pomeroy III | 58,500 39 | Dismantled | |||||
Pomeroy IV | 19,500 13 | Operational | |||||
Pomeroy Repowering | 265,000 | Operational | |||||
Ponderosa | 82,320 48 | Operational | |||||
Ponderosa | 83,160 33 | Operational | |||||
Ponderosa | 9,200 4 | Operational | |||||
Ponderosa | 9,200 4 | Operational | |||||
Ponderosa | 19,690 11 | Operational | |||||
Ponnequin I & II | 16,500 22 | Dismantled | |||||
Ponnequin III | 9,900 15 | Operational | |||||
Ponnequin III | 4,500 6 | Dismantled | |||||
Ponnequin III | 600 1 | Dismantled | |||||
Port of Milwaukee | 100 1 | Operational | |||||
Porta High School | 600 1 | Operational | |||||
Portsmouth | 1,500 1 | Operational | |||||
Portsmouth Abbey School Wind Turbine | 660 1 | Operational | |||||
Post Rock | 201,000 134 | Operational | |||||
Power County | 27,500 11 | Operational | |||||
Power County | 17,500 7 | Operational | |||||
Prairie | 164,000 82 | Operational | |||||
Prairie | 4,000 2 | Operational | |||||
Prairie Breeze I | 200,600 118 | Operational | |||||
Prairie Breeze II | 73,500 41 | Operational | |||||
Prairie Breeze III | 35,800 20 | Operational | |||||
Prairie Hill | 300,000 100 | Operational | |||||
Prairie Queen | 28,875 11 | Operational | |||||
Prairie Queen | 170,400 48 | Operational | |||||
Prairie Rose l Wind | 199,920 119 | Operational | |||||
Prairie Star | 1,650 1 | Operational | |||||
Prairie Star | 99,000 60 | Operational | |||||
Prairie Switch Wind | 163,000 | Operational | |||||
Prairie Winds | 2,600 2 | Dismantled | |||||
Prairie Winds Minot Wind 2 | 4,500 3 | Operational | |||||
Prairie Winds ND I | 115,500 77 | Operational | |||||
Pratt Wind Energy Center | 225,400 98 | Operational | |||||
Pratt Wind Energy Center | 18,400 8 | Operational | |||||
Presque Isle | 600 1 | Operational | |||||
Prevailing Wind | 216,600 57 | Operational | |||||
Priddy Wind Project | 302,400 63 | Operational | |||||
Princeton Municipal Light and Water Plant | 3,000 2 | Operational | |||||
Prospector | 10,000 5 | Operational | |||||
Providence Heights | 72,000 36 | Operational | |||||
Pryor Mountain | 108,000 54 | Operational | |||||
Pryor Mountain | 116,600 53 | Operational | |||||
Pryor Mountain | 9,200 4 | Operational | |||||
Pueblo Towers | 1,800 1 | Operational | |||||
PYCO Soaring Wind Farm | 10,000 10 | Operational | |||||
Quilt Block | 98,000 49 | Operational | |||||
Quinhagak | 300 3 | Operational | |||||
Radford’s Run | 305,800 139 | Operational | |||||
Rail Splitter | 100,500 67 | Operational | |||||
Ralls Wind Farm | 10,000 5 | Operational | |||||
Ranchero | 300,000 120 | Operational | |||||
Ranchland | 263,000 | Operational | |||||
Randolph Eastern School | 1,000 1 | Operational | |||||
Rattlesnake | 211,220 118 | Operational | |||||
Rattlesnake Creek | 318,150 101 | Operational | |||||
Rattlesnake Flat | 23,000 10 | Operational | |||||
Rattlesnake Flat | 126,900 47 | Operational | |||||
Rattlesnake Road | 102,900 49 | Operational | |||||
Rattlesnake Wind | 160,000 64 | Operational | |||||
Reading Wind project | 166,320 48 | Operational | |||||
Reading Wind project | 33,810 14 | Operational | |||||
Record Hill | 50,600 22 | Operational | |||||
Red Barn | 81,600 24 | Operational | |||||
Red Barn | 10,000 4 | Operational | |||||
Red Canyon | 84,000 56 | Dismantled | |||||
Red Canyon | 84,000 56 | Operational | |||||
Red Cloud | 350,000 125 | Operational | |||||
Red Dirt | 299,250 95 | Operational | |||||
Red Hills | 123,000 82 | Operational | |||||
Red Horse II | 30,000 15 | Operational | |||||
Red Lake Falls | 4,600 2 | Operational | |||||
Red Mesa | 102,400 64 | Operational | |||||
Red Pine | 100,000 50 | Operational | |||||
Red Pine | 100,000 50 | Operational | |||||
Redbed Plains | 34,000 17 | Operational | |||||
Redbed Plains | 65,100 31 | Operational | |||||
Reese | 2,000 1 | Operational | |||||
Reese Technology Center | 1,670 1 | Operational | |||||
Reese Technology Center | 2,300 1 | Operational | |||||
Reese Technology Center | 2,700 1 | Operational | |||||
REG Juhl Glenville Wind Project | 2,500 1 | Operational | |||||
Reloj del Sol | 138,600 40 | Operational | |||||
Reloj del Sol | 51,000 17 | Operational | |||||
Reloj del Sol | 18,000 6 | Operational | |||||
Revolution Wind | 704,000 | Under construction | |||||
Revolution Wind 2 | 884,000 | Planned | |||||
Richardton Abbey | 130 1 | Operational | |||||
Richland | 27,600 12 | Operational | |||||
Richland | 103,320 41 | Operational | |||||
Richland Community College | 100 1 | Operational | |||||
Ridgetop Energy | 250 1 | Operational | |||||
Ridgetop Energy | 1,300 12 | Operational | |||||
Ridgetop Energy | 14,000 28 | Operational | |||||
Ridgewind | 25,300 11 | Operational | |||||
Rim Rock | 189,000 126 | Operational | |||||
Ringer Hill | 39,900 14 | Operational | |||||
Rio Bravo | 237,600 66 | Operational | |||||
Riply | 275 1 | Operational | |||||
Rippey | 50,000 20 | Operational | |||||
Rising Tree North | 99,000 33 | Operational | |||||
Rising Tree South | 99,000 30 | Operational | |||||
Roaring Brook wind farm | 13,125 5 | Operational | |||||
Roaring Brook wind farm | 67,500 15 | Operational | |||||
Rock Aetna | 10,800 4 | Operational | |||||
Rock Aetna | 8,460 3 | Operational | |||||
Rock Aetna | 2,500 1 | Operational | |||||
Rock County Wind Fuel Project | 5,000 2 | Operational | |||||
Rock Creek | 300,000 150 | Operational | |||||
Rock Falls | 133,875 51 | Operational | |||||
Rock Falls | 20,700 9 | Operational | |||||
Rock of Ages | 100 1 | Operational | |||||
Rock River | 50,000 50 | Operational | |||||
Rockhaven | 46,200 21 | Operational | |||||
Rockhaven | 24,200 11 | Operational | |||||
Rockhaven | 33,600 8 | Operational | |||||
Rockhaven | 32,000 8 | Operational | |||||
Rockland | 79,200 44 | Operational | |||||
Rocksprings | 121,900 53 | Operational | |||||
Rocksprings | 27,520 16 | Operational | |||||
Rocky Forge | 75,000 | Under construction | |||||
Rocky Ridge | 148,800 93 | Operational | |||||
Roeder Farms | 1,500 1 | Operational | |||||
Rolling Hills | 443,900 193 | Dismantled | |||||
Rolling Hills | 116 | Operational | |||||
Rollins Wind | 60,000 40 | Operational | |||||
Roosevelt | 250,000 125 | Operational | |||||
Roscoe | 126,500 55 | Operational | |||||
Roscoe | 209,000 209 | Operational | |||||
Roscoe | 197,000 197 | Operational | |||||
Roscoe | 249,000 166 | Operational | |||||
Rosebud Sioux Wind Energy Project | 750 1 | Operational | |||||
Roseman Energy | 1,790 1 | Operational | |||||
Rosewater | 84,000 20 | Operational | |||||
Rosewater | 18,000 5 | Operational | |||||
Rosiere Wind Farm | 11,220 17 | Operational | |||||
Roth Rock | 50,000 20 | Operational | |||||
Roundhouse | 100,000 24 | Under construction | |||||
Roundhouse | 205,860 73 | Operational | |||||
Roundhouse | 20,700 9 | Operational | |||||
Route 66 | 150,000 75 | Operational | |||||
Roxwind wind farm | 15,200 4 | Operational | |||||
Rugby | 149,100 71 | Operational | |||||
Rush Creek I | 400,000 200 | Operational | |||||
Rush Creek II | 200,000 100 | Operational | |||||
Rush Springs | 249,000 120 | Operational | |||||
Ruthton Wind Farm | 15,840 24 | Operational | |||||
S.C. Johnson Waxdale | 3,000 2 | Operational | |||||
Sac County wind farm | 39,100 17 | Operational | |||||
Sac County wind farm | 33,840 12 | Operational | |||||
Sacred Heart Monestary | 1,260 2 | Operational | |||||
Sacred Heart Monestary | 200 2 | Operational | |||||
Saddleback Ridge | 8,550 3 | Operational | |||||
Saddleback Ridge | 25,650 9 | Operational | |||||
Sagamore | 470,800 214 | Operational | |||||
Sagamore | 52,000 26 | Operational | |||||
Sage Draw | 338,400 120 | Operational | |||||
Salinas Valley Power Station | 1,700 1 | Operational | |||||
Salmon Falls | 21,000 14 | Operational | |||||
Salt Fork | 174,000 87 | Operational | |||||
Salt Valley | 660 1 | Operational | |||||
Salt Valley | 660 1 | Operational | |||||
San Clemente Island | 675 3 | Operational | |||||
San Gorgonio Farms | 26,000 222 | Operational | |||||
San Gorgonio Farms | 2,000 4 | Operational | |||||
San Gorgonio Farms repower | 5,000 10 | Operational | |||||
San Gorgonio Farms repower | 8,000 16 | Operational | |||||
San Gorgonio Farms repower | 1,000 2 | Operational | |||||
San Jacinto (US) | 5,000 50 | Operational | |||||
San Juan Mesa | 120,000 120 | Dismantled | |||||
San Juan Mesa | 90,000 | Operational | |||||
San Roman | 93,000 31 | Operational | |||||
Sand Bluff | 90,000 45 | Operational | |||||
Sand Point | 1,000 2 | Operational | |||||
Sandusky Waste Water Facility | 600 1 | Operational | |||||
Sandusky Water Filtration Facility | 400 1 | Operational | |||||
Sandy Ridge | 50,000 25 | Operational | |||||
Sandy Ridge 2 | 87,600 | Operational | |||||
Sandywoods | 275 1 | Operational | |||||
Santa Clara (US) | 18,000 | Dismantled | |||||
Santa Rita (TX) | 300,000 120 | Operational | |||||
Santa Rita East | 302,400 120 | Operational | |||||
Sapphire Sky | 260,000 | Operational | |||||
Saratoga | 66,000 33 | Operational | |||||
Savoonga | 200 2 | Operational | |||||
Sawtooth | 22,400 14 | Operational | |||||
Scheid Vineyards | 1,850 1 | Operational | |||||
Scioto Ridge | 218,295 63 | Operational | |||||
Scioto Ridge | 23,625 9 | Operational | |||||
Scituate Wind | 1,500 1 | Operational | |||||
Seiling | 198,900 117 | Operational | |||||
Seiling 2 | 100,300 59 | Operational | |||||
Senate | 150,000 75 | Operational | |||||
Sendero | 78,000 39 | Operational | |||||
Seneca Nation | 1,500 1 | Operational | |||||
Settlers Trail | 150,400 94 | Operational | |||||
Seven Cowboy | 300,000 107 | Under construction | |||||
Seven Mile Hill I | 99,000 66 | Dismantled | |||||
Seven Mile Hill II | 19,500 13 | Dismantled | |||||
Seven Mile Hill Repowering | 146,000 | Operational | |||||
Seymour Hills | 30,240 12 | Operational | |||||
Shady Oaks | 102,000 68 | Operational | |||||
Shady Oaks | 7,500 3 | Operational | |||||
Shady Oaks II | 108,000 22 | Operational | |||||
Shakopee Mdewakanton Sioux | 1,500 1 | Operational | |||||
Shaktoolik | 200 2 | Operational | |||||
Shalom Housing Wind | 100 1 | Operational | |||||
Shamrock Wind | 224,000 | Under construction | |||||
Shane Cowell Wind Farm | 2,100 1 | Operational | |||||
Shannon | 202,300 119 | Operational | |||||
Shaokatan Power Partners Wind | 1,700 2 | Operational | |||||
Shaokatan Power Partners Wind | 11,880 18 | Operational | |||||
Sheffield | 40,000 16 | Operational | |||||
Shenandoah High School | 900 1 | Operational | |||||
Shepherds Flat Wind Farm | 207,500 83 | Operational | |||||
Shepherds Flat Wind Farm | 195,000 78 | Operational | |||||
Shepherds Flat Wind Farm | 125,000 50 | Operational | |||||
Shepherds Flat Wind Farm | 60,000 24 | Operational | |||||
Shepherds Flat Wind Farm | 247,500 99 | Operational | |||||
Shepherds Flat Wind Farm | 10,000 4 | Operational | |||||
Shepherds Flat Wind Farm | 1,000 4 | Dismantled | |||||
Sherbino I | 150,000 50 | Operational | |||||
Sherbino II | 150,000 60 | Dismantled | |||||
Sherbino II | 120,000 60 | Operational | |||||
Sherrard High School | 660 1 | Operational | |||||
Shiloh I | 115,500 77 | Operational | |||||
Shiloh I | 34,500 23 | Operational | |||||
Shiloh II | 66,000 33 | Operational | |||||
Shiloh II | 84,000 42 | Operational | |||||
Shiloh III | 8,200 4 | Operational | |||||
Shiloh III | 94,300 46 | Operational | |||||
Shiloh IV | 92,250 45 | Operational | |||||
Shiloh IV | 10,250 5 | Operational | |||||
Shirley | 20,000 8 | Operational | |||||
Sholes | 10,320 6 | Operational | |||||
Sholes | 147,200 64 | Operational | |||||
Sholes | 2,500 1 | Operational | |||||
Shooting Star | 104,000 65 | Operational | |||||
Sibley Hills | 660 1 | Operational | |||||
Sibley Wind Farm | 1,200 2 | Operational | |||||
Sigel Wind Park | 64,000 40 | Operational | |||||
Silver Creek | 275 1 | Operational | |||||
Silver Maple | 20,000 5 | Operational | |||||
Silver Sage | 42,000 20 | Operational | |||||
Silver Star | 60,000 24 | Dismantled | |||||
Silver Star | 48,000 | Operational | |||||
Skeleton Creek | 225,600 80 | Operational | |||||
Skeleton Creek | 30,800 11 | Operational | |||||
Skipjack | 120,000 10 | Planned | |||||
Skipjack 2 | 760,000 | Planned | |||||
Skookumchuck | 136,800 38 | Operational | |||||
Sky River | 72,450 322 | Dismantled | |||||
Sky River Repower | 56,400 20 | Operational | |||||
Sky River Repower | 6,900 3 | Operational | |||||
Sky Volt | 1,600 1 | Operational | |||||
Slate Creek | 150,000 75 | Operational | |||||
Sleeping Bear | 94,500 45 | Operational | |||||
Smoky Hills 1 | 148,500 99 | Dismantled | |||||
Smoky Hills 1 | 88,200 49 | Operational | |||||
Smoky Hills 1 | 14,000 7 | Operational | |||||
Smoky Hills 2 | 108,000 56 | Dismantled | |||||
Smoky Hills 2 | 80,000 50 | Operational | |||||
SMUD | 660 1 | Operational | |||||
Snyder Wind Project | 63,000 21 | Dismantled | |||||
Solano | 63,000 21 | Operational | |||||
Solano County | 60,000 600 | Operational | |||||
Solano I | 10,560 16 | Operational | |||||
Solano II | 4,620 7 | Operational | |||||
Solano IIA | 24,000 8 | Operational | |||||
Solano III | 55,800 31 | Operational | |||||
Solano III | 72,000 24 | Operational | |||||
Solano IV | 85,500 19 | Operational | |||||
Soldier Creek Wind Energy Center | 135,700 59 | Operational | |||||
Soldier Creek Wind Energy Center | 157,760 58 | Operational | |||||
Soldier Creek Wind Energy Center | 7,500 3 | Operational | |||||
Solomon Forks | 275,625 105 | Operational | |||||
Somerset Wind Power Project | 9,000 6 | Operational | |||||
South Dakota Wind Partners | 10,500 7 | Operational | |||||
South Fork | 132,000 | Operational | |||||
South Fork Wind Farm | 13,800 6 | Operational | |||||
South Peak | 6,900 3 | Operational | |||||
South Peak | 70,500 25 | Operational | |||||
South Peak | 2,500 1 | Operational | |||||
South Plains | 200,000 100 | Operational | |||||
South Plains II | 300,300 91 | Operational | |||||
South Trent Mesa | 101,200 44 | Operational | |||||
SouthCoast Wind 1 | 1,209,000 | Planned | |||||
SouthCoast Wind 2 | 1,200,000 | Planned | |||||
Southern Hills | 8,800 4 | Operational | |||||
Southern Hills | 155,100 25 | Operational | |||||
Southern Hills | 19,800 9 | Operational | |||||
Southern Hills | 4,400 2 | Operational | |||||
Southern Hills | 4,000 2 | Operational | |||||
Southern Hills | 100,800 21 | Operational | |||||
Southern Minnesota Hills | 3,300 2 | Operational | |||||
Southern Minnesota Municipal Power Agency | 3,300 2 | Operational | |||||
Southwest Mesa Wind Farm | 80,250 107 | Dismantled | |||||
Spanish Fork | 18,900 9 | Operational | |||||
Spearville | 100,500 67 | Operational | |||||
Spearville | 100,800 63 | Operational | |||||
Spearville | 48,000 30 | Operational | |||||
Spinning Spur I | 80,500 35 | Operational | |||||
Spinning Spur I | 80,500 35 | Operational | |||||
Spinning Spur II | 160,950 87 | Operational | |||||
Spinning Spur III | 194,000 97 | Operational | |||||
Spion Kop (US) | 40,000 25 | Operational | |||||
Spirit Lake | 250 1 | Operational | |||||
Spirit Lake II | 750 1 | Operational | |||||
Spring Canyon I | 60,000 40 | Operational | |||||
Spring Canyon II | 34,010 19 | Operational | |||||
Spring Canyon III | 28,640 16 | Operational | |||||
Spring Valley Wind | 151,800 66 | Operational | |||||
Springview II | 3,000 2 | Operational | |||||
Spruce Mountain | 20,000 10 | Operational | |||||
St. Cloud VA Medical Center | 600 1 | Operational | |||||
St. Mary’s | 1,400 2 | Operational | |||||
St. Mary’s Wind Turbine | 900 1 | Operational | |||||
St. Olaf Wind Project | 1,650 1 | Operational | |||||
St. Paul Island | 225 1 | Operational | |||||
St. Paul Island | 225 1 | Operational | |||||
St. Paul Island | 225 1 | Operational | |||||
Stafford | 850 1 | Operational | |||||
Stanton Energy Center | 120,000 80 | Operational | |||||
Star Point | 98,700 47 | Operational | |||||
Stateline (OR) | 83,160 126 | Operational | |||||
Stateline (OR) expansion | 39,600 60 | Operational | |||||
Stateline (WA) | 176,880 268 | Operational | |||||
Steel Winds I | 20,000 8 | Operational | |||||
Steel Winds II | 15,000 6 | Operational | |||||
Steele Flats | 74,800 44 | Operational | |||||
Stella (TX) | 201,000 67 | Operational | |||||
Stephens Ranch I | 211,220 118 | Operational | |||||
Stephens Ranch II | 164,680 92 | Operational | |||||
Sterling 1 | 16,100 7 | Operational | |||||
Sterling 1 | 13,800 6 | Operational | |||||
Stetson Wind 1 | 57,000 38 | Operational | |||||
Stetson Wind 2 | 25,500 17 | Operational | |||||
Stillwater Wind | 11,500 5 | Operational | |||||
Stillwater Wind | 68,250 26 | Operational | |||||
Stoneray I | 34,125 13 | Operational | |||||
Stoneray II | 55,125 21 | Operational | |||||
Stoneray II | 11,500 5 | Operational | |||||
Stoney Corners II | 2,050 1 | Operational | |||||
Stoney Corners II | 18,450 9 | Operational | |||||
Stoney Corners III - Northern Power Systems | 2,200 1 | Operational | |||||
Stoney Corners III - REpower | 18,450 9 | Operational | |||||
Stoney Corners Wind Farm | 5,000 2 | Operational | |||||
Stoney Corners- REpower | 14,350 7 | Operational | |||||
Stony Creek | 52,500 35 | Operational | |||||
Storm Lake I | 108,750 145 | Operational | |||||
Storm Lake II | 79,500 106 | Operational | |||||
Story City | 900 1 | Operational | |||||
Story City Wind | 1,500 1 | Operational | |||||
Story County Hospital | 225 1 | Operational | |||||
Story County I | 150,000 100 | Dismantled | |||||
Story County I | 75,000 50 | Operational | |||||
Story County I | 75,000 50 | Operational | |||||
Story County II | 150,000 100 | Operational | |||||
Strauss | 98,800 26 | Under construction | |||||
Streator Cayuga Ridge Wind Farm | 300,000 150 | Operational | |||||
Stuart Municipal Utilities | 660 1 | Operational | |||||
Sugar Creek Wind | 34,000 17 | Operational | |||||
Sugar Creek Wind | 168,000 40 | Operational | |||||
Summit Wind Repowering | 62,100 23 | Operational | |||||
Sundance | 2,300 1 | Operational | |||||
Sundance | 121,260 43 | Operational | |||||
Sundance | 26,000 | Operational | |||||
Sunflower | 201,000 | Under construction | |||||
Sunflower Wind Project | 104,000 52 | Operational | |||||
Sunny Alfred | 100 1 | Operational | |||||
Sunray I | 10,500 7 | Operational | |||||
Sunray II | 39,000 26 | Operational | |||||
Sunrise Wind (US) | 924,000 | Under construction | |||||
Sunrise Wind 2 | 100,000 | Planned | |||||
Sustainable Technologies Museum | 2,500 1 | Operational | |||||
Suzlon VII | 2,100 1 | Operational | |||||
Suzlon VII | 2,100 1 | Operational | |||||
Swanson - AG Land 1-4 | 6,400 4 | Operational | |||||
Swanson - AG Land 5-6 | 3,200 2 | Operational | |||||
Swauk Valley Ranch Wind Project | 4,250 5 | Operational | |||||
Sweetland | 200,000 | Under construction | |||||
Sweetwater 1 | 37,500 25 | Dismantled | |||||
Sweetwater 1 & 2 repowering | 136,000 | Operational | |||||
Sweetwater 2 | 91,500 61 | Dismantled | |||||
Sweetwater 3 | 135,000 90 | Dismantled | |||||
Sweetwater 3 | 144,000 90 | Operational | |||||
Sweetwater 4a | 135,000 135 | Operational | |||||
Sweetwater 4b | 105,800 46 | Operational | |||||
Sweetwater 5 | 80,500 35 | Operational | |||||
T-Omega Wind Prototype | 300 1 | Operational | |||||
Taconite Ridge | 25,000 10 | Operational | |||||
Tahoka Wind | 300,000 120 | Operational | |||||
Talbot County DPW | 300 3 | Operational | |||||
Taloga | 129,600 54 | Operational | |||||
Tatanka Ridge | 140,000 50 | Operational | |||||
Tatanka Ridge | 13,800 6 | Operational | |||||
Tatanka Wind Project (North Dakota) | 91,500 61 | Operational | |||||
Tatanka Wind Project (South Dakota) | 88,500 59 | Operational | |||||
Taylor Farms | 1,850 1 | Operational | |||||
TB Flats I & II | 56,000 28 | Operational | |||||
TB Flats I & II | 202,100 47 | Operational | |||||
TB Flats I & II | 245,100 57 | Operational | |||||
Tecolote Wind | 271,600 97 | Operational | |||||
Tehachapi 1.6 Prototype | 1,600 1 | Operational | |||||
Tehachapi Hills | 46,000 | Operational | |||||
Tehachapi Windplant II wind farm | 16,000 | Under construction | |||||
Teichert Aggregates | 1,500 1 | Operational | |||||
Templeton Wind Turbine | 1,800 1 | Operational | |||||
Tenaska Clear Creek Energy Center | 22,000 11 | Operational | |||||
Tenaska Clear Creek Energy Center | 220,000 100 | Operational | |||||
Testa Produce | 750 1 | Operational | |||||
Tholen & Petersen | 13,200 8 | Operational | |||||
Thousand Springs | 12,000 8 | Operational | |||||
Threemile Canyon | 9,900 6 | Operational | |||||
Thunder Ranch | 25,300 11 | Operational | |||||
Thunder Ranch | 272,500 109 | Operational | |||||
Thunder Spirit | 107,500 43 | Operational | |||||
Thunder Spirit II | 48,000 16 | Operational | |||||
Thunderhead | 23,000 10 | Operational | |||||
Thunderhead | 276,360 98 | Operational | |||||
Timber Road I | 100,800 48 | Operational | |||||
Timber Road II | 45,375 25 | Operational | |||||
Timber Road II | 54,450 30 | Operational | |||||
Timber Road IV | 100,800 24 | Operational | |||||
Timber Road IV | 25,200 7 | Operational | |||||
Tin City Long Range Radar Station | 225 1 | Operational | |||||
Tippecanoe Valley School Corporation | 900 1 | Operational | |||||
Titan I | 25,000 10 | Operational | |||||
TJ Automation | 100 1 | Operational | |||||
Tjaden Farms | 450 1 | Operational | |||||
Toksook Bay | 300 3 | Operational | |||||
Toksook Bay Expansion | 100 1 | Operational | |||||
Tooele Army Depot | 1,500 1 | Operational | |||||
Tooele Army Depot | 1,790 1 | Operational | |||||
Top Crop | 43,500 29 | Operational | |||||
Top Crop | 58,500 39 | Operational | |||||
Top Crop II | 187,500 125 | Operational | |||||
Top Crop II | 10,500 7 | Operational | |||||
Top of Iowa | 80,100 89 | Operational | |||||
Top of Iowa II | 80,000 40 | Operational | |||||
Top of Iowa III | 29,700 18 | Operational | |||||
Top of the World - GE Energy | 99,000 66 | Operational | |||||
Top of the World - Siemens | 101,200 44 | Operational | |||||
Torrecillas | 300,000 120 | Operational | |||||
Town of Portsmouth | 1,500 1 | Operational | |||||
Town of Richland | 100 1 | Operational | |||||
Traer Wind | 1,500 1 | Operational | |||||
Traverse City Light & Power | 600 1 | Operational | |||||
Traverse Wind Project | 30,000 12 | Operational | |||||
Traverse Wind Project | 877,020 311 | Operational | |||||
Trent Mesa Wind Farm | 150,000 100 | Dismantled | |||||
Trent Mesa Wind Farm Repowering | 156,000 | Operational | |||||
Trent Mesa Wind Farm Repowering | 27,200 16 | Operational | |||||
Tres Vaqueros | 18,150 55 | Operational | |||||
Tres Vaqueros | 750 1 | Operational | |||||
Tres Vaqueros I | 28,050 85 | Operational | |||||
Tres Vaqueros II | 750 1 | Operational | |||||
Trimont Area Wind Farm | 100,500 67 | Dismantled | |||||
Trimont Area Wind Farm | 107,200 67 | Operational | |||||
Trinity Hills | 225,000 900 | Dismantled | |||||
Trinity Hills | 198,000 90 | Operational | |||||
Triple H | 250,240 92 | Operational | |||||
Trondhjem | 2,300 1 | Operational | |||||
Tuana Gulch | 10,500 7 | Operational | |||||
Tuana Springs | 16,800 8 | Operational | |||||
Tucannon River Wind Project | 266,800 116 | Operational | |||||
Tule I | 131,100 57 | Operational | |||||
Tule II | 71,000 | Operational | |||||
Turkey Hill | 3,200 2 | Operational | |||||
Turkey Track | 169,500 113 | Operational | |||||
Turtle Creek | 144,000 40 | Operational | |||||
Turtle Creek | 55,200 16 | Operational | |||||
Turtle Mountain | 100 1 | Operational | |||||
Turtle Mountain Community College | 660 1 | Operational | |||||
Tuscola I | 120,000 75 | Operational | |||||
Tuscola II | 100,300 59 | Operational | |||||
Twin Buttes | 75,000 50 | Operational | |||||
Twin Buttes II | 75,600 36 | Operational | |||||
Twin Groves I | 198,000 120 | Operational | |||||
Twin Groves II | 36,300 22 | Operational | |||||
Twin Groves II | 161,700 98 | Operational | |||||
Twin Ridges Wind | 75,850 37 | Dismantled | |||||
Twin Ridges Wind | 63,550 31 | Dismantled | |||||
Twin Ridges Wind | 139,400 68 | Under construction | |||||
Two Dot | 9,720 6 | Operational | |||||
Two Rivers | 280,000 | Under construction | |||||
Tyler Bluff | 125,580 52 | Operational | |||||
Uilk Wind Farm | 4,500 3 | Operational | |||||
UL Advanced Wind Turbine Test Facility | 3,570 1 | Operational | |||||
Unalakleet | 600 6 | Operational | |||||
Union City | 1,000 1 | Operational | |||||
University of Massachussetts Dartmouth | 600 1 | Operational | |||||
University of Minnesota - Morris | 1,650 1 | Operational | |||||
University of Minnesota - Morris | 1,650 1 | Operational | |||||
Universtiy of Delaware | 2,000 1 | Operational | |||||
Upland Prairie | 36,800 16 | Operational | |||||
Upland Prairie | 252,500 101 | Operational | |||||
Upper Scioto Valley School | 200 2 | Operational | |||||
Upstream | 202,500 81 | Operational | |||||
US Wind Maryland | 268,000 | Planned | |||||
US Wind Maryland | 268,000 32 | Planned | |||||
US Wind+ | 1,200,000 | Planned | |||||
Valentine | 1,850 1 | Operational | |||||
Valfilm Wind | 3,000 2 | Operational | |||||
Valley city - Oriska Hills | 900 1 | Operational | |||||
Valley View | 10,000 5 | Operational | |||||
Vansycle Ridge 1 | 25,080 38 | Operational | |||||
Vansycle Ridge 2 | 98,900 43 | Operational | |||||
Vantage Wind | 90,000 60 | Operational | |||||
Vasco | 78,200 34 | Operational | |||||
Velva Wind Farm | 11,880 18 | Operational | |||||
Venture Wind I | 1,200 12 | Operational | |||||
Victorville | 750 1 | Operational | |||||
Victory Garden | 660 1 | Operational | |||||
Victory Gardens - Phase IV | 21,150 94 | Dismantled | |||||
Victory Gardens - Phase IV | 1,320 2 | Operational | |||||
Victory Gardens I & IV | 1,000 2 | Operational | |||||
Victory Wind Farm | 99,000 66 | Dismantled | |||||
Victory Wind Farm | 104,000 | Operational | |||||
Vienna | 103,500 45 | Operational | |||||
Vienna II | 43,700 19 | Operational | |||||
Viking | 12,000 8 | Dismantled | |||||
Vineyard Mid-Atlantic | 870,000 | Planned | |||||
Vineyard Northeast | 2,500,000 | Planned | |||||
Vineyard Wind 1 | 806,000 62 | Under construction | |||||
Virginia Dominion | 880,000 | Approved | |||||
Virginia Dominion | 880,000 | Approved | |||||
Virginia Dominion | 880,000 | Approved | |||||
Virginia Offshore Wind Technology Advancement Project | 12,000 2 | Operational | |||||
Voyager I | 131,100 38 | Operational | |||||
Voyager II | 172,800 48 | Operational | |||||
Voyager II | 20,700 6 | Operational | |||||
Wake | 257,250 150 | Operational | |||||
Wall Lake Municipal Utilities | 660 1 | Operational | |||||
Walleye | 101,520 36 | Operational | |||||
Walleye | 9,200 4 | Operational | |||||
Walmart - Red Bluff | 1,500 1 | Operational | |||||
Walnut Ridge Wind Farm I | 212,000 106 | Operational | |||||
Walnut Wind Project | 153,000 102 | Dismantled | |||||
Walnut Wind Project | 165,240 102 | Operational | |||||
Wapsipinicon | 100,500 67 | Operational | |||||
Wausau High School | 100 1 | Operational | |||||
Waverly | 1,500 2 | Operational | |||||
Waverly (KS) | 189,000 90 | Operational | |||||
Waverly (KS) | 10,000 5 | Operational | |||||
Waverly (Waverly III) | 900 1 | Operational | |||||
Waymart Wind Farm | 64,500 43 | Operational | |||||
We Energy Wind Farm | 1,320 2 | Operational | |||||
Weatherford Wind Energy Center | 106,500 71 | Dismantled | |||||
Weatherford Wind Energy Center | 113,600 71 | Operational | |||||
Weatherford Wind Energy Center Expansion | 40,500 27 | Dismantled | |||||
Weatherford Wind Energy Center Expansion | 43,200 27 | Operational | |||||
Weaver | 72,600 22 | Operational | |||||
WED Coventry | 1,500 1 | Operational | |||||
WED Coventry | 4,500 3 | Operational | |||||
WED Coventry | 1,500 1 | Operational | |||||
WED Coventry | 1,500 1 | Operational | |||||
WED Coventry | 4,500 3 | Operational | |||||
WED Coventry | 1,500 1 | Operational | |||||
WED Green Hill | 3,000 1 | Operational | |||||
WED Plainfield I | 3,000 1 | Operational | |||||
WED Plainfield II | 3,000 1 | Operational | |||||
WED Plainfield III | 3,000 1 | Operational | |||||
WED Providence Wind 1 | 1,500 1 | Operational | |||||
WED Providence Wind 2A | 1,500 1 | Operational | |||||
WED Providence Wind 2B | 1,500 1 | Operational | |||||
WED Shun I | 3,000 1 | Operational | |||||
WED Shun II | 3,000 1 | Operational | |||||
WED Shun III | 3,000 1 | Operational | |||||
Wege Wind Farm | 10,000 8 | Dismantled | |||||
Wellsburg | 140,760 60 | Operational | |||||
Wessington Springs | 51,000 34 | Operational | |||||
West Central School Corporation | 900 1 | Operational | |||||
West Raymond | 202,400 92 | Operational | |||||
West Raymond | 32,000 16 | Operational | |||||
West Winds | 43,400 62 | Operational | |||||
Western Plains | 280,600 122 | Operational | |||||
Western Plains - Smokey Hills Energy | 2,720 1 | Operational | |||||
Western Trail Wind | 366,600 130 | Operational | |||||
Westfield (US) | 275 1 | Operational | |||||
Westridge | 17,100 18 | Operational | |||||
Westwind-PacifiCorp | 1,500 2 | Operational | |||||
Wethersfield Wind Power | 6,600 10 | Dismantled | |||||
Wheatfield | 96,600 46 | Operational | |||||
Wheatridge | 269,640 107 | Operational | |||||
Wheatridge | 29,900 13 | Operational | |||||
Whirlwind | 59,800 26 | Operational | |||||
Whispering Willow | 199,650 121 | Operational | |||||
Whispering Willow North | 171,360 68 | Operational | |||||
Whispering Willow North | 29,900 13 | Operational | |||||
White Cloud | 214,500 78 | Operational | |||||
White Cloud | 22,000 11 | Operational | |||||
White Creek | 204,700 89 | Operational | |||||
White Earth Tribe | 750 1 | Operational | |||||
White Hills | 25,300 11 | Operational | |||||
White Hills | 324,300 115 | Operational | |||||
White Mesa | 507,600 180 | Operational | |||||
White Oak | 150,000 100 | Operational | |||||
White Rock (US) | 100,000 14 | Operational | |||||
White Rock (US) | 200,000 34 | Operational | |||||
Whitetail | 91,200 57 | Operational | |||||
Whitewater Hill | 4,500 3 | Operational | |||||
Whitewater Hill | 61,500 41 | Operational | |||||
Whitney Hill | 65,280 24 | Operational | |||||
Wild Horse | 228,600 127 | Operational | |||||
Wild Horse II | 39,600 22 | Operational | |||||
Wildcat | 140,300 61 | Operational | |||||
Wildcat | 10,290 6 | Operational | |||||
Wildcat (Indiana) | 200,000 125 | Operational | |||||
Wildcat (New Mexico) | 27,300 13 | Operational | |||||
Wildcat Creek | 100,800 21 | Operational | |||||
Wildcat Creek | 8,400 4 | Operational | |||||
Wildcat Creek | 70,875 27 | Operational | |||||
Wildhorse Mountain | 100,050 29 | Operational | |||||
Wildorado | 161,000 70 | Dismantled | |||||
Wildorado | 161,000 | Operational | |||||
Williams Stone | 600 1 | Operational | |||||
Willmar Wind | 4,000 2 | Operational | |||||
Willow Creek (Oregon) | 72,000 48 | Operational | |||||
Willow Creek (South Dakota) | 106,400 38 | Operational | |||||
Willow Spring | 10,000 5 | Operational | |||||
Willow Springs | 250,000 100 | Operational | |||||
Wilmont Hills | 1,500 1 | Operational | |||||
Wilton Wind Energy I | 18,000 12 | Dismantled | |||||
Wilton Wind Energy I | 24,000 16 | Dismantled | |||||
Wilton Wind Energy I | 19,200 12 | Operational | |||||
Wilton Wind Energy I | 7,500 5 | Operational | |||||
Wilton Wind Energy I | 25,600 16 | Operational | |||||
Wilton Wind Energy II | 49,500 33 | Operational | |||||
Winchester | 850 1 | Operational | |||||
Wind GEM | 1,850 1 | Operational | |||||
Wind Power Partners 90-92 | 96,700 967 | Operational | |||||
Wind Power Partners 94 | 38,150 109 | Dismantled | |||||
Wind Turbine Co. test | 500 1 | Operational | |||||
Wind Vision | 900 1 | Operational | |||||
Wind Walkers | 1,600 1 | Operational | |||||
Wind Wall 1 | 46,500 13 | Operational | |||||
Windland (Boxcar II) | 14,300 111 | Dismantled | |||||
Windstar | 120,000 60 | Operational | |||||
Windthorst-2 | 64,400 28 | Operational | |||||
Windway Technologies | 250 1 | Operational | |||||
Windy Point I - REpower | 32,000 16 | Operational | |||||
Windy Point I - REpower | 8,000 4 | Operational | |||||
Windy Point I - Siemens | 96,600 42 | Operational | |||||
Windy Point II | 172,500 75 | Operational | |||||
Windy Point II | 29,900 13 | Operational | |||||
Windy Point III | 59,800 26 | Operational | |||||
Wing River Wind | 2,500 1 | Operational | |||||
Winnebago I | 20,000 10 | Operational | |||||
Winona County Wind | 1,500 2 | Operational | |||||
Wiota Wind | 1,600 1 | Operational | |||||
Wolf Ridge | 112,500 75 | Dismantled | |||||
Wolf Ridge | 120,000 75 | Operational | |||||
Wolf Wind Farm | 6,250 5 | Operational | |||||
Wolverine | 1,500 1 | Operational | |||||
Wolverine Creek | 64,500 43 | Operational | |||||
Woods Hole Research Center | 100 1 | Operational | |||||
Woodstock Hills | 10,200 17 | Dismantled | |||||
Woodstock Hills Repowering | 9,200 4 | Operational | |||||
Woodstock Municipal Wind | 750 1 | Operational | |||||
Woodward Mountain I & II | 159,720 242 | Operational | |||||
WPS Wind Farm | 9,240 14 | Operational | |||||
Wray School District | 900 1 | Operational | |||||
Wynford Local Schools | 200 2 | Operational | |||||
Wyoming Wind Energy Center | 144,000 80 | Operational | |||||
Yahoo Creek Wind | 21,000 14 | Operational | |||||
Young Wind | 500,000 117 | Operational | |||||
Young Wind Project | 169,200 60 | Operational | |||||
Zachary Ridge-LJ Wind Farm | 2,000 1 | Operational | |||||
Zachary Ridge-LJ Wind Farm | 2,000 1 | Operational | |||||
Zephyr (US) | 4,500 3 | Operational | |||||
Zephyr 2.0 | 4,500 3 | Operational | |||||
Zirbel Wind Farm | 1,200 2 | Dismantled | |||||
Zotos | 3,300 2 | Operational | |||||
ND: no data