[Back to previous page]
Generalities
|
|
Details
- City: Courcôme
- Commissioning:

- 4 turbines: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Hub height:

- Total nominal power: 9,600 kW
- Operational
- Onshore wind farm
- Developer: ABO-Wind
- Operator: ABO-Wind
- Source:

Localisation
- Latitude: 45° 59' 24.7"
- Longitude: 0° 11' 33.1"
- Geodetic system: WGS84
- Precise localization: no
Pictures

Author: Jacky Boireau - License: All right reserved
Picture reference: 14250 - Date: 2020

Author: Jacky Boireau - License: All right reserved
Picture reference: 14251 - Date: 2020

Author: Jacky Boireau - License: All right reserved
Picture reference: 14252 - Date: 2020

Author: Jacky Boireau - License: All right reserved
Picture reference: 14253 - Date: 2020

Author: Jacky Boireau - License: All right reserved
Picture reference: 14254 - Date: 2020

Author: Jacky Boireau - License: All right reserved
Picture reference: 14255 - Date: 2020

Author: Jacky Boireau - License: All right reserved
Picture reference: 14256 - Date: 2020

Author: Jacky Boireau - License: All right reserved
Picture reference: 14257 - Date: 2020
Update for this sheet: 0
Complete/correct this sheet: