[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Izenave, Vieu-d’Izenave, Cerdon, Labalme
- Commissioning:

- 4 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Total nominal power: 8,200 kW
- Operational
- Onshore wind farm
- Developer: RES
- Owner:

- Source:

Part #2:
- City: Izenave, Vieu-d’Izenave, Cerdon, Labalme
- Commissioning:

- 5 turbines: Senvion MM100 (power 2 000 kW, diameter 100 m)
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developer: RES
- Owner:

- Source:

- Source:

Localisation
Part #1:
Part #2:
Update for this sheet: 25 November 2024
Complete/correct this sheet: