Part #1:
- City: Bandirma
- Commissioning:
- 2 turbines: Nordex N90/2500 (power 2 500 kW, diameter 90 m)
- Hub height:
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
- Developers: Yapisan/Bilgin Enerji
- Operator: Yapisan
- Source:
- Source:
Part #2:
- City: Bandirma
- Commissioning:
- 5 turbines: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
- Total nominal power: 15,000 kW
- Operational
- Onshore wind farm
- Developer: Bilgin Enerji
- Operator: Borasco
- Source:
- Source:
Part #3:
- City: Bandirma
- Commissioning:
- 20 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:
- Total nominal power: 30,000 kW
- Operational
- Onshore wind farm
- Developers: Bares A.S./Bilgin Enerji
- Operator: Yapisan
- Source:
- Source:
Part #4:
- City: Bandirma
- Commissioning:
- 15 turbines: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
- Total nominal power: 45,000 kW
- Operational
- Onshore wind farm
- Operator: Borasco
- Source:
Part #5:
- City: Bandirma
- Commissioning:
- 10 turbines: Nordex N90/2500 (power 2 500 kW, diameter 90 m)
- Hub height:
- Total nominal power: 25,000 kW
- Operational
- Onshore wind farm
- Developer: AS Makinsan
- Operator: AS Makinsan
- Owner:
- Source:
Part #6:
- City: Bandirma
- Commissioning:
- 8 turbines: Vestas V112/3300 (power 3 300 kW, diameter 112 m)
- Total nominal power: 26,400 kW
- Operational
- Onshore wind farm
- Operator: Borasco
- Source:
Part #7:
- City: Bandirma
- Commissioning:
- 1 turbine: Vestas V112/3300 (power 3 300 kW, diameter 112 m)
- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
- Operator: Borasco
- Source:
Part #8:
- City: Bandirma
- Commissioning:
- 7 turbines: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Total nominal power: 16,800 kW
- Operational
- Onshore wind farm
- Developer: AS Makinsan
- Operator: AS Makinsan
- Owner:
- Source:
Part #9:
- City: Bandirma
- Commissioning:
- 7 turbines: Nordex N90/2500 (power 2 500 kW, diameter 90 m)
- Total nominal power: 17,500 kW
- Operational
- Onshore wind farm
- Developer: Yapisan
- Operator: Yapisan
- Source:
Localisation
Part #1:
- Latitude: 40° 21' 0"
- Longitude: 27° 58' 11.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 40° 21' 56.8"
- Longitude: 28° 8' 52.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 40° 22' 5.8"
- Longitude: 28° 4' 8.3"
- Altitude: 200 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 40° 21' 56.8"
- Longitude: 28° 8' 52.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Latitude: 40° 16' 12.6"
- Longitude: 27° 51' 19.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #6:
- Latitude: 40° 22' 0"
- Longitude: 28° 8' 43"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #7:
- Latitude: 40° 22' 0"
- Longitude: 28° 8' 43"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #8:
- Latitude: 40° 22' 5.9"
- Longitude: 28° 5' 42.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #9:
- Latitude: 40° 16' 13.8"
- Longitude: 27° 51' 18.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 7 November 2024