[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Aubaine, Bessey-en-Chaume, Montceau-et-Écharnant, Cussy-la-Colonne, Ivry-en-Montagne, Santosse
- Commissioning:
- 6 turbines: Vestas V100/2000 (power 2 000 kW, diameter 100 m)
- Hub height:
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developer: RES
- Operator: RES
- Owner:
- Source:
Part #2:
- Part: Bois des Poisses
- City: Aubaine, Bessey-en-Chaume, Montceau-et-Écharnant, Cussy-la-Colonne, Ivry-en-Montagne, Santosse
- Commissioning:
- 3 turbines: Vestas V100/2000 (power 2 000 kW, diameter 100 m)
- Hub height:
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: RES
- Operator: RES
- Owner:
- Source:
Part #3:
- Part: Nord Est
- City: Aubaine, Bessey-en-Chaume, Montceau-et-Écharnant, Cussy-la-Colonne, Ivry-en-Montagne, Santosse
- Commissioning:
- 9 turbines: Vestas V100/2000 (power 2 000 kW, diameter 100 m)
- Hub height:
- Total nominal power: 18,000 kW
- Operational
- Onshore wind farm
- Developer: RES
- Operator: RES
- Owner:
- Source:
Part #4:
- Part: Sud
- City: Aubaine, Bessey-en-Chaume, Montceau-et-Écharnant, Cussy-la-Colonne, Ivry-en-Montagne, Santosse
- Commissioning:
- 9 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:
- Total nominal power: 18,000 kW
- Operational
- Onshore wind farm
- Developer: RES
- Operator: RES
- Owner:
- Source:
Localisation
Part #1:
- Latitude: 47° 6' 2.7"
- Longitude: 4° 44' 3.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Bois des Poisses
- Latitude: 47° 6' 2.7"
- Longitude: 4° 44' 3.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Nord Est
- Latitude: 47° 2' 17.1"
- Longitude: 4° 38' 58.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Part: Sud
- Latitude: 47° 1' 32.4"
- Longitude: 4° 39' 3.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 30 October 2024
Complete/correct this sheet: