[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Kalkar
- Commissioning:
- 1 turbine: Nordex N131 (power 3 000 kW, diameter 131 m)
- Hub height:
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Kalkar
- Commissioning:
- 1 turbine: Seewind S 20 110 (power 110 kW, diameter 22 m)
- Hub height:
- Total nominal power: 110 kW
- Operational
- Onshore wind farm
Part #3:
- City: Kalkar
- Commissioning:
- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
Part #4:
- City: Kalkar
- Commissioning:
- 1 turbine: Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Hub height:
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
Part #5:
- Part: Wissel
- City: Kalkar
- Commissioning:
- 2 turbines: Fuhrländer FL 1000/54 (power 1 000 kW, diameter 54 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #6:
- Part: Wissel
- Commissioning:
- 1 turbine: Fuhrländer FL MD/70 (power 1 500 kW, diameter 70 m)
- Hub height:
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 44' 29.9"
- Longitude: 6° 19' 25.8"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 51° 43' 18.7"
- Longitude: 6° 21' 40.9"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 51° 42' 55.3"
- Longitude: 6° 17' 18.1"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 51° 45' 18"
- Longitude: 6° 20' 45.6"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
Part #6:
Update for this sheet: 9 December 2024
Complete/correct this sheet: