[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Willenscharen
- Commissioning:
- 8 turbines: Vestas V66/1650 (power 1 650 kW, diameter 66 m)
- Hub height:
- Total nominal power: 13,200 kW
- Dismantled (2021/04)
- Onshore wind farm
- Developer: Das grüne Emissionshaus
- Source:
Part #2:
- City: Brokstedt
- Commissioning:
- 5 turbines: Vestas V66/1750 (power 1 750 kW, diameter 66 m)
- Hub height:
- Total nominal power: 8,750 kW
- Dismantled (2021/04)
- Onshore wind farm
Part #3:
- City: Brokstedt
- Commissioning:
- 1 turbine: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
Part #4:
- City: Segeberg
- Commissioning:
- 3 turbines: Enercon E126/4000 (power 4 000 kW, diameter 127 m)
- Hub height:
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
Part #5:
- City: Segeberg
- Commissioning:
- 2 turbines: Enercon E126/4000 (power 4 000 kW, diameter 127 m)
- Hub height:
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 54° 0' 35.5"
- Longitude: 9° 50' 38.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 54° 0' 35.5"
- Longitude: 9° 50' 38.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 54° 0' 42.9"
- Longitude: 9° 51' 33.4"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 54° 0' 28.1"
- Longitude: 9° 50' 2.6"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 54° 0' 28.1"
- Longitude: 9° 50' 2.6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 4 June 2024
Complete/correct this sheet: