[Back to previous page]
Generalities
|
|
Details
- City: Capestere-de-Marie-Galante
- Commissioning:
- 6 turbines: Enercon E44/900 (power 900 kW, diameter 44 m)
- Total nominal power: 5,400 kW
- Operational
- Onshore wind farm
- Developer: TotalEnergies
- Operator: TotalEnergies
- Owner:
Localisation
- Latitude: 15° 55' 45.3"
- Longitude: -61° 14' 6.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 20 October 2023
Complete/correct this sheet: