Generalities
|
|
Details
Part #1:
- Part: Partie 1 - LEF Colas
- City: Seneffe
- Commissioning:
- 1 turbine: Vestas V110/2200 (power 2 200 kW, diameter 110 m)
- Total nominal power: 2,200 kW
- Operational
- Onshore wind farm
- Developer: EDF Luminus
Part #2:
- Part: Partie 2 - Unilin
- City: Seneffe
- Commissioning:
- 2 turbines: Nordex N117/3600 (power 3 600 kW, diameter 117 m)
- Hub height:
- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
- Developer: Engie
- Operator: Wind4Wallonia
- Owner:
Localisation
Part #1:
- Part: Partie 1 - LEF Colas
- Latitude: 50° 31' 59.7"
- Longitude: 4° 11' 58.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Partie 2 - Unilin
- Latitude: 50° 32' 1.8"
- Longitude: 4° 12' 32.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures
Author: Philippe de Troy - License: All right reserved
Picture reference: 14998 - Date: 2022
Author: Philippe de Troy - License: All right reserved
Picture reference: 14999 - Date: 2022
Author: Philippe de Troy - License: All right reserved
Picture reference: 15030 - Date: 2022
Author: Philippe de Troy - License: All right reserved
Picture reference: 15031 - Date: 2022
Author: Philippe de Troy - License: All right reserved
Picture reference: 15032 - Date: 2022
Author: Philippe de Troy - License: All right reserved
Picture reference: 15033 - Date: 2022
Author: Philippe de Troy - License: All right reserved
Picture reference: 15034 - Date: 2022
Author: Philippe de Troy - License: All right reserved
Picture reference: 15035 - Date: 2022
Update for this sheet: 10 May 2022
Complete/correct this sheet: