Generalities
|
|
Details
- City: Chigné
- Commissioning:

- 3 turbines: Vestas V100/2200 (power 2 200 kW, diameter 100 m)
- Hub height:

- Total nominal power: 6,600 kW
- Operational
- Onshore wind farm
- Developer: Energieteam
- Operators: CNR/Engie
- Owner:

Localisation
- Latitude: 47° 33' 1.5"
- Longitude: 0° 5' 32.6"
- Geodetic system: WGS84
- Precise localization: no
Pictures

Author: Nicolas Desile - License: All right reserved
Picture reference: 15007 - Date: 2022

Author: Nicolas Desile - License: All right reserved
Picture reference: 15008 - Date: 2022

Author: Nicolas Desile - License: All right reserved
Picture reference: 15009 - Date: 2022

Author: Nicolas Desile - License: All right reserved
Picture reference: 15010 - Date: 2022
Update for this sheet: 0