[Back to previous page]
Generalities
|
|
Details
- City: Saint-Pierremont
- Commissioning:
- 2 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Total nominal power: 4,100 kW
- Operational
- Onshore wind farm
- Developer: Maïa Eolis
- Operator: Engie
- Source:
Localisation
- Latitude: 49° 42' 52.5"
- Longitude: 3° 52' 20.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 16 October 2023
Complete/correct this sheet: