[Back to previous page]
Generalities
|
|
Details
- City: Chauché, Saint-André-Goule-d’Oie
- Commissioning:
- 5 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Hub height:
- Total nominal power: 11,750 kW
- Operational
- Onshore wind farm
- Developer: Energieteam
- Operator: Energieteam
- Source:
Localisation
- Latitude: 46° 50' 9.8"
- Longitude: -1° 13' 37.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures
Author: Nicolas Desile - License: All right reserved
Picture reference: 15298 - Date: 2023
Author: Nicolas Desile - License: All right reserved
Picture reference: 15299 - Date: 2023
Author: Nicolas Desile - License: All right reserved
Picture reference: 15300 - Date: 2023
Author: Nicolas Desile - License: All right reserved
Picture reference: 15301 - Date: 2023
Update for this sheet: 29 October 2024
Complete/correct this sheet: