[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Dreen Cutia
- City: Pedra Grande
- Commissioning:
- 13 turbines: WEG AGW 110/2.1 (power 2 100 kW, diameter 110 m)
- Total nominal power: 27,300 kW
- Operational
- Onshore wind farm
- Developer: Copel
- Operator: Copel
- Owner:
- Source:
Part #2:
- Part: Dreen Guajiru
- City: Pedra Grande
- Commissioning:
- 10 turbines: WEG AGW 110/2.1 (power 2 100 kW, diameter 110 m)
- Total nominal power: 21,000 kW
- Operational
- Onshore wind farm
- Developer: Copel
- Operator: Copel
- Owner:
- Source:
Part #3:
- Part: Esperança do Nordeste
- City: Pedra Grande
- Commissioning:
- 13 turbines: WEG AGW 110/2.1 (power 2 100 kW, diameter 110 m)
- Total nominal power: 27,300 kW
- Operational
- Onshore wind farm
- Developer: Copel
- Operator: Copel
- Owner:
- Source:
Part #4:
- Part: GE Jangada
- City: Pedra Grande
- Commissioning:
- 13 turbines: WEG AGW 110/2.1 (power 2 100 kW, diameter 110 m)
- Total nominal power: 27,300 kW
- Operational
- Onshore wind farm
- Developer: Copel
- Operator: Copel
- Owner:
- Source:
Part #5:
- Part: GE Maria Helena
- City: Pedra Grande
- Commissioning:
- 13 turbines: WEG AGW 110/2.1 (power 2 100 kW, diameter 110 m)
- Total nominal power: 27,300 kW
- Operational
- Onshore wind farm
- Developer: Copel
- Operator: Copel
- Owner:
- Source:
Part #6:
- Part: Paraiso dos Ventos do Nordeste
- City: Pedra Grande
- Commissioning:
- 13 turbines: WEG AGW 110/2.1 (power 2 100 kW, diameter 110 m)
- Total nominal power: 27,300 kW
- Operational
- Onshore wind farm
- Developer: Copel
- Operator: Copel
- Owner:
- Source:
Part #7:
- Part: Potiguar
- City: Pedra Grande
- Commissioning:
- 13 turbines: WEG AGW 110/2.1 (power 2 100 kW, diameter 110 m)
- Total nominal power: 27,300 kW
- Operational
- Onshore wind farm
- Developer: Copel
- Operator: Copel
- Owner:
- Source:
Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Part #5:
Part #6:
Part #7:
Update for this sheet: 28 October 2024
Complete/correct this sheet: