[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Angical
- City: Pindai
- Commissioning:
- 8 turbines: Gamesa G90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 16,000 kW
- Operational
- Onshore wind farm
- Developer: Sequoia
- Source:
Part #2:
- Part: Caititu
- City: Pindai
- Commissioning:
- 11 turbines: Gamesa G90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 22,000 kW
- Operational
- Onshore wind farm
- Developers: Sequoia/Chesf
- Source:
Part #3:
- Part: Coqueirinho
- City: Pindai
- Commissioning:
- 6 turbines: Gamesa G90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Developer: Sequoia
- Source:
Part #4:
- Part: Corrupião I
- City: Pindai
- Commissioning:
- 11 turbines: Gamesa G90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 22,000 kW
- Operational
- Onshore wind farm
- Developer: Sequoia
- Source:
Part #5:
- Part: Inhambu I
- City: Pindai
- Commissioning:
- 17 turbines: GE Energy 1.85-87 (power 1 850 kW, diameter 87 m)
- Total nominal power: 31,450 kW
- Operational
- Onshore wind farm
- Developer: Sequoia
Part #6:
- Part: Tamandua Mirim
- City: Pindai
- Commissioning:
- 8 turbines: Gamesa G90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 16,000 kW
- Operational
- Onshore wind farm
- Developer: Sequoia
- Source:
Part #7:
- Part: Teiu
- City: Pindai
- Commissioning:
- 8 turbines: Gamesa G90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 16,000 kW
- Operational
- Onshore wind farm
- Developer: Sequoia
- Source:
Localisation
Part #1:
Part #2:
Part #3:
Part #4:
Part #5:
Part #6:
Part #7:
Update for this sheet: 0
Complete/correct this sheet: