[Back to previous page]
Generalities
|
|
Details
Part #1:
- Commissioning:

- 34 turbines: Guangdong Mingyang SCD3000/100 (power 3 000 kW, diameter 100 m)
- Total nominal power: 102,000 kW
- Operational
- Onshore wind farm
- Owner:

Part #2:
- Commissioning:

- 3 turbines: Guangdong Mingyang
- Total nominal power: 19,500 kW
- Operational
- Onshore wind farm
- Owner:

Localisation
Part 1 : no data.
Part 2 : no data.
Update for this sheet: 0
Complete/correct this sheet: