[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Middelburg
- Commissioning:
- 6 turbines: Neg Micon NM60/1000 (power 1 000 kW, diameter 60 m)
- Total nominal power: 6,000 kW
- Dismantled (2017/10)
- Onshore wind farm
Part #2:
- City: Borsele
- Commissioning:
- 6 turbines: Neg Micon NM60/1000 (power 1 000 kW, diameter 60 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 28' 55.7"
- Longitude: 3° 42' 41.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 28' 55.7"
- Longitude: 3° 42' 41.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 6 August 2024
Complete/correct this sheet: