The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Rysensten Hovedgard-Bovling (Denmark)


Sign up    Log in    Search

[Back to previous page]

Denmark wind farms file

 

General data

  Map  

Generalities

Details


Part #1:

  • City: Bovling
  • Commissioning:
  • 1 turbine: Siemens
  • Hub height:
  • Total nominal power: 4,000 kW
  • Dismantled (2019/07)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #2:

  • City: Bovling
  • Commissioning:
  • 1 turbine: Siemens
  • Hub height:
  • Total nominal power: 6,000 kW
  • Dismantled (2013/08)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #3:

  • City: Bovling
  • Commissioning:
  • 1 turbine: Siemens SWT-2.3-93 (power 2 300 kW, diameter 93 m)
  • Hub height:
  • Total nominal power: 2,300 kW
  • Dismantled (2020/08)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #4:

  • City: Bovling
  • Commissioning:
  • 1 turbine: Vestas
  • Hub height:
  • Total nominal power: 2,200 kW
  • Dismantled (2017/03)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #5:

  • City: Bovling
  • Commissioning:
  • 1 turbine: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
  • Hub height:
  • Total nominal power: 3,000 kW
  • Dismantled (2004/11)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #6:

  • City: Bovling
  • Commissioning:
  • 1 turbine: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
  • Hub height:
  • Total nominal power: 2,000 kW
  • Dismantled (2004/11)
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #7:

  • City: Bovling
  • Commissioning:
  • 1 turbine: Vestas V110/2000 (power 2 000 kW, diameter 110 m)
  • Hub height:
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm
  • Source: Reserved for Premium Access

Part #8:

  • City: Bovling
  • Commissioning:
  • 1 turbine: Siemens-Gamesa SG 4.5-145 (power 4 500 kW, diameter 145 m)
  • Hub height:
  • Total nominal power: 5,000 kW (uprated turbine)
  • Operational
  • Onshore wind farm

Localisation


Part #1:

  • Latitude: 56° 25' 4.4"
  • Longitude: 8° 10' 50.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 56° 25' 4.4"
  • Longitude: 8° 10' 50.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 56° 25' 4.4"
  • Longitude: 8° 10' 50.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 56° 25' 4.4"
  • Longitude: 8° 10' 50.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 56° 25' 4.4"
  • Longitude: 8° 10' 50.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 56° 25' 4.4"
  • Longitude: 8° 10' 50.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Latitude: 56° 25' 4.4"
  • Longitude: 8° 10' 50.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:

  • Latitude: 56° 25' 4.4"
  • Longitude: 8° 10' 50.5"
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 24 June 2021
Complete/correct this sheet:



The Wind Power
All rights reserved - 2005-2024 - Cookie Policy
Conditions of Use and Sale - Partners
The Wind Power LinkedIn page  The Wind Power Twitter page