Generalities
|
|
Details
- City: Hardanges
- Commissioning:
- 3 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Hub height:
- Total nominal power: 7,050 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Owner:
- Source:
Localisation
- Latitude: 48° 21' 21.6"
- Longitude: -0° 24' 11.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view