[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Hochheim
- Commissioning:
- 1 turbine: Tacke 1.5s (power 1 500 kW, diameter 70.5 m)
- Hub height:
- Total nominal power: 1,500 kW
- Dismantled (2019/07)
- Onshore wind farm
Part #2:
- City: Nessetal
- Commissioning:
- 1 turbine: Tacke 1.5s (power 1 500 kW, diameter 70.5 m)
- Hub height:
- Total nominal power: 1,500 kW
- Dismantled (2019/07)
- Onshore wind farm
Part #3:
- City: Nessetal
- Commissioning:
- 1 turbine: Vestas V126/3300 (power 3 300 kW, diameter 126 m)
- Hub height:
- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
- Owner:
Part #4:
- City: Bad Langensalza
- Commissioning:
- 3 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Part #5:
- City: Bad Langensalza
- Commissioning:
- 1 turbine: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #6:
- City: Hochheim
- Commissioning:
- 2 turbines: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Hub height:
- Total nominal power: 4,800 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #7:
- City: Hochheim
- Commissioning:
- 4 turbines: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Hub height:
- Total nominal power: 9,600 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #8:
- City: Hochheim
- Commissioning:
- 1 turbine: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Hub height:
- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #9:
- City: Hochheim
- Commissioning:
- 1 turbine: Vestas V150/4000-4200 (power 4 000 kW, diameter 150 m)
- Hub height:
- Total nominal power: 4,200 kW (uprated turbine)
- Operational
- Onshore wind farm
- Developer: BOREAS
- Source:
Part #10:
- City: Nessetal
- Commissioning:
- 2 turbines: Vestas V150/4000-4200 (power 4 000 kW, diameter 150 m)
- Hub height:
- Total nominal power: 8,400 kW (uprated turbines)
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 2' 18"
- Longitude: 10° 39' 42.5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 51° 2' 27.7"
- Longitude: 10° 39' 37.7"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 51° 2' 8.3"
- Longitude: 10° 39' 21.2"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 51° 1' 58.6"
- Longitude: 10° 39' 6.3"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 51° 1' 26.6"
- Longitude: 10° 38' 35.4"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 51° 1' 49.7"
- Longitude: 10° 39' 56.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #7:
- Latitude: 51° 1' 49.7"
- Longitude: 10° 39' 56.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #8:
- Latitude: 51° 1' 49.7"
- Longitude: 10° 39' 56.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #9:
- Latitude: 51° 2' 20.5"
- Longitude: 10° 39' 45.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #10:
- Latitude: 51° 2' 2.4"
- Longitude: 10° 38' 55.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 27 October 2023
Complete/correct this sheet: