[Back to previous page]
Generalities
|
|
Details
- City: La Malmaison
- Commissioning:
- 6 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Total nominal power: 13,800 kW
- Operational
- Onshore wind farm
- Developer: WPD
- Operator: WPD
- Owner:
- Source:
- Source:
Localisation
- Latitude: 49° 30' 48.2"
- Longitude: 4° 1' 44.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures
Author: Gabriel Govaert - License: All right reserved
Picture reference: 15853 - Date: 2023
Author: Gabriel Govaert - License: All right reserved
Picture reference: 15854 - Date: 2023
Author: Gabriel Govaert - License: All right reserved
Picture reference: 15855 - Date: 2023
Author: Gabriel Govaert - License: All right reserved
Picture reference: 15856 - Date: 2023
Author: Gabriel Govaert - License: All right reserved
Picture reference: 15857 - Date: 2023
Update for this sheet: 30 October 2024
Complete/correct this sheet: