Generalities
|
|
Details
Part #1:
- Part: Tourny
- City: Vexin-sur-Epte
- Commissioning:
- 3 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Total nominal power: 6,900 kW
- Operational
- Onshore wind farm
- Developer: Energieteam
- Operator: Energieteam
Part #2:
- Part: Tourny
- City: Vexin-sur-Epte
- Commissioning:
- 3 turbines: Enercon E82/2350 (power 2 350 kW, diameter 82 m)
- Total nominal power: 7,050 kW
- Operational
- Onshore wind farm
- Developer: Energieteam
- Operator: Energieteam
Localisation
Part #1:
- Part: Tourny
- Latitude: 49° 10' 42.6"
- Longitude: 1° 37' 23.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Tourny
- Latitude: 49° 10' 42.6"
- Longitude: 1° 37' 23.1"
- Geodetic system: WGS84
- Precise localization: no