[Back to previous page]
Generalities
|
|
Details
- City: Frévent
- Commissioning:
- 4 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Total nominal power: 8,200 kW
- Operational
- Onshore wind farm
- Developer: Infinivent
- Operator: Allianz
- Owner:
Localisation
Update for this sheet: 17 October 2023
Complete/correct this sheet: