[Back to previous page]
Generalities
|
|
Details
- City: Hornillos de Cerrato, Torquemada
- Commissioning:
- 11 turbines: Gamesa G90/2000 (power 2 000 kW, diameter 90 m)
- Total nominal power: 22,000 kW
- Operational
- Onshore wind farm
- Developer: Acciona Energia
- Operator: Acciona Energia
- Owner:
Localisation
- Latitude: 41° 57' 36"
- Longitude: -4° 15' 35.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 2 January 2024
Complete/correct this sheet: