[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Saint-Cirgues-en-Montagne, Le Béage, le Cros-de-Géorand, Mazan-l’Abbaye, le Roux, Sagnes-et-Goudoulet, Sainte-Eulalie, Usclades-et-Rieutord
- Commissioning:
- 3 turbines: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
- Hub height:
- Total nominal power: 6,150 kW
- Operational
- Onshore wind farm
- Developer: Enel GreenPower
- Operator: Boralex
- Owner:
- Source:
Part #2:
- City: Saint-Cirgues-en-Montagne, Le Béage, le Cros-de-Géorand, Mazan-l’Abbaye, le Roux, Sagnes-et-Goudoulet, Sainte-Eulalie, Usclades-et-Rieutord
- Commissioning:
- 6 turbines: Senvion MM82/2050 (power 2 050 kW, diameter 82 m)
- Hub height:
- Total nominal power: 12,300 kW
- Operational
- Onshore wind farm
- Developer: Enel GreenPower
- Operator: Boralex
- Owner:
- Source:
Localisation
Part #1:
Part #2:
Update for this sheet: 31 October 2024
Complete/correct this sheet: