|
General data | Wind farms |
By zones | Map | Media | IREC Index |
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
4 vents | 7,500 | 3 | Operational | ||||||
4 vents | 7,500 | 3 | Operational | ||||||
4 vents | 10,000 | 4 | Operational | ||||||
4 vents | 10,000 | 4 | Operational | ||||||
Ablaincourt | 36,000 | 10 | Operational | ||||||
Ablaincourt-Pressoir | 4,100 | 2 | Operational | ||||||
Ablainzevelle | 2,000 | 1 | Operational | ||||||
Achery-Mayot | 27,500 | 11 | Operational | ||||||
Achiet-le-Petit I | 21,000 | 7 | Operational | ||||||
Achiet-le-Petit II | 7,050 | 3 | Operational | ||||||
Achiet-le-Petit III | 4,700 | 2 | Operational | ||||||
Adriers | 10,000 | 5 | Operational | ||||||
AFLOWT France | 6,000 | Planned | |||||||
Agenville | 6,000 | 2 | Operational | ||||||
Aiguillettes | 18,000 | 6 | Operational | ||||||
Ailes de la Vence | 2,400 | 3 | Operational | ||||||
Aire de Baie de Somme | 250 | 1 | Dismantled | ||||||
Aisne 1 | 12,000 | 4 | Operational | ||||||
Alizeo | 1,000 | 1 | Dismantled | ||||||
Allainville-aux-Bois | 10,350 | 3 | Operational | ||||||
Allainville-aux-Bois | 6,900 | 2 | Operational | ||||||
Allanche | 12,000 | 4 | Operational | ||||||
Allanche | 12,000 | 4 | Operational | ||||||
Allenay et Friaucourt | 8,000 | 4 | Operational | ||||||
Allery | 4,600 | 2 | Operational | ||||||
Allondrelle-la-Malmaison | 10,000 | 5 | Operational | ||||||
Ally | 10,500 | 7 | Operational | ||||||
Ally | 10,500 | 7 | Operational | ||||||
Ally | 10,500 | 7 | Operational | ||||||
Ally | 7,500 | 5 | Operational | ||||||
Amanty | 2,050 | 1 | Operational | ||||||
Ambon | 10,020 | 6 | Dismantled | ||||||
Ambon | 6 | Under construction | |||||||
Amelécourt | 12,500 | 5 | Operational | ||||||
Andilly-les-Marais | 16,800 | 3 | Operational | ||||||
Angerville | 8,800 | 4 | Operational | ||||||
Angrie | 11,000 | 5 | Operational | ||||||
Anguilcourt-le-Sart | 12,000 | 6 | Operational | ||||||
Anoux-Saint-Saumont | 10,250 | 5 | Operational | ||||||
Antezant Saint-Pardoult | 12,000 | 4 | Operational | ||||||
Antezant-la-Chapelle | 16,000 | 8 | Operational | ||||||
Antoigné | 8,000 | 4 | Operational | ||||||
Apremont | 11,750 | 5 | Operational | ||||||
Ar Tri Milin | 9,000 | 6 | Operational | ||||||
Arc-en-Thiérache | 16,000 | 8 | Operational | ||||||
Archingeay | 8,000 | 4 | Operational | ||||||
Arcy | 12,000 | 6 | Operational | ||||||
Arcy-Précy | 4,000 | 2 | Operational | ||||||
Ardin | 9,150 | 3 | Operational | ||||||
Ardouval | 12,500 | 5 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Arf... | 12,000 | 6 | Operational | ||||||
Arf... | 10,000 | 5 | Operational | ||||||
Arg... | 4,800 | 6 | Operational | ||||||
Arg... | 25,600 | 8 | Operational | ||||||
Arg... | 11,900 | 14 | Operational | ||||||
Arg... | 4,250 | 5 | Operational | ||||||
Arg... | 37,600 | 16 | Operational | ||||||
Arg... | 4,000 | 2 | Operational | ||||||
Arq... | 10,000 | 5 | Operational | ||||||
Arq... | 10,000 | 5 | Operational | ||||||
Arq... | 2,000 | 1 | Operational | ||||||
Art... | 48,200 | 22 | Operational | ||||||
Art... | 23,100 | 7 | Operational | ||||||
Arv... | 12,000 | 6 | Operational | ||||||
Asc... | 13,600 | 4 | Operational | ||||||
Ass... | 12,000 | 6 | Operational | ||||||
Att... | 6,000 | 2 | Operational | ||||||
Aub... | 12,500 | 5 | Operational | ||||||
Aud... | 14,100 | 6 | Operational | ||||||
Aud... | 4,000 | 2 | Operational | ||||||
Aul... | 8,000 | 4 | Operational | ||||||
Aul... | 19,200 | 8 | Operational | ||||||
Aun... | 13,500 | 9 | Operational | ||||||
Aun... | 7,050 | 3 | Operational | ||||||
Aup... | 500 | 2 | Operational | ||||||
Aus... | 8,000 | 4 | Operational | ||||||
Aut... | 12,500 | 5 | Operational | ||||||
Aut... | 12,500 | 5 | Operational | ||||||
Aut... | 2,500 | 1 | Operational | ||||||
Aut... | 14,400 | 6 | Operational | ||||||
Aux... | 12,000 | 6 | Operational | ||||||
Aux... | 16,000 | 8 | Operational | ||||||
Ava... | 20,000 | 10 | Operational | ||||||
Ave... | 12,000 | 4 | Operational | ||||||
Ave... | 12,000 | 6 | Operational | ||||||
Ave... | 12,000 | 4 | Operational | ||||||
Ave... | 10,000 | 5 | Operational | ||||||
Avi... | 8,000 | 10 | Operational | ||||||
Avi... | 4,600 | 2 | Operational | ||||||
Ays... | 12,000 | 8 | Operational | ||||||
Azé... | 8,800 | 4 | Operational | ||||||
Azé... | 13,200 | 6 | Operational | ||||||
Baâ... | 6,600 | 3 | Operational | ||||||
Bai... | 20,700 | 6 | Under construction | ||||||
Bai... | 2,300 | 1 | Operational | ||||||
Bai... | 2,300 | 1 | Operational | ||||||
Bai... | 6,000 | 3 | Operational | ||||||
Baj... | 12,000 | 6 | Operational | ||||||
Bal... | 20,700 | 9 | Operational | ||||||
Bal... | 9,200 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Bal... | 6,000 | 3 | Operational | ||||||
Bal... | 2,300 | 1 | Operational | ||||||
Bam... | 12,000 | 6 | Operational | ||||||
Bar... | 10,000 | 5 | Operational | ||||||
Bar... | 12,000 | 6 | Operational | ||||||
Bas... | 19,800 | 6 | Operational | ||||||
Bas... | 24,000 | 8 | Operational | ||||||
Bas... | 17,100 | 6 | Operational | ||||||
Bas... | 13,200 | 6 | Operational | ||||||
Bas... | 6,600 | 3 | Operational | ||||||
Bas... | 13,200 | 6 | Operational | ||||||
Bas... | 6,600 | 3 | Operational | ||||||
Bas... | 13,200 | 6 | Operational | ||||||
Bau... | 12,300 | 6 | Operational | ||||||
Bau... | 11,500 | 5 | Operational | ||||||
Baz... | 12,000 | 4 | Operational | ||||||
Bea... | 12,500 | 5 | Operational | ||||||
Bea... | 8,000 | 4 | Operational | ||||||
Bea... | 12,000 | 6 | Operational | ||||||
Bea... | 12,000 | 4 | Operational | ||||||
Bea... | 6,900 | 2 | Operational | ||||||
Bea... | 4,600 | 2 | Operational | ||||||
Bea... | 12,000 | 6 | Operational | ||||||
Bea... | 10,800 | 6 | Operational | ||||||
Bea... | 14,400 | 4 | Operational | ||||||
Bea... | 12,000 | 6 | Operational | ||||||
Bea... | 2,050 | 1 | Operational | ||||||
Bea... | 10,000 | 5 | Operational | ||||||
Bea... | 10,000 | 5 | Operational | ||||||
Bea... | 2,000 | 1 | Operational | ||||||
Bea... | 10,000 | 5 | Operational | ||||||
Bea... | 18,000 | 5 | Operational | ||||||
Bea... | 10,000 | 5 | Operational | ||||||
Bea... | 5,000 | 2 | Operational | ||||||
Beg... | 14,400 | 4 | Under construction | ||||||
Bég... | 8,200 | 4 | Operational | ||||||
Bel... | 8,000 | 4 | Operational | ||||||
Bel... | 6,900 | 3 | Dismantled | ||||||
Bel... | 6,900 | 3 | Operational | ||||||
Bel... | 10,350 | 3 | Operational | ||||||
Bel... | 8,000 | 4 | Operational | ||||||
Ben... | 17,250 | 5 | Operational | ||||||
Ber... | 10,395 | 3 | Operational | ||||||
Ber... | 12,000 | 8 | Operational | ||||||
Ber... | 12,300 | 6 | Operational | ||||||
Ber... | 10,250 | 5 | Operational | ||||||
Bét... | 12,000 | 6 | Operational | ||||||
Bet... | 11,750 | 5 | Operational | ||||||
Beu... | 10,000 | 4 | Operational | ||||||
Beu... | 1,500 | 1 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Beu... | 1,500 | 1 | Operational | ||||||
Bi-... | 7,050 | 3 | Operational | ||||||
Bie... | 12,000 | 6 | Operational | ||||||
Big... | 2,000 | 2 | Operational | ||||||
Bit... | 4,700 | 2 | Operational | ||||||
Bit... | 9,400 | 4 | Operational | ||||||
Bla... | 13,200 | 6 | Operational | ||||||
Bla... | 2,200 | 1 | Operational | ||||||
Bla... | 13,800 | 6 | Operational | ||||||
Bla... | 7,050 | 3 | Operational | ||||||
Bla... | 4,000 | 1 | Operational | ||||||
Bla... | 14,000 | 4 | Operational | ||||||
Bla... | 11,000 | 5 | Operational | ||||||
Blo... | 8,000 | 4 | Operational | ||||||
Bod... | 3,200 | 4 | Operational | ||||||
Boi... | 12,500 | 5 | Operational | ||||||
Boi... | 10,000 | 4 | Operational | ||||||
Boi... | 14,400 | 4 | Operational | ||||||
Boi... | 12,000 | 6 | Operational | ||||||
Boi... | 20,000 | 10 | Operational | ||||||
Boi... | 6,150 | 3 | Operational | ||||||
Boi... | 8,000 | 4 | Operational | ||||||
Boi... | 22,550 | 11 | Operational | ||||||
Boi... | 11,500 | 5 | Operational | ||||||
Boi... | 16,100 | 7 | Operational | ||||||
Boi... | 24,600 | 12 | Operational | ||||||
Boi... | 12,000 | 6 | Operational | ||||||
Boi... | 4,700 | 2 | Operational | ||||||
Boi... | 11,750 | 5 | Operational | ||||||
Boi... | 25,200 | 7 | Operational | ||||||
Boi... | 13,800 | 4 | Operational | ||||||
Boi... | 10,000 | 5 | Operational | ||||||
Boi... | 9,600 | 4 | Operational | ||||||
Boi... | 22,000 | 10 | Operational | ||||||
Boi... | 11,750 | 5 | Operational | ||||||
Boi... | 12,300 | 6 | Operational | ||||||
Boi... | 11,500 | 5 | Operational | ||||||
Boi... | 13,200 | 4 | Operational | ||||||
Boi... | 21,600 | 6 | Operational | ||||||
Boi... | 13,800 | 6 | Operational | ||||||
Boi... | 18,000 | 6 | Operational | ||||||
Boi... | 10,000 | 5 | Operational | ||||||
Boi... | 2,000 | 1 | Operational | ||||||
Boi... | 4,000 | 2 | Operational | ||||||
Boi... | 15,000 | 6 | Operational | ||||||
Bol... | 6,900 | 3 | Operational | ||||||
Bom... | 7,050 | 3 | Operational | ||||||
Bon... | 750 | 1 | Operational | ||||||
Bon... | 12,000 | 4 | Operational | ||||||
Bon... | 12,000 | 6 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Bon... | 21,000 | 7 | Operational | ||||||
Boq... | 8,000 | 4 | Operational | ||||||
Bor... | 15,000 | 5 | Operational | ||||||
Bor... | 11,500 | 5 | Operational | ||||||
Bou... | 18,000 | 6 | Operational | ||||||
Bou... | 12,000 | 6 | Dismantled | ||||||
Bou... | 11,500 | 5 | Operational | ||||||
Bou... | 9,000 | 6 | Operational | ||||||
Bou... | 12,000 | 5 | Operational | ||||||
Bou... | 5,000 | 2 | Operational | ||||||
Bou... | 2,500 | 1 | Dismantled | ||||||
Bou... | 2,500 | 1 | Operational | ||||||
Bou... | 4,000 | 2 | Operational | ||||||
Bou... | 14,100 | 6 | Operational | ||||||
Bou... | 10,000 | 5 | Operational | ||||||
Bou... | 9,000 | 3 | Operational | ||||||
Bou... | 21,000 | 5 | Operational | ||||||
Bou... | 10,000 | 5 | Operational | ||||||
Bou... | 12,300 | 6 | Operational | ||||||
Bou... | 2,200 | 1 | Operational | ||||||
Bou... | 4,400 | 2 | Operational | ||||||
Bou... | 2,200 | 1 | Operational | ||||||
Bou... | 4,400 | 2 | Operational | ||||||
Bou... | 16,500 | 5 | Operational | ||||||
Bou... | 12,600 | 7 | Operational | ||||||
Bou... | 3,600 | 2 | Operational | ||||||
Bou... | 7,200 | 9 | Operational | ||||||
Bou... | 2,000 | 2 | Operational | ||||||
Bra... | 12,500 | 5 | Operational | ||||||
Bra... | 18,375 | 7 | Operational | ||||||
Bre... | 300 | 1 | Operational | ||||||
Bre... | 12,500 | 5 | Operational | ||||||
Bre... | 11,500 | 5 | Operational | ||||||
Bre... | 15,000 | 5 | Operational | ||||||
Bri... | 8,800 | 4 | Operational | ||||||
Bri... | 20,000 | 10 | Operational | ||||||
Bri... | 12,000 | 6 | Operational | ||||||
Bru... | 10,500 | 4 | Operational | ||||||
Buc... | 10,000 | 4 | Operational | ||||||
Bui... | 11,500 | 5 | Operational | ||||||
Bul... | 13,200 | 6 | Operational | ||||||
Bus... | 24,000 | 8 | Operational | ||||||
But... | 7,050 | 3 | Operational | ||||||
But... | 2,350 | 1 | Operational | ||||||
But... | 8,000 | 4 | Operational | ||||||
But... | 6,000 | 3 | Operational | ||||||
But... | 10,000 | 4 | Operational | ||||||
Cai... | 12,000 | 6 | Operational | ||||||
Cal... | 12,500 | 5 | Operational | ||||||
Cal... | 450,000 | 64 | Under construction | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Cam... | 9,200 | 4 | Operational | ||||||
Cam... | 12,000 | 4 | Operational | ||||||
Cam... | 16,450 | 7 | Operational | ||||||
Cam... | 14,100 | 6 | Operational | ||||||
Cam... | 8,350 | 5 | Operational | ||||||
Cam... | 12,500 | 5 | Operational | ||||||
Cam... | 10,000 | 5 | Operational | ||||||
Cam... | 2,700 | 3 | Operational | ||||||
Cam... | 11,500 | 5 | Operational | ||||||
Can... | 10,250 | 5 | Operational | ||||||
Can... | 13,800 | 6 | Operational | ||||||
Can... | 11,500 | 5 | Operational | ||||||
Can... | 24,000 | 8 | Operational | ||||||
Can... | 8,200 | 4 | Operational | ||||||
Cap... | 4,200 | 7 | Dismantled | ||||||
Cap... | 7,800 | 13 | Dismantled | ||||||
Cap... | 11,700 | 13 | Operational | ||||||
Cap... | 11,500 | 5 | Operational | ||||||
Cap... | 3,900 | 3 | Operational | ||||||
Cas... | 10,000 | 4 | Operational | ||||||
Cas... | 2,300 | 1 | Operational | ||||||
Cas... | 11,500 | 5 | Operational | ||||||
Cas... | 29,900 | 13 | Operational | ||||||
Cat... | 10,000 | 5 | Operational | ||||||
Cau... | 17,500 | 7 | Operational | ||||||
Cau... | 17,000 | 5 | Operational | ||||||
Cen... | 1,670 | 1 | Dismantled | ||||||
Cen... | 2,350 | 1 | Operational | ||||||
Cen... | 1,000,000 | Planned | |||||||
Cer... | 12,000 | 4 | Operational | ||||||
Cer... | 12,000 | 4 | Operational | ||||||
Cha... | 27,720 | 8 | Under construction | ||||||
Cha... | 10,800 | 6 | Operational | ||||||
Cha... | 18,000 | 6 | Operational | ||||||
Cha... | 12,300 | 6 | Operational | ||||||
Cha... | 10,000 | 4 | Operational | ||||||
Cha... | 10,500 | 5 | Operational | ||||||
Cha... | 10,500 | 5 | Operational | ||||||
Cha... | 18,000 | 5 | Operational | ||||||
Cha... | 72,600 | 22 | Operational | ||||||
Cha... | 12,600 | 3 | Under construction | ||||||
Cha... | 14,100 | 6 | Operational | ||||||
Cha... | 12,000 | 6 | Operational | ||||||
Cha... | 4,100 | 2 | Operational | ||||||
Cha... | 8,200 | 4 | Operational | ||||||
Cha... | 9,000 | 3 | Operational | ||||||
Cha... | 8,800 | 4 | Operational | ||||||
Cha... | 2,500 | 7 | Operational | ||||||
Cha... | 12,000 | 4 | Operational | ||||||
Cha... | 11,700 | 3 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Cha... | 14,400 | 4 | Operational | ||||||
Cha... | 15,400 | 7 | Operational | ||||||
Cha... | 2,200 | 1 | Operational | ||||||
Cha... | 10,800 | 3 | Under construction | ||||||
Cha... | 11,500 | 5 | Operational | ||||||
Cha... | 16,000 | 8 | Operational | ||||||
Cha... | 12,000 | 6 | Operational | ||||||
Cha... | 14,400 | 6 | Operational | ||||||
Cha... | 12,000 | 6 | Operational | ||||||
Cha... | 12,000 | 6 | Operational | ||||||
Cha... | 9,200 | 4 | Operational | ||||||
Cha... | 20,000 | 10 | Operational | ||||||
Châ... | 16,000 | 8 | Operational | ||||||
Châ... | 800 | 1 | Operational | ||||||
Châ... | 10,000 | 4 | Operational | ||||||
Cha... | 11,750 | 5 | Operational | ||||||
Cha... | 9,000 | 3 | Under construction | ||||||
Cha... | 8,000 | 4 | Operational | ||||||
Cha... | 4,000 | 2 | Operational | ||||||
Cha... | 6,000 | 3 | Operational | ||||||
Cha... | 12,300 | 6 | Operational | ||||||
Che... | 10,000 | 5 | Operational | ||||||
Che... | 29,700 | 9 | Operational | ||||||
Che... | 16,000 | 8 | Operational | ||||||
Che... | 11,750 | 5 | Operational | ||||||
Che... | 12,000 | 6 | Operational | ||||||
Che... | 21,600 | 6 | Operational | ||||||
Che... | 12,000 | 6 | Operational | ||||||
Che... | 12,000 | 4 | Operational | ||||||
Che... | 16,000 | 8 | Operational | ||||||
Che... | 12,000 | 6 | Operational | ||||||
Che... | 17,600 | 8 | Operational | ||||||
Che... | 27,600 | 12 | Operational | ||||||
Che... | 6,600 | 3 | Operational | ||||||
Che... | 52,000 | 26 | Operational | ||||||
Che... | 18,000 | 5 | Operational | ||||||
Che... | 21,600 | 6 | Operational | ||||||
Che... | 18,000 | 9 | Operational | ||||||
Che... | 11,000 | 5 | Under construction | ||||||
Che... | 12,000 | 6 | Operational | ||||||
Chê... | 9,900 | 3 | Operational | ||||||
Che... | 6,000 | 3 | Operational | ||||||
Che... | 8,800 | 4 | Operational | ||||||
Che... | 2,200 | 1 | Operational | ||||||
Che... | 13,200 | 6 | Operational | ||||||
Che... | 10,250 | 5 | Operational | ||||||
Ché... | 4,000 | 2 | Operational | ||||||
Che... | 18,000 | 6 | Operational | ||||||
Che... | 8,200 | 4 | Operational | ||||||
Ché... | 14,000 | 7 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Chi... | 6,600 | 3 | Operational | ||||||
Chi... | 12,000 | 8 | Operational | ||||||
Chi... | 6,600 | 3 | Operational | ||||||
Chi... | 27,600 | 8 | Operational | ||||||
Cho... | 12,000 | 6 | Operational | ||||||
Cla... | 7,050 | 3 | Operational | ||||||
Cla... | 4,000 | 2 | Operational | ||||||
Cla... | 10,020 | 6 | Operational | ||||||
Cla... | 12,300 | 6 | Operational | ||||||
Cli... | 3,300 | 5 | Operational | ||||||
Clo... | 12,000 | 4 | Operational | ||||||
Clu... | 11,000 | 5 | Operational | ||||||
Coa... | 4,600 | 2 | Operational | ||||||
Coa... | 2,300 | 1 | Operational | ||||||
Coa... | 8,100 | 9 | Operational | ||||||
Coa... | 7,200 | 3 | Operational | ||||||
Coa... | 5,600 | 7 | Operational | ||||||
Coë... | 18,000 | 6 | Operational | ||||||
Col... | 12,000 | 4 | Operational | ||||||
Col... | 3,000 | 1 | Operational | ||||||
Com... | 12,500 | 5 | Operational | ||||||
Côm... | 10,000 | 5 | Operational | ||||||
Con... | 12,000 | 6 | Operational | ||||||
Con... | 9,200 | 4 | Operational | ||||||
Con... | 12,000 | 5 | Operational | ||||||
Con... | 12,000 | 6 | Operational | ||||||
Con... | 11,750 | 5 | Operational | ||||||
Coq... | 18,400 | 8 | Operational | ||||||
Coq... | 2,300 | 1 | Operational | ||||||
Coq... | 4,700 | 2 | Operational | ||||||
Coq... | 6,900 | 3 | Operational | ||||||
Coq... | 4,600 | 2 | Operational | ||||||
Coq... | 18,400 | 8 | Operational | ||||||
Cor... | 11,500 | 5 | Operational | ||||||
Cor... | 9,200 | 4 | Operational | ||||||
Cor... | 6,600 | 10 | Operational | ||||||
Cor... | 2,000 | 4 | Dismantled | ||||||
Cor... | 200 | 1 | Dismantled | ||||||
Cor... | 12,000 | 6 | Operational | ||||||
Cor... | 12,000 | 6 | Operational | ||||||
Cor... | 12,000 | 6 | Operational | ||||||
Cor... | 12,000 | 6 | Operational | ||||||
Cor... | 12,000 | 6 | Operational | ||||||
Cor... | 17,500 | 7 | Operational | ||||||
Cor... | 11,050 | 13 | Operational | ||||||
Cos... | 6,900 | 3 | Operational | ||||||
Cos... | 4,600 | 2 | Operational | ||||||
Côt... | 13,800 | 6 | Operational | ||||||
Côt... | 1,500 | 1 | Dismantled | ||||||
Côt... | 3,400 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Côt... | 6,000 | 3 | Operational | ||||||
Côt... | 9,900 | 3 | Operational | ||||||
Côt... | 10,000 | 5 | Operational | ||||||
Côt... | 9,900 | 3 | Operational | ||||||
Côt... | 12,000 | 6 | Operational | ||||||
Côt... | 28,000 | 7 | Operational | ||||||
Côt... | 14,100 | 6 | Operational | ||||||
Cot... | 26,000 | 8 | Operational | ||||||
Cot... | 7,500 | 5 | Operational | ||||||
Côt... | 10,200 | 12 | Operational | ||||||
Côt... | 1,700 | 2 | Operational | ||||||
Côt... | 3,400 | 4 | Operational | ||||||
Côt... | 850 | 1 | Operational | ||||||
Cou... | 10,000 | 5 | Operational | ||||||
Cou... | 18,000 | 6 | Operational | ||||||
Cou... | 4,600 | 2 | Operational | ||||||
Cou... | 10,000 | 4 | Operational | ||||||
Cou... | 7,500 | 3 | Operational | ||||||
Cou... | 7,200 | 2 | Operational | ||||||
Cou... | 12,000 | 5 | Operational | ||||||
Cou... | 22,400 | 7 | Operational | ||||||
Cou... | 11,500 | 5 | Operational | ||||||
Cou... | 7,500 | 3 | Operational | ||||||
Coy... | 10,350 | 3 | Operational | ||||||
Cre... | 10,000 | 5 | Operational | ||||||
Cré... | 8,200 | 4 | Operational | ||||||
Crê... | 8,200 | 4 | Operational | ||||||
Crè... | 4,000 | 2 | Operational | ||||||
Cro... | 12,000 | 4 | Operational | ||||||
Cro... | 28,000 | 14 | Operational | ||||||
Cro... | 12,000 | 4 | Operational | ||||||
Cro... | 12,000 | 4 | Under construction | ||||||
Cro... | 10,500 | 5 | Operational | ||||||
Cro... | 8,000 | 4 | Operational | ||||||
Cro... | 12,300 | 6 | Operational | ||||||
Cro... | 12,300 | 6 | Operational | ||||||
Cro... | 24,000 | 8 | Operational | ||||||
Cro... | 11,500 | 5 | Operational | ||||||
Cro... | 2,300 | 1 | Operational | ||||||
Cru... | 6,000 | 2 | Operational | ||||||
Cru... | 12,000 | 6 | Operational | ||||||
Cru... | 11,500 | 5 | Operational | ||||||
Cru... | 18,400 | 8 | Operational | ||||||
Cuq... | 12,000 | 6 | Operational | ||||||
Cux... | 12,000 | 6 | Operational | ||||||
Cux... | 11,500 | 5 | Operational | ||||||
Dah... | 11,000 | 5 | Operational | ||||||
Dai... | 24,000 | 12 | Operational | ||||||
Dam... | 14,100 | 6 | Operational | ||||||
Dam... | 12,000 | 6 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Dar... | 12,000 | 6 | Operational | ||||||
Dar... | 4,400 | 2 | Operational | ||||||
Dar... | 2,200 | 1 | Operational | ||||||
Dar... | 12,000 | 6 | Operational | ||||||
Deh... | 12,500 | 5 | Operational | ||||||
Del... | 12,300 | 6 | Operational | ||||||
Dem... | 19,800 | 9 | Operational | ||||||
Der... | 8,000 | 4 | Operational | ||||||
Dés... | 1,375 | 5 | Operational | ||||||
Dés... | 275 | 1 | Operational | ||||||
Deu... | 4,000 | 5 | Operational | ||||||
Din... | 12,000 | 4 | Operational | ||||||
Dio... | 10,020 | 6 | Operational | ||||||
Dio... | 1,670 | 1 | Operational | ||||||
Dio... | 15,000 | 6 | Operational | ||||||
Dir... | 1,700 | 2 | Operational | ||||||
Doi... | 16,500 | 5 | Operational | ||||||
Dom... | 12,000 | 6 | Operational | ||||||
Don... | 3,000 | 5 | Operational | ||||||
Dou... | 60,000 | 20 | Operational | ||||||
Duc... | 6,000 | 2 | Operational | ||||||
Duc... | 10,800 | 3 | Operational | ||||||
Dun... | 2,700 | 9 | Dismantled | ||||||
Dun... | 598,000 | Approved | |||||||
Dyé... | 14,000 | 7 | Operational | ||||||
Ech... | 2,000 | 1 | Operational | ||||||
Ech... | 10,000 | 5 | Operational | ||||||
Ecu... | 8,000 | 4 | Operational | ||||||
Ecu... | 16,000 | 8 | Operational | ||||||
EEB... | 6,000 | 2 | Operational | ||||||
El ... | 20,700 | 9 | Operational | ||||||
Ene... | 8,000 | 4 | Operational | ||||||
Ene... | 11,750 | 5 | Operational | ||||||
Ene... | 4 | Operational | |||||||
Ene... | 8,000 | 4 | Operational | ||||||
Ene... | 12,300 | 4 | Operational | ||||||
Ene... | 20,500 | 10 | Operational | ||||||
Ene... | 11,500 | 5 | Operational | ||||||
Ens... | 8,000 | 4 | Operational | ||||||
Ens... | 36,000 | 12 | Operational | ||||||
Ens... | 10,000 | 5 | Operational | ||||||
Ens... | 42,000 | 14 | Operational | ||||||
Ens... | 37,950 | 11 | Operational | ||||||
Ent... | 14,350 | 7 | Operational | ||||||
Ent... | 12,300 | 6 | Operational | ||||||
Ent... | 12,000 | 6 | Operational | ||||||
Ent... | 12,000 | 6 | Operational | ||||||
Ent... | 12,000 | 6 | Operational | ||||||
Ent... | 12,000 | 6 | Operational | ||||||
Ent... | 15,000 | 6 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ent... | 12,500 | 5 | Operational | ||||||
Ent... | 12,500 | 5 | Operational | ||||||
Ent... | 25,300 | 11 | Operational | ||||||
Env... | 8,800 | 4 | Operational | ||||||
Eol... | 8,000 | 4 | Operational | ||||||
Eol... | 12,000 | 6 | Operational | ||||||
Eol... | 9,000 | 3 | Operational | ||||||
Eol... | 2,000 | 1 | Operational | ||||||
Eol... | 6,000 | 3 | Operational | ||||||
Eol... | 17,600 | 8 | Operational | ||||||
Eol... | 43,200 | 12 | Operational | ||||||
Eol... | 20,000 | Planned | |||||||
Eol... | 250,000 | Planned | |||||||
Eol... | 5,000 | Approved | |||||||
Eol... | 1,000,000 | Planned | |||||||
Eol... | 200 | 1 | Dismantled | ||||||
Epi... | 28,800 | 12 | Operational | ||||||
Epi... | 22,800 | 7 | Operational | ||||||
Epi... | 12,000 | 6 | Operational | ||||||
Epl... | 12,500 | 5 | Operational | ||||||
Epl... | 10,000 | 4 | Operational | ||||||
Epl... | 10,000 | 4 | Operational | ||||||
Erb... | 6,900 | 3 | Operational | ||||||
Eri... | 11,500 | 5 | Operational | ||||||
Esc... | 7,500 | 10 | Dismantled | ||||||
Esc... | 11,500 | 5 | Operational | ||||||
Esc... | 12,000 | 6 | Operational | ||||||
Esp... | 17,200 | 5 | Operational | ||||||
Ess... | 12,000 | 4 | Operational | ||||||
Ess... | 8,250 | 3 | Operational | ||||||
EST... | 16,000 | 8 | Operational | ||||||
Eta... | 21,600 | 6 | Operational | ||||||
Eur... | 2,400 | 3 | Operational | ||||||
Fal... | 10,000 | 5 | Operational | ||||||
Fal... | 11,750 | 5 | Operational | ||||||
Fal... | 11,500 | 5 | Operational | ||||||
Fal... | 8,400 | 2 | Operational | ||||||
Fal... | 16,800 | 4 | Operational | ||||||
Fam... | 10,000 | 5 | Operational | ||||||
Feb... | 11,000 | Under construction | |||||||
Féc... | 4,500 | 5 | Operational | ||||||
Féc... | 497,000 | 71 | Operational | ||||||
Fen... | 25,850 | 11 | Operational | ||||||
Fèr... | 27,500 | 11 | Operational | ||||||
Fèr... | 17,500 | 7 | Operational | ||||||
Fie... | 3,000 | 1 | Operational | ||||||
Fie... | 9,000 | 3 | Operational | ||||||
Fie... | 12,300 | 6 | Operational | ||||||
Fie... | 8,000 | 4 | Operational | ||||||
Fie... | 8,200 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Fil... | 10,000 | 4 | Operational | ||||||
Fit... | 9,100 | 7 | Operational | ||||||
Fit... | 1,300 | 1 | Operational | ||||||
Fit... | 10,400 | 8 | Operational | ||||||
Fit... | 1,300 | 1 | Operational | ||||||
Fla... | 10,000 | 5 | Operational | ||||||
FLO... | 2,000 | 1 | Operational | ||||||
Fon... | 4,000 | 2 | Operational | ||||||
Fon... | 11,500 | 5 | Operational | ||||||
Fon... | 4,400 | 20 | Dismantled | ||||||
Fon... | 9,900 | 6 | Operational | ||||||
Fon... | 10,000 | 5 | Operational | ||||||
Fon... | 13,200 | 6 | Operational | ||||||
Fon... | 18,000 | Under construction | |||||||
Fon... | 12,300 | 6 | Operational | ||||||
Fon... | 8,000 | 4 | Operational | ||||||
Fon... | 7,800 | 6 | Operational | ||||||
Fon... | 10,000 | 5 | Operational | ||||||
For... | 64,600 | 17 | Operational | ||||||
For... | 16,000 | 8 | Operational | ||||||
For... | 12,500 | 5 | Operational | ||||||
For... | 8,000 | 4 | Operational | ||||||
For... | 6,000 | 4 | Operational | ||||||
For... | 22,800 | 8 | Operational | ||||||
Fou... | 14,100 | 6 | Operational | ||||||
Foy... | 10,250 | 5 | Operational | ||||||
Fra... | 11,500 | 5 | Operational | ||||||
Fra... | 11,500 | 5 | Operational | ||||||
Fra... | 12,000 | 6 | Operational | ||||||
Fra... | 12,000 | 6 | Operational | ||||||
Fre... | 6,900 | 3 | Operational | ||||||
Fre... | 2,300 | 1 | Operational | ||||||
Fre... | 9,400 | 4 | Operational | ||||||
Fre... | 6,150 | 3 | Operational | ||||||
Fré... | 12,000 | 6 | Operational | ||||||
Fre... | 11,500 | 5 | Operational | ||||||
Fre... | 14,350 | 7 | Operational | ||||||
Fre... | 14,100 | 6 | Operational | ||||||
Fre... | 10,000 | 5 | Operational | ||||||
Fre... | 6,900 | 3 | Operational | ||||||
Fre... | 6,900 | 3 | Operational | ||||||
Fre... | 10,000 | 5 | Operational | ||||||
Fri... | 7,050 | 3 | Operational | ||||||
Fru... | 10,000 | 5 | Operational | ||||||
Fru... | 20,000 | 10 | Operational | ||||||
Fru... | 4,000 | 2 | Operational | ||||||
Fru... | 8,000 | 4 | Operational | ||||||
Fru... | 18,000 | 9 | Operational | ||||||
Fru... | 10,000 | 5 | Operational | ||||||
Fru... | 8,000 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Fru... | 26,000 | 13 | Operational | ||||||
Fru... | 20,000 | 10 | Operational | ||||||
Fru... | 8,000 | 4 | Operational | ||||||
Fru... | 8,000 | 4 | Operational | ||||||
Gai... | 10,600 | 3 | Under construction | ||||||
Gai... | 7,200 | 2 | Under construction | ||||||
Gal... | 15,000 | 5 | Operational | ||||||
Gâp... | 2,000 | 2 | Operational | ||||||
Gar... | 12,000 | 6 | Operational | ||||||
Gar... | 4,000 | 2 | Operational | ||||||
Gar... | 20,500 | 10 | Operational | ||||||
Gav... | 2,000 | 1 | Operational | ||||||
Gen... | 20,300 | 6 | Operational | ||||||
Ger... | 8,000 | 4 | Operational | ||||||
Ger... | 75,000 | 30 | Operational | ||||||
Ger... | 2 | Under construction | |||||||
Gér... | 10,000 | 5 | Operational | ||||||
Gle... | 29,700 | 9 | Operational | ||||||
Goa... | 4 | Operational | |||||||
Gol... | 30,000 | 3 | Under construction | ||||||
Gom... | 275 | 1 | Operational | ||||||
Gor... | 16,100 | 7 | Operational | ||||||
Gou... | 5,600 | 7 | Operational | ||||||
Gou... | 16,800 | 7 | Operational | ||||||
Gou... | 6,000 | 8 | Dismantled | ||||||
Gou... | 6,400 | 8 | Operational | ||||||
Gra... | 12,000 | 4 | Operational | ||||||
Gra... | 1,375 | 5 | Operational | ||||||
Gra... | 12,000 | 6 | Operational | ||||||
Gra... | 4,000 | 2 | Operational | ||||||
Gra... | 8,000 | 4 | Operational | ||||||
Gra... | 2,000 | 2 | Operational | ||||||
Gra... | 14,000 | 7 | Operational | ||||||
Gra... | 17,600 | 8 | Operational | ||||||
Gra... | 4,400 | 2 | Operational | ||||||
Gra... | 8,800 | 4 | Operational | ||||||
Gra... | 6 | Operational | |||||||
Gra... | 6,150 | 3 | Operational | ||||||
Gra... | 9,000 | 3 | Operational | ||||||
Gra... | 11,750 | 5 | Operational | ||||||
Gre... | 24,000 | 8 | Operational | ||||||
Gre... | 1,000 | 1 | Operational | ||||||
Gro... | 9,200 | 4 | Operational | ||||||
Gru... | 30,000 | Under construction | |||||||
Gué... | 10,250 | 5 | Operational | ||||||
Gué... | 3,000 | 3 | Operational | ||||||
Gue... | 9,000 | 6 | Operational | ||||||
Gue... | 4,800 | 6 | Operational | ||||||
Gue... | 4,250 | 5 | Operational | ||||||
Gue... | 11,500 | 5 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Gue... | 7,500 | 3 | Operational | ||||||
Gui... | 14,400 | 4 | Operational | ||||||
Gui... | 3,300 | 1 | Operational | ||||||
Gur... | 3,000 | 1 | Operational | ||||||
Gur... | 3,000 | 1 | Operational | ||||||
Hai... | 8,800 | 4 | Operational | ||||||
Ham... | 8,200 | 4 | Operational | ||||||
Ham... | 1,700 | 2 | Operational | ||||||
Ham... | 8,000 | 4 | Operational | ||||||
Han... | 20,500 | 10 | Operational | ||||||
Har... | 9,200 | 4 | Operational | ||||||
Har... | 4,000 | 2 | Operational | ||||||
Har... | 12,000 | 6 | Operational | ||||||
Har... | 10,000 | 4 | Operational | ||||||
Har... | 10,000 | 4 | Operational | ||||||
Hau... | 10,400 | 8 | Operational | ||||||
Hau... | 10,400 | 8 | Operational | ||||||
Hau... | 20,000 | 10 | Operational | ||||||
Hau... | 12,000 | 6 | Operational | ||||||
Hau... | 4,000 | 2 | Operational | ||||||
Hau... | 12,000 | 6 | Operational | ||||||
Hau... | 6,400 | 8 | Operational | ||||||
Hau... | 15,000 | 5 | Operational | ||||||
Hau... | 10,400 | 8 | Operational | ||||||
Hau... | 7,800 | 6 | Operational | ||||||
Hau... | 11,700 | 9 | Operational | ||||||
Hau... | 31,050 | 9 | Operational | ||||||
Hau... | 27,500 | 11 | Operational | ||||||
Hau... | 6,000 | 3 | Operational | ||||||
Hau... | 12,000 | 6 | Operational | ||||||
Hau... | 12,000 | 6 | Operational | ||||||
Hau... | 11,400 | 3 | Operational | ||||||
Hau... | 13,200 | 6 | Operational | ||||||
Hau... | 24,000 | 12 | Operational | ||||||
Hau... | 9,000 | 6 | Operational | ||||||
Hau... | 9,000 | 6 | Operational | ||||||
Hau... | 7,500 | 5 | Operational | ||||||
Hau... | 12,000 | 8 | Operational | ||||||
Hau... | 18,400 | 8 | Operational | ||||||
Hau... | 25,000 | 10 | Operational | ||||||
Hau... | 20,700 | 6 | Operational | ||||||
Hau... | 25,600 | 8 | Operational | ||||||
Hau... | 10,000 | 4 | Dismantled | ||||||
Hau... | 8,800 | 4 | Under construction | ||||||
Hay... | 4,400 | 2 | Operational | ||||||
Hay... | 2,200 | 1 | Operational | ||||||
Hel... | 21,000 | 5 | Operational | ||||||
Hen... | 14,400 | 18 | Operational | ||||||
Her... | 6,900 | 2 | Operational | ||||||
Her... | 6,900 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Her... | 24,000 | 12 | Operational | ||||||
Her... | 22,000 | 11 | Operational | ||||||
Her... | 10,000 | 5 | Operational | ||||||
Her... | 11,500 | 5 | Operational | ||||||
Hes... | 5,000 | 5 | Operational | ||||||
Hét... | 11,500 | 5 | Operational | ||||||
Hét... | 12,500 | 5 | Operational | ||||||
Hom... | 10,000 | 5 | Operational | ||||||
Hom... | 8,000 | 4 | Operational | ||||||
Hom... | 9,600 | 4 | Operational | ||||||
Hou... | 13,800 | 4 | Operational | ||||||
Hyr... | 12,000 | 5 | Operational | ||||||
Ide... | 500,000 | Planned | |||||||
Ids... | 15,000 | 5 | Operational | ||||||
Ids... | 3,000 | 1 | Operational | ||||||
Iff... | 2,000 | 1 | Operational | ||||||
Ile... | 275 | 1 | Operational | ||||||
Ile... | 275 | 1 | Operational | ||||||
Ill... | 9,000 | 3 | Operational | ||||||
Ill... | 13,200 | 6 | Operational | ||||||
Imb... | 9,600 | 4 | Operational | ||||||
Is-... | 12,000 | 6 | Operational | ||||||
Jal... | 9,200 | 4 | Operational | ||||||
Jan... | 13,200 | 6 | Operational | ||||||
Jan... | 11,500 | 5 | Operational | ||||||
Jan... | 11,500 | 5 | Operational | ||||||
Jan... | 11,500 | 5 | Dismantled | ||||||
Jan... | 11,000 | 5 | Under construction | ||||||
Jas... | 13,200 | 6 | Operational | ||||||
Jon... | 11,900 | 14 | Operational | ||||||
Jon... | 6,300 | 7 | Operational | ||||||
Jou... | 44,000 | 22 | Operational | ||||||
Jou... | 6,900 | 3 | Operational | ||||||
Jou... | 12,500 | 5 | Operational | ||||||
Kaf... | 5,500 | 20 | Operational | ||||||
Kaf... | 6,050 | 22 | Operational | ||||||
Ker... | 12,000 | 4 | Under construction | ||||||
Ker... | 10,000 | 5 | Operational | ||||||
Ker... | 9,100 | 7 | Operational | ||||||
Ker... | 9,200 | 4 | Operational | ||||||
Ker... | 6,000 | 3 | Operational | ||||||
Ker... | 850 | 1 | Dismantled | ||||||
Ker... | 6,000 | 3 | Dismantled | ||||||
Ker... | 850 | 1 | Dismantled | ||||||
Ker... | 4,000 | 2 | Dismantled | ||||||
Ker... | 8,000 | 4 | Dismantled | ||||||
Ker... | 29,400 | 7 | Under construction | ||||||
Ker... | 2,300 | 1 | Operational | ||||||
Ker... | 4,000 | 2 | Operational | ||||||
Ker... | 12,000 | 8 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Ker... | 5,600 | 7 | Operational | ||||||
La ... | 13,200 | 6 | Operational | ||||||
La ... | 4,000 | 4 | Operational | ||||||
La ... | 11,000 | 5 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 15,000 | 5 | Operational | ||||||
La ... | 13,800 | 6 | Operational | ||||||
La ... | 8,000 | 4 | Operational | ||||||
La ... | 2,000 | 1 | Dismantled | ||||||
La ... | 11,000 | 5 | Operational | ||||||
La ... | 16,400 | 8 | Operational | ||||||
La ... | 14,350 | 7 | Operational | ||||||
La ... | 16,400 | 8 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 22,110 | 7 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 20,700 | 6 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 10,000 | 5 | Operational | ||||||
La ... | 12,000 | 4 | Operational | ||||||
La ... | 8,800 | 4 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 12,300 | 6 | Operational | ||||||
La ... | 6,000 | 3 | Operational | ||||||
La ... | 6,000 | 3 | Operational | ||||||
La ... | 6,000 | 3 | Operational | ||||||
La ... | 10,000 | 5 | Operational | ||||||
La ... | 4,000 | 2 | Operational | ||||||
La ... | 19,800 | 6 | Operational | ||||||
La ... | 10,000 | 4 | Operational | ||||||
La ... | 10,000 | 4 | Operational | ||||||
La ... | 11,000 | 4 | Dismantled | ||||||
La ... | Dismantled | ||||||||
La ... | 12,000 | 4 | Operational | ||||||
La ... | 49,500 | 15 | Operational | ||||||
La ... | 12,000 | 5 | Operational | ||||||
La ... | 5,000 | 2 | Operational | ||||||
La ... | 20,500 | 10 | Operational | ||||||
La ... | 16,500 | 5 | Operational | ||||||
La ... | 29,900 | 13 | Operational | ||||||
La ... | 6,680 | 4 | Operational | ||||||
La ... | 12,000 | 4 | Operational | ||||||
La ... | 12,000 | 4 | Operational | ||||||
La ... | 8,000 | 4 | Operational | ||||||
La ... | 9,200 | 4 | Operational | ||||||
La ... | 11,500 | 5 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 20,000 | 8 | Operational | ||||||
La ... | 16,800 | 4 | Under construction | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
La ... | 28,000 | 14 | Operational | ||||||
La ... | 12,500 | 5 | Operational | ||||||
La ... | 8,800 | 4 | Operational | ||||||
La ... | 8,000 | 4 | Operational | ||||||
La ... | 8,800 | 4 | Operational | ||||||
La ... | 9,200 | 4 | Operational | ||||||
La ... | 22,000 | 11 | Operational | ||||||
La ... | 4,000 | 2 | Operational | ||||||
La ... | 10,000 | 5 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 9,000 | 3 | Operational | ||||||
La ... | 21,000 | 7 | Operational | ||||||
La ... | 13,200 | 4 | Operational | ||||||
La ... | 4,000 | 2 | Operational | ||||||
La ... | 8,000 | 4 | Operational | ||||||
La ... | 7,050 | 3 | Operational | ||||||
La ... | 10,800 | 3 | Operational | ||||||
La ... | 15,000 | 5 | Operational | ||||||
La ... | 12,500 | 5 | Operational | ||||||
La ... | 20,340 | 7 | Under construction | ||||||
La ... | 6,600 | 3 | Under construction | ||||||
La ... | 12,000 | 4 | Operational | ||||||
La ... | 9,200 | 4 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 9,350 | 11 | Operational | ||||||
La ... | 9,200 | 4 | Operational | ||||||
La ... | 6,150 | 3 | Operational | ||||||
La ... | 8,000 | 4 | Operational | ||||||
La ... | 6,000 | 3 | Operational | ||||||
La ... | 3,025 | 11 | Operational | ||||||
La ... | 12,000 | 4 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 10,250 | 5 | Operational | ||||||
La ... | 9,600 | 12 | Operational | ||||||
La ... | 4,800 | 6 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 18,800 | 8 | Operational | ||||||
La ... | 30,550 | 13 | Operational | ||||||
La ... | 24,000 | 8 | Operational | ||||||
La ... | 9,000 | 6 | Dismantled | ||||||
La ... | 9,000 | 6 | Dismantled | ||||||
La ... | 4,600 | 2 | Dismantled | ||||||
La ... | 9,000 | 3 | Operational | ||||||
La ... | 32,900 | 14 | Operational | ||||||
La ... | 3 | Under construction | |||||||
La ... | 10,250 | 5 | Operational | ||||||
La ... | 6,000 | 2 | Operational | ||||||
La ... | 18,000 | 6 | Operational | ||||||
La ... | 9,200 | 4 | Operational | ||||||
La ... | 6,000 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
La ... | 4,000 | 2 | Operational | ||||||
La ... | 13,200 | 6 | Operational | ||||||
La ... | 14,100 | 6 | Operational | ||||||
La ... | 4,250 | 5 | Operational | ||||||
La ... | 10,000 | 5 | Operational | ||||||
La ... | 22,000 | 11 | Operational | ||||||
La ... | 8,000 | 4 | Operational | ||||||
La ... | 9,200 | 4 | Operational | ||||||
La ... | 16,450 | 7 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 12,300 | 6 | Operational | ||||||
La ... | 2,300 | 1 | Operational | ||||||
La ... | 2,300 | 1 | Operational | ||||||
La ... | 3,600 | 4 | Operational | ||||||
La ... | 28,800 | 9 | Operational | ||||||
La ... | 16,100 | 7 | Operational | ||||||
La ... | 8,000 | 10 | Operational | ||||||
La ... | 11,500 | 5 | Operational | ||||||
La ... | 8,000 | 4 | Operational | ||||||
La ... | 12,300 | 6 | Operational | ||||||
La ... | 8,000 | 4 | Operational | ||||||
La ... | 4,000 | 2 | Operational | ||||||
La ... | 12,000 | 6 | Operational | ||||||
La ... | 14,000 | 7 | Operational | ||||||
La ... | 12,500 | 5 | Operational | ||||||
La ... | 32,000 | 16 | Operational | ||||||
La ... | 12,000 | 4 | Operational | ||||||
La ... | 8,000 | 4 | Operational | ||||||
La ... | 22,000 | 11 | Operational | ||||||
La ... | 4,000 | 2 | Operational | ||||||
La ... | 18,000 | 6 | Operational | ||||||
La ... | 8,000 | 4 | Operational | ||||||
Lab... | 900 | 1 | Operational | ||||||
Lac... | 25,000 | 11 | Operational | ||||||
Lag... | 100 | 1 | Operational | ||||||
Lam... | 9,200 | 4 | Operational | ||||||
Lam... | 4,700 | 2 | Operational | ||||||
Lam... | 16,000 | 5 | Operational | ||||||
Lan... | 11,500 | 5 | Operational | ||||||
Lan... | 7,000 | 2 | Operational | ||||||
Lan... | 33,000 | 11 | Operational | ||||||
Lan... | 5,600 | 7 | Operational | ||||||
Lan... | 6 | Under construction | |||||||
Lan... | 10,000 | 5 | Operational | ||||||
Lan... | 7,500 | 5 | Dismantled | ||||||
Lan... | 12,000 | 6 | Operational | ||||||
Lan... | 1,800 | 2 | Operational | ||||||
Lan... | 53,300 | 26 | Operational | ||||||
Lan... | 8 | Under construction | |||||||
Lan... | 6,600 | 3 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Lan... | 4,000 | 5 | Operational | ||||||
Lan... | 8,200 | 4 | Operational | ||||||
Lan... | 2,600 | 2 | Operational | ||||||
Lan... | 2,550 | 3 | Operational | ||||||
Lar... | 9,200 | 4 | Operational | ||||||
Las... | 1,700 | 2 | Operational | ||||||
Las... | 6,900 | 3 | Operational | ||||||
Las... | 2,700 | 3 | Operational | ||||||
Lau... | 10,000 | 4 | Operational | ||||||
Lau... | 22,500 | 9 | Operational | ||||||
Lau... | 12,000 | 4 | Operational | ||||||
Lau... | 10,000 | 5 | Operational | ||||||
Lav... | 15,400 | 7 | Operational | ||||||
Laz... | 14,400 | 6 | Operational | ||||||
Le ... | 15,000 | 5 | Operational | ||||||
Le ... | 7,660 | 2 | Operational | ||||||
Le ... | 12,000 | 6 | Operational | ||||||
Le ... | 3,000 | 1 | Operational | ||||||
Le ... | 10,000 | 5 | Operational | ||||||
Le ... | 6,000 | 3 | Operational | ||||||
Le ... | 12,000 | 4 | Operational | ||||||
Le ... | 14,000 | Under construction | |||||||
Le ... | 28,800 | 8 | Operational | ||||||
Le ... | 12,000 | 6 | Operational | ||||||
Le ... | 11,750 | 5 | Operational | ||||||
Le ... | 8,000 | 4 | Operational | ||||||
Le ... | 6,000 | 1 | Dismantled | ||||||
Le ... | 10,000 | 4 | Operational | ||||||
Le ... | 16,000 | 8 | Operational | ||||||
Le ... | 11,750 | 5 | Operational | ||||||
Le ... | 4,700 | 2 | Operational | ||||||
Le ... | 6,400 | 8 | Operational | ||||||
Le ... | 6,900 | 3 | Operational | ||||||
Le ... | 10,000 | 5 | Operational | ||||||
Le ... | 17,100 | 6 | Operational | ||||||
Le ... | 18,000 | 6 | Operational | ||||||
Le ... | 16,100 | 7 | Operational | ||||||
Le ... | 32,200 | 14 | Operational | ||||||
Le ... | 6,150 | 3 | Operational | ||||||
Le ... | 4,100 | 2 | Operational | ||||||
Le ... | 12,300 | 6 | Operational | ||||||
Le ... | 8,200 | 4 | Operational | ||||||
Le ... | 12,000 | 6 | Operational | ||||||
Le ... | 21,150 | 9 | Operational | ||||||
Le ... | 10,000 | 5 | Operational | ||||||
Le ... | 9,900 | 3 | Operational | ||||||
Le ... | 8,800 | 4 | Operational | ||||||
Le ... | 10,000 | 4 | Operational | ||||||
Le ... | 12,000 | 4 | Operational | ||||||
Le ... | 10,400 | 8 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Le ... | 10,000 | 5 | Operational | ||||||
Le ... | 7,200 | 2 | Operational | ||||||
Le ... | 10,000 | 5 | Operational | ||||||
Le ... | 6,000 | 3 | Operational | ||||||
Le ... | 9,000 | 6 | Operational | ||||||
Le ... | 10,000 | 5 | Operational | ||||||
Le ... | 12,000 | 6 | Operational | ||||||
Le ... | 10,000 | 5 | Operational | ||||||
Le ... | 12,000 | 6 | Operational | ||||||
Le ... | 13,800 | 6 | Operational | ||||||
Le ... | 8,000 | 4 | Operational | ||||||
Le ... | 8,000 | 4 | Operational | ||||||
Le ... | 20,000 | 5 | Operational | ||||||
Le ... | 9,400 | 4 | Operational | ||||||
Le ... | 11,000 | 5 | Operational | ||||||
Le ... | 18,000 | 6 | Operational | ||||||
Le ... | 8,000 | 4 | Operational | ||||||
Le ... | 18,000 | 6 | Operational | ||||||
Le ... | 6,150 | 3 | Operational | ||||||
Le ... | 4,100 | 2 | Operational | ||||||
Le ... | 9,400 | 4 | Operational | ||||||
Le ... | 9,200 | 4 | Operational | ||||||
Le ... | 8,000 | 4 | Operational | ||||||
Le ... | 16,000 | 8 | Operational | ||||||
Le ... | 18,000 | 6 | Operational | ||||||
Le ... | 10,800 | 3 | Operational | ||||||
Le ... | 15,000 | 5 | Operational | ||||||
Le ... | 8,000 | 4 | Operational | ||||||
Le ... | 11,500 | 5 | Operational | ||||||
Le ... | 8,000 | 4 | Operational | ||||||
Le ... | 9,900 | 3 | Operational | ||||||
Le ... | 9,225 | 3 | Operational | ||||||
Le ... | 51,000 | 17 | Operational | ||||||
Le ... | 6,900 | 2 | Operational | ||||||
Le ... | 12,000 | 6 | Operational | ||||||
Le ... | 6,600 | 3 | Operational | ||||||
Le ... | 8,000 | 4 | Operational | ||||||
Le ... | 12,300 | 6 | Operational | ||||||
Le ... | 11,750 | 5 | Operational | ||||||
Le ... | 11,750 | 5 | Operational | ||||||
Le ... | 11,500 | 5 | Operational | ||||||
Le ... | 12,000 | 6 | Operational | ||||||
Le ... | 14,000 | 7 | Operational | ||||||
Le ... | 12,000 | 6 | Operational | ||||||
Le ... | 10,000 | 5 | Operational | ||||||
Le ... | 12,300 | 6 | Operational | ||||||
Le ... | 4,000 | 5 | Operational | ||||||
Le ... | 3,000 | 4 | Dismantled | ||||||
Le ... | 3,800 | 1 | Under construction | ||||||
Le ... | 4,600 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Le ... | 4,000 | 2 | Operational | ||||||
Le ... | 8,400 | 2 | Operational | ||||||
Le ... | 29,700 | 9 | Operational | ||||||
Le ... | 18,000 | 9 | Operational | ||||||
Le ... | 18,000 | 5 | Operational | ||||||
Le ... | 3,300 | 1 | Operational | ||||||
Le ... | 6,400 | 4 | Operational | ||||||
Le ... | 8,000 | 4 | Operational | ||||||
Le ... | 11,500 | 5 | Operational | ||||||
Le ... | 24,150 | 7 | Operational | ||||||
Le ... | 8,000 | 4 | Operational | ||||||
Le ... | 496,000 | 62 | Approved | ||||||
Le ... | 27,600 | 12 | Operational | ||||||
Le ... | 19,200 | 8 | Operational | ||||||
Le ... | 12,000 | 4 | Operational | ||||||
Le ... | 12,000 | 4 | Operational | ||||||
Le ... | 6,000 | 2 | Operational | ||||||
Le ... | 12,300 | 6 | Operational | ||||||
Le ... | 17,325 | 5 | Operational | ||||||
Lef... | 900 | 1 | Operational | ||||||
Lei... | 8,000 | 4 | Operational | ||||||
Lei... | 14,000 | 7 | Operational | ||||||
Les... | 20,000 | 10 | Operational | ||||||
Les... | 16,800 | 7 | Operational | ||||||
Les... | 6,000 | 2 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 7,050 | 3 | Operational | ||||||
Les... | 7,050 | 3 | Operational | ||||||
Les... | 16,000 | 8 | Operational | ||||||
Les... | 9,000 | 3 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 13,200 | 4 | Operational | ||||||
Les... | 12,500 | 5 | Operational | ||||||
Les... | 3,200 | 4 | Operational | ||||||
Les... | 12,000 | 6 | Operational | ||||||
Les... | 22,000 | 11 | Operational | ||||||
Les... | 19,800 | 9 | Operational | ||||||
Les... | 15,000 | 5 | Operational | ||||||
Les... | 24,150 | 7 | Operational | ||||||
Les... | 7,200 | 3 | Operational | ||||||
Les... | 11,500 | 5 | Operational | ||||||
Les... | 12,000 | 4 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 14,000 | 7 | Operational | ||||||
Les... | 11,500 | 5 | Operational | ||||||
Les... | 8,200 | 4 | Operational | ||||||
Les... | 12,000 | 4 | Under construction | ||||||
Les... | 37,950 | 11 | Operational | ||||||
Les... | 10,000 | 4 | Operational | ||||||
Les... | 10,000 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Les... | 6,000 | 3 | Operational | ||||||
Les... | 12,500 | 5 | Operational | ||||||
Les... | 1,000 | 1 | Operational | ||||||
Les... | 50,400 | 14 | Operational | ||||||
Les... | 21,500 | 5 | Operational | ||||||
Les... | 12,900 | 3 | Operational | ||||||
Les... | 12,000 | 8 | Operational | ||||||
Les... | 4,400 | 2 | Operational | ||||||
Les... | 13,800 | 6 | Operational | ||||||
Les... | 7,050 | 3 | Operational | ||||||
Les... | 9,200 | 4 | Operational | ||||||
Les... | 9,200 | 4 | Operational | ||||||
Les... | 38,400 | 12 | Operational | ||||||
Les... | 12,300 | 6 | Operational | ||||||
Les... | 9,000 | 3 | Operational | ||||||
Les... | 6,900 | 3 | Operational | ||||||
Les... | 6,900 | 3 | Operational | ||||||
Les... | 18,000 | 6 | Operational | ||||||
Les... | 14,400 | 6 | Operational | ||||||
Les... | 22,550 | 11 | Operational | ||||||
Les... | 30,750 | 15 | Operational | ||||||
Les... | 26,650 | 13 | Operational | ||||||
Les... | 24,000 | 12 | Operational | ||||||
Les... | 6,900 | 3 | Operational | ||||||
Les... | 11,500 | 5 | Operational | ||||||
Les... | 10,000 | 4 | Operational | ||||||
Les... | 6,600 | 3 | Operational | ||||||
Les... | 20,400 | 6 | Operational | ||||||
Les... | 18,000 | 6 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 8,000 | 4 | Operational | ||||||
Les... | 20,000 | 10 | Operational | ||||||
Les... | 9,200 | 4 | Operational | ||||||
Les... | 45,045 | 13 | Operational | ||||||
Les... | 400 | 2 | Dismantled | ||||||
Les... | 7,200 | 2 | Operational | ||||||
Les... | 11,500 | 5 | Operational | ||||||
Les... | 12,000 | 5 | Operational | ||||||
Les... | 6,600 | 3 | Operational | ||||||
Les... | 13,800 | 6 | Operational | ||||||
Les... | 13,200 | 6 | Operational | ||||||
Les... | 12,500 | 5 | Operational | ||||||
Les... | 12,000 | 6 | Operational | ||||||
Les... | 10,000 | 4 | Operational | ||||||
Les... | 9,600 | 3 | Operational | ||||||
Les... | 19,200 | 6 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 12,000 | 6 | Operational | ||||||
Les... | 8,200 | 4 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Les... | 10,000 | 4 | Operational | ||||||
Les... | 17,325 | 5 | Operational | ||||||
Les... | 8,000 | 4 | Operational | ||||||
Les... | 17,000 | 6 | Under construction | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 44,000 | 11 | Operational | ||||||
Les... | 8,800 | 4 | Operational | ||||||
Les... | 6,000 | 2 | Operational | ||||||
Les... | 11,500 | 5 | Dismantled | ||||||
Les... | 10,000 | 5 | Dismantled | ||||||
Les... | 26,400 | 11 | Operational | ||||||
Les... | 2,300 | 1 | Operational | ||||||
Les... | 13,200 | 6 | Operational | ||||||
Les... | 11,000 | 5 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 12,300 | 6 | Operational | ||||||
Les... | 33,600 | 8 | Operational | ||||||
Les... | 12,300 | 6 | Operational | ||||||
Les... | 12,000 | 6 | Operational | ||||||
Les... | 6,900 | 3 | Operational | ||||||
Les... | 25,200 | 7 | Operational | ||||||
Les... | 12,000 | 6 | Operational | ||||||
Les... | 12,000 | 4 | Operational | ||||||
Les... | 25,200 | 7 | Operational | ||||||
Les... | 12,000 | 4 | Operational | ||||||
Les... | 2,000 | 1 | Operational | ||||||
Les... | 6,000 | 3 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 15,000 | 5 | Operational | ||||||
Les... | 18,000 | 9 | Operational | ||||||
Les... | 27,000 | 9 | Operational | ||||||
Les... | 9,000 | 3 | Operational | ||||||
Les... | 17,600 | 8 | Operational | ||||||
Les... | 12,500 | 5 | Operational | ||||||
Les... | 29,400 | 7 | Operational | ||||||
Les... | 15,000 | 6 | Operational | ||||||
Les... | 9,000 | 3 | Operational | ||||||
Les... | 12,000 | 4 | Operational | ||||||
Les... | 3,300 | 1 | Operational | ||||||
Les... | 12,000 | 4 | Operational | ||||||
Les... | 21,600 | 9 | Operational | ||||||
Les... | 8,200 | 4 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 6 | Operational | |||||||
Les... | 2,300 | 1 | Operational | ||||||
Les... | 4,600 | 2 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 11,500 | 5 | Operational | ||||||
Les... | 6,600 | 3 | Operational | ||||||
Les... | 12,000 | 6 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Les... | 12,500 | 5 | Operational | ||||||
Les... | 10,000 | 5 | Operational | ||||||
Les... | 10,800 | 3 | Operational | ||||||
Les... | 15,400 | 7 | Operational | ||||||
Les... | 12,500 | 5 | Operational | ||||||
Les... | 9,200 | 4 | Operational | ||||||
Les... | 2,300 | 1 | Operational | ||||||
Les... | 6,900 | 3 | Operational | ||||||
Les... | 8,000 | 4 | Operational | ||||||
Les... | 6,000 | 3 | Operational | ||||||
Les... | 11,500 | 5 | Operational | ||||||
Les... | 15,400 | 7 | Under construction | ||||||
Leu... | 3,000 | 1 | Operational | ||||||
Leu... | 9,000 | 3 | Operational | ||||||
Lev... | 60,000 | 20 | Operational | ||||||
Lev... | 12,000 | 4 | Operational | ||||||
Lev... | 6,000 | 2 | Operational | ||||||
Lev... | 9,000 | 3 | Operational | ||||||
Lév... | 2,000 | 1 | Operational | ||||||
Lév... | 8,200 | 4 | Operational | ||||||
Lic... | 12,000 | 6 | Operational | ||||||
Lid... | 12,300 | 6 | Operational | ||||||
Lid... | 13,200 | 6 | Operational | ||||||
Lié... | 21,600 | 6 | Operational | ||||||
Lié... | 7,200 | 2 | Operational | ||||||
Lié... | 7,200 | 2 | Operational | ||||||
Lie... | 132 | 1 | Operational | ||||||
Lih... | 11,500 | 5 | Operational | ||||||
Lih... | 10,000 | 4 | Operational | ||||||
Lim... | 11,000 | 5 | Operational | ||||||
Lin... | 11,000 | 5 | Operational | ||||||
Lio... | 7,875 | 3 | Operational | ||||||
Lis... | 6,000 | 2 | Operational | ||||||
Lis... | 6,600 | 3 | Operational | ||||||
Lis... | 4,400 | 2 | Operational | ||||||
Lis... | 10,000 | 5 | Operational | ||||||
Lis... | 850 | 1 | Operational | ||||||
Lis... | 10,000 | 5 | Operational | ||||||
Lis... | 850 | 1 | Operational | ||||||
Lom... | 20,000 | 10 | Operational | ||||||
Lom... | 10,000 | 5 | Operational | ||||||
Lom... | 13,750 | 5 | Operational | ||||||
Lom... | 19,200 | 6 | Operational | ||||||
Lom... | 19,200 | 6 | Operational | ||||||
Lon... | 8,350 | 5 | Operational | ||||||
Lon... | 10,000 | 4 | Operational | ||||||
Lon... | 9,000 | 3 | Operational | ||||||
Lon... | 12,500 | 5 | Operational | ||||||
Lon... | 10,000 | 5 | Operational | ||||||
Lon... | 12,000 | 4 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Lon... | 11,500 | 5 | Operational | ||||||
Lon... | 2,300 | 1 | Operational | ||||||
Lou... | 12,000 | 6 | Operational | ||||||
Lou... | 2,000 | 1 | Operational | ||||||
Lou... | 11,000 | 5 | Operational | ||||||
Lou... | 11,000 | 5 | Operational | ||||||
Lou... | 17,250 | 5 | Operational | ||||||
Lou... | 3,450 | 1 | Operational | ||||||
Lou... | Dismantled | ||||||||
Lou... | 12,000 | 6 | Dismantled | ||||||
Lou... | 14,400 | 6 | Operational | ||||||
Lou... | 12,000 | 6 | Operational | ||||||
Lou... | 14,400 | 6 | Operational | ||||||
Luc... | 12,000 | 6 | Operational | ||||||
Luc... | 23,400 | 6 | Operational | ||||||
Luc... | 7,200 | 2 | Operational | ||||||
Luc... | 10,000 | 5 | Operational | ||||||
Lus... | 8,000 | 4 | Operational | ||||||
Lus... | 6,000 | 3 | Operational | ||||||
Lus... | 330 | 1 | Operational | ||||||
Lus... | 18,000 | 6 | Operational | ||||||
Lys... | 18,000 | 6 | Operational | ||||||
L’A... | 9,900 | 3 | Operational | ||||||
L’E... | 12,300 | 6 | Operational | ||||||
L’E... | 10,000 | 5 | Operational | ||||||
L’E... | 18,000 | 9 | Operational | ||||||
L’E... | 9,000 | 3 | Operational | ||||||
L’E... | 4,000 | 1 | Operational | ||||||
L’H... | 8,000 | 4 | Operational | ||||||
L’H... | 4,000 | 2 | Operational | ||||||
L’H... | 12,000 | 6 | Operational | ||||||
L’O... | 2,300 | 1 | Operational | ||||||
L’O... | 14,000 | 7 | Operational | ||||||
L’O... | 8,200 | 4 | Operational | ||||||
Mac... | 32,000 | 16 | Operational | ||||||
Mac... | 6,900 | 2 | Operational | ||||||
Mac... | 10,350 | 3 | Operational | ||||||
Mad... | 39,600 | 18 | Operational | ||||||
Mag... | 13,800 | 4 | Under construction | ||||||
Mag... | 6,000 | 3 | Operational | ||||||
Mag... | 15,000 | 6 | Operational | ||||||
Mai... | 12,000 | 6 | Operational | ||||||
Mai... | 12,000 | 6 | Operational | ||||||
Mai... | 3,000 | 1 | Operational | ||||||
Mai... | 15,000 | 5 | Operational | ||||||
Mai... | 12,000 | 4 | Operational | ||||||
Mai... | 6,000 | 2 | Operational | ||||||
Mai... | 6,000 | 2 | Operational | ||||||
Mai... | 6,000 | 2 | Operational | ||||||
Mai... | 6,000 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Mai... | 4,000 | 2 | Operational | ||||||
Mai... | 16,500 | 5 | Operational | ||||||
Mal... | 12,000 | 5 | Operational | ||||||
Mal... | 6,000 | 3 | Operational | ||||||
Mal... | Dismantled | ||||||||
Man... | 4,100 | 2 | Operational | ||||||
Man... | 4,400 | 2 | Operational | ||||||
Man... | 13,800 | 6 | Operational | ||||||
Mar... | 10,800 | 6 | Operational | ||||||
Mar... | 10,800 | 6 | Operational | ||||||
Mar... | 13,200 | 6 | Operational | ||||||
Mar... | 13,200 | 6 | Operational | ||||||
Mar... | 3,000 | 1 | Dismantled | ||||||
Mar... | 5,000 | 2 | Dismantled | ||||||
Mar... | 2,000 | 1 | Dismantled | ||||||
Mar... | 2,000 | 1 | Dismantled | ||||||
Mar... | 17,600 | 8 | Operational | ||||||
Mar... | 8,000 | 4 | Operational | ||||||
Mar... | 8,000 | 4 | Operational | ||||||
Mar... | 12,000 | 6 | Operational | ||||||
Mar... | 17,250 | 5 | Operational | ||||||
Mar... | 14,400 | 4 | Operational | ||||||
Mar... | 11,000 | 5 | Operational | ||||||
Mas... | 7,200 | 9 | Operational | ||||||
Mas... | 23,100 | 7 | Operational | ||||||
Mau... | 10,000 | 5 | Operational | ||||||
Mau... | 7,050 | 3 | Operational | ||||||
Max... | 6,000 | 3 | Operational | ||||||
Maz... | 12,500 | 5 | Operational | ||||||
Maz... | 12,800 | 4 | Operational | ||||||
Méa... | 8,000 | 4 | Operational | ||||||
Méc... | 9,600 | 2 | Under construction | ||||||
Méh... | 6,000 | 2 | Operational | ||||||
Mél... | 32,200 | 14 | Operational | ||||||
Mél... | 8,000 | 4 | Operational | ||||||
Mel... | 21,350 | 7 | Operational | ||||||
Mém... | 4,400 | 2 | Operational | ||||||
Mém... | 4,400 | 2 | Operational | ||||||
Mén... | 5,600 | 7 | Operational | ||||||
Men... | 1,200 | 4 | Operational | ||||||
Mén... | 10,500 | 7 | Operational | ||||||
Mén... | 15,000 | 5 | Operational | ||||||
Mén... | 6,600 | 2 | Operational | ||||||
Mén... | 10,350 | 3 | Operational | ||||||
Mer... | 7,800 | 6 | Operational | ||||||
Mer... | 6,400 | 8 | Operational | ||||||
Més... | 9,200 | 4 | Operational | ||||||
Més... | 9,200 | 4 | Operational | ||||||
Mes... | 12,300 | 6 | Operational | ||||||
Met... | 34,500 | 10 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Méz... | 10,000 | 4 | Operational | ||||||
Mig... | 8,200 | 4 | Operational | ||||||
Mig... | 6,150 | 3 | Operational | ||||||
Min... | 11,500 | 5 | Operational | ||||||
Moe... | 16,500 | 5 | Operational | ||||||
Moh... | 20,000 | 10 | Operational | ||||||
Moi... | 11,000 | 5 | Operational | ||||||
Mol... | 10,000 | 5 | Operational | ||||||
Mom... | 11,500 | 5 | Operational | ||||||
Mon... | 6,000 | 3 | Operational | ||||||
Mon... | 16,000 | 8 | Operational | ||||||
Mon... | 6,000 | 3 | Operational | ||||||
Mon... | 10,000 | 5 | Operational | ||||||
Mon... | 6,000 | 3 | Operational | ||||||
Mon... | 14,000 | 7 | Operational | ||||||
Mon... | 10,000 | 5 | Operational | ||||||
Mon... | 6,000 | 3 | Operational | ||||||
Mon... | 6,000 | 3 | Operational | ||||||
Mon... | 6,000 | 3 | Operational | ||||||
Mon... | 12,000 | 6 | Operational | ||||||
Mon... | 27,600 | 8 | Operational | ||||||
Mon... | 14,350 | 7 | Operational | ||||||
Mon... | 6,150 | 3 | Operational | ||||||
Mon... | 10,250 | 5 | Operational | ||||||
Mon... | 4,100 | 2 | Operational | ||||||
Mon... | 14,100 | 6 | Operational | ||||||
Mon... | 13,200 | 4 | Operational | ||||||
Mon... | 9,600 | 3 | Operational | ||||||
Mon... | 3,200 | 1 | Operational | ||||||
Mon... | 22,400 | 7 | Operational | ||||||
Mon... | 26,000 | 10 | Operational | ||||||
Mon... | 31,050 | 9 | Operational | ||||||
Mon... | 11,400 | 3 | Operational | ||||||
Mon... | 7,050 | 3 | Operational | ||||||
Mon... | 7,500 | 3 | Operational | ||||||
Mon... | 5,000 | 2 | Operational | ||||||
Mon... | 7,500 | 3 | Operational | ||||||
Mon... | 7,500 | 3 | Operational | ||||||
Mon... | 7,500 | 3 | Operational | ||||||
Mon... | 9,200 | 4 | Operational | ||||||
Mon... | 11,500 | 5 | Operational | ||||||
Mon... | 12,500 | 5 | Operational | ||||||
Mon... | 2,050 | 1 | Operational | ||||||
Mon... | 24,150 | 7 | Operational | ||||||
Mon... | 13,800 | 4 | Operational | ||||||
Mon... | 3,200 | 1 | Operational | ||||||
Mon... | 24,000 | 12 | Operational | ||||||
Mon... | 24,000 | 12 | Operational | ||||||
Mon... | 8,000 | 4 | Operational | ||||||
Mon... | 16,500 | 5 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Mon... | 9,000 | 6 | Operational | ||||||
Mon... | 12,000 | 6 | Operational | ||||||
Mon... | 4,125 | 15 | Operational | ||||||
Mon... | 2,700 | 12 | Operational | ||||||
Mon... | 1,800 | 8 | Operational | ||||||
Mon... | 9,000 | 3 | Operational | ||||||
Mon... | 14,100 | 6 | Operational | ||||||
Mon... | 15,000 | 5 | Operational | ||||||
Mon... | 18,400 | 8 | Operational | ||||||
Mon... | 12,000 | 6 | Operational | ||||||
Mon... | 800 | 1 | Operational | ||||||
Mon... | 20,000 | 10 | Operational | ||||||
Mon... | 12,000 | 4 | Operational | ||||||
Mon... | 10,800 | 3 | Operational | ||||||
Mon... | 9,400 | 4 | Operational | ||||||
Mon... | 12,000 | 6 | Operational | ||||||
Mon... | 2,200 | 1 | Operational | ||||||
Mon... | 12,000 | 6 | Operational | ||||||
Mon... | 9,750 | 13 | Dismantled | ||||||
Mon... | 7,500 | 10 | Dismantled | ||||||
Mon... | 7,500 | 10 | Operational | ||||||
Mon... | 9,750 | 13 | Operational | ||||||
Mon... | 8,000 | 4 | Operational | ||||||
Mon... | 2,300 | 1 | Operational | ||||||
Mon... | 32,200 | 14 | Operational | ||||||
Moq... | 16,000 | 8 | Operational | ||||||
Mor... | 16,000 | 8 | Operational | ||||||
Mor... | 9,600 | 4 | Operational | ||||||
Mor... | 5,400 | 6 | Operational | ||||||
Mor... | 1,100 | 4 | Dismantled | ||||||
Mor... | 3,600 | 4 | Under construction | ||||||
Mor... | 12,300 | 6 | Operational | ||||||
Mot... | 15,400 | 7 | Operational | ||||||
Mou... | 10,000 | 5 | Operational | ||||||
Mou... | 29,700 | 9 | Operational | ||||||
Mou... | 29,000 | 8 | Under construction | ||||||
Mou... | 12,000 | 6 | Operational | ||||||
Mou... | 15,400 | 7 | Operational | ||||||
Mou... | 12,500 | 5 | Operational | ||||||
Mou... | 10,000 | 4 | Operational | ||||||
Mou... | 12,000 | 6 | Operational | ||||||
Mou... | 7,050 | 3 | Operational | ||||||
Mou... | 20,000 | 10 | Operational | ||||||
Mou... | 12,600 | 3 | Under construction | ||||||
Mou... | 8,000 | 10 | Operational | ||||||
Mur... | 11,700 | 9 | Operational | ||||||
Muz... | 10,020 | 6 | Dismantled | ||||||
Muz... | 6 | Under construction | |||||||
Nal... | 4,800 | 6 | Operational | ||||||
Nan... | 4,600 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Nan... | 13,200 | 6 | Operational | ||||||
Nes... | 6,000 | 3 | Operational | ||||||
Neu... | 10,000 | 5 | Operational | ||||||
Neu... | 12,000 | 4 | Under construction | ||||||
Neu... | 10,000 | 5 | Operational | ||||||
Név... | 5,950 | 7 | Operational | ||||||
Név... | 9,350 | 11 | Operational | ||||||
Név... | 2,550 | 3 | Operational | ||||||
Nex... | 6,000 | Planned | |||||||
Nib... | 12,000 | 6 | Operational | ||||||
Nib... | 12,000 | 6 | Operational | ||||||
Nib... | 4,700 | 2 | Operational | ||||||
Nie... | 12,000 | 6 | Operational | ||||||
Nie... | 16,000 | 8 | Operational | ||||||
Niz... | 6,000 | 3 | Operational | ||||||
Nog... | Dismantled | ||||||||
Noh... | 9,000 | 3 | Operational | ||||||
Noi... | 496,000 | 62 | Under construction | ||||||
Noi... | 12,000 | 6 | Operational | ||||||
Nor... | 8,000 | 4 | Operational | ||||||
Nor... | 6,000 | 3 | Operational | ||||||
Nor... | 6,000 | 3 | Operational | ||||||
Nor... | 6,000 | 3 | Operational | ||||||
Noy... | 12,500 | 5 | Operational | ||||||
Noy... | 10,000 | 4 | Operational | ||||||
Noy... | 11,500 | 5 | Operational | ||||||
Nue... | 11,120 | 4 | Operational | ||||||
Nur... | 8,000 | 4 | Operational | ||||||
Nur... | 3,600 | 1 | Operational | ||||||
Oig... | 15,000 | 5 | Operational | ||||||
Omi... | 12,000 | 6 | Operational | ||||||
Omi... | 10,000 | 5 | Dismantled | ||||||
Omi... | 11,000 | 5 | Under construction | ||||||
Omm... | 250 | 1 | Operational | ||||||
Ond... | 10,000 | 4 | Operational | ||||||
Opo... | 10,500 | 6 | Operational | ||||||
Ore... | 12,000 | 6 | Operational | ||||||
Ore... | 13,200 | 6 | Operational | ||||||
Orm... | 14,000 | 7 | Operational | ||||||
Orm... | 6,000 | 3 | Operational | ||||||
Orv... | 18,800 | 8 | Operational | ||||||
Orv... | 7,050 | 3 | Operational | ||||||
Ott... | 16,000 | 8 | Operational | ||||||
Oup... | 8,100 | 9 | Dismantled | ||||||
Oup... | 20,700 | 9 | Operational | ||||||
Our... | 10,000 | 5 | Operational | ||||||
Our... | 16,450 | 7 | Operational | ||||||
Oyr... | 10,250 | 5 | Operational | ||||||
Pam... | 10,000 | 5 | Operational | ||||||
Pâq... | 31,200 | Operational | |||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Par... | 10,000 | 5 | Operational | ||||||
Par... | 7,200 | 8 | Operational | ||||||
Par... | 32,000 | 16 | Operational | ||||||
Par... | 10,250 | 5 | Operational | ||||||
Par... | 12,800 | 4 | Operational | ||||||
Par... | 12,800 | 4 | Operational | ||||||
Par... | 12,800 | 4 | Operational | ||||||
Par... | 10,000 | 5 | Operational | ||||||
Par... | 24,000 | 8 | Operational | ||||||
Par... | 36,000 | 10 | Operational | ||||||
Par... | 3,600 | 1 | Operational | ||||||
Par... | 36,000 | 18 | Operational | ||||||
Par... | 8,000 | 4 | Operational | ||||||
Par... | 16,000 | 8 | Operational | ||||||
Par... | 21,000 | 5 | Operational | ||||||
Par... | 10,020 | 6 | Operational | ||||||
Par... | 8,350 | 5 | Operational | ||||||
Par... | 12,300 | 6 | Operational | ||||||
Par... | 12,300 | 6 | Operational | ||||||
Par... | 14,400 | 4 | Operational | ||||||
Par... | 8,000 | 4 | Operational | ||||||
Pât... | 7,500 | 3 | Operational | ||||||
Pât... | 25,200 | 6 | Operational | ||||||
Pau... | 15,000 | 5 | Operational | ||||||
Pau... | 15,000 | 5 | Operational | ||||||
Pay... | 18,000 | 5 | Under construction | ||||||
Pay... | 14,400 | 6 | Operational | ||||||
Pay... | 12,900 | 3 | Operational | ||||||
Pay... | 8,000 | 4 | Operational | ||||||
Pay... | 10,000 | 5 | Operational | ||||||
Pay... | 12,000 | 6 | Operational | ||||||
Pay... | 8,000 | 4 | Operational | ||||||
Pay... | 12,000 | 6 | Operational | ||||||
Pay... | 21,600 | 6 | Operational | ||||||
Pay... | 10,000 | 5 | Operational | ||||||
Pay... | 8,000 | 4 | Operational | ||||||
Pay... | 16,000 | 8 | Operational | ||||||
Pay... | 18,000 | 9 | Operational | ||||||
Pel... | 3,000 | 2 | Operational | ||||||
Pen... | 8,000 | 4 | Operational | ||||||
Pen... | 4,000 | 2 | Operational | ||||||
Pép... | 14,350 | 7 | Operational | ||||||
Pér... | 8,000 | 4 | Operational | ||||||
Pér... | 8,000 | 4 | Operational | ||||||
Per... | 12,300 | 6 | Operational | ||||||
Per... | 16,000 | 8 | Operational | ||||||
Pet... | 12,000 | 6 | Operational | ||||||
Pet... | 1,540 | 7 | Dismantled | ||||||
Pet... | 3,300 | 15 | Dismantled | ||||||
Pet... | 9,000 | 10 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Pet... | 2,200 | 10 | Operational | ||||||
Pet... | 4,250 | 5 | Operational | ||||||
Pet... | 6,900 | 3 | Operational | ||||||
Pet... | 10,000 | 5 | Operational | ||||||
Pet... | 2,475 | 9 | Operational | ||||||
Pey... | 9,000 | 6 | Operational | ||||||
Piè... | 12,000 | 4 | Operational | ||||||
Pie... | 4,400 | 2 | Operational | ||||||
Pig... | 12,000 | 6 | Operational | ||||||
Pih... | 14,400 | 4 | Under construction | ||||||
Pir... | 9,000 | 3 | Operational | ||||||
Pla... | 13,800 | 6 | Operational | ||||||
Pla... | 13,800 | 6 | Operational | ||||||
Pla... | 13,800 | 6 | Operational | ||||||
Pla... | 8,400 | 2 | Operational | ||||||
Pla... | 12,500 | 5 | Operational | ||||||
Pla... | 22,000 | 10 | Operational | ||||||
Pla... | 18,000 | 5 | Under construction | ||||||
Pla... | 36,000 | 9 | Operational | ||||||
Pla... | 13,800 | 4 | Operational | ||||||
Pla... | 22,500 | 9 | Operational | ||||||
Pla... | 7,800 | 3 | Operational | ||||||
Pla... | 23,400 | 9 | Operational | ||||||
Pla... | 20,000 | 10 | Operational | ||||||
Pla... | 11,750 | 5 | Operational | ||||||
Pla... | 1,800 | 3 | Dismantled | ||||||
Pla... | Dismantled | ||||||||
Pla... | 11,500 | 5 | Operational | ||||||
Pla... | 22,000 | 11 | Operational | ||||||
Pla... | 3,400 | 4 | Operational | ||||||
Pla... | 3,400 | 4 | Operational | ||||||
Pla... | 12,000 | 6 | Operational | ||||||
Pla... | 11,500 | 5 | Operational | ||||||
Pla... | 9,200 | 4 | Operational | ||||||
Pla... | 12,300 | 6 | Operational | ||||||
Pla... | 12,000 | 6 | Operational | ||||||
Pla... | 4,000 | 2 | Operational | ||||||
Pla... | 11,500 | 5 | Operational | ||||||
Pla... | 12,000 | 6 | Operational | ||||||
Pla... | 10,000 | 5 | Operational | ||||||
Ple... | 12,000 | 6 | Operational | ||||||
Plé... | 12,000 | 6 | Operational | ||||||
Plé... | 6,900 | 3 | Operational | ||||||
Plé... | 2,400 | 3 | Operational | ||||||
Plé... | 11,000 | 5 | Operational | ||||||
Ple... | 10,000 | 5 | Operational | ||||||
Pli... | 12,000 | 6 | Operational | ||||||
Pli... | 5,600 | 7 | Operational | ||||||
Plo... | 13,800 | 6 | Operational | ||||||
Plo... | 14,100 | 6 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Plo... | 9,200 | 4 | Operational | ||||||
Plo... | 12,000 | 5 | Operational | ||||||
Plo... | 3,300 | 5 | Dismantled | ||||||
Plo... | 3,400 | 4 | Dismantled | ||||||
Plo... | 4,000 | 5 | Operational | ||||||
Plo... | 9,100 | 7 | Operational | ||||||
Plo... | 6,000 | 8 | Operational | ||||||
Plo... | 4,000 | 5 | Operational | ||||||
Plo... | 10,000 | 5 | Operational | ||||||
Plo... | 8,000 | 4 | Operational | ||||||
Plo... | 5,250 | 7 | Dismantled | ||||||
Plo... | 5,400 | 6 | Operational | ||||||
Plo... | 3,400 | 4 | Operational | ||||||
Plo... | 10,400 | 8 | Operational | ||||||
Plo... | 3,000 | 4 | Dismantled | ||||||
Plo... | 9,200 | 4 | Operational | ||||||
Plu... | 16,000 | 8 | Operational | ||||||
Plu... | 6,000 | 3 | Operational | ||||||
Poi... | 14,100 | 6 | Operational | ||||||
Poi... | 19,200 | 8 | Operational | ||||||
Pon... | 12,000 | 6 | Operational | ||||||
Pon... | 16,000 | 8 | Operational | ||||||
Por... | 10,000 | 4 | Operational | ||||||
Por... | 10,200 | 12 | Operational | ||||||
Por... | 10,200 | 12 | Operational | ||||||
Por... | 850 | 1 | Operational | ||||||
Por... | 8,000 | 4 | Operational | ||||||
Por... | 11,500 | 5 | Operational | ||||||
Por... | 6,900 | 3 | Operational | ||||||
Por... | 12,300 | 6 | Operational | ||||||
Por... | 18,000 | 9 | Operational | ||||||
Por... | 6,000 | 3 | Operational | ||||||
Por... | 18,000 | 9 | Operational | ||||||
Por... | 12,000 | 6 | Operational | ||||||
Por... | 21,600 | 6 | Operational | ||||||
Pou... | 23,500 | 10 | Operational | ||||||
Pou... | 4,700 | 2 | Operational | ||||||
Pou... | 6,900 | 3 | Operational | ||||||
Pou... | 2,550 | 3 | Operational | ||||||
Pou... | 2,550 | 3 | Operational | ||||||
Pre... | 6,000 | 3 | Operational | ||||||
Pre... | 6,600 | 3 | Operational | ||||||
Pré... | 12,000 | 6 | Operational | ||||||
Pri... | 12,500 | 5 | Operational | ||||||
Pro... | 4,620 | 21 | Operational | ||||||
Pro... | 2,200 | 10 | Dismantled | ||||||
Pro... | 5,500 | 20 | Operational | ||||||
Pro... | 2,750 | 10 | Operational | ||||||
Pro... | 800 | 1 | Operational | ||||||
Pro... | 25,200 | 3 | Under construction | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Puc... | 7,050 | 3 | Operational | ||||||
Pue... | 11,700 | 9 | Operational | ||||||
Pue... | 16,100 | 7 | Operational | ||||||
Pui... | 13,200 | 6 | Operational | ||||||
Pun... | 6,000 | 10 | Operational | ||||||
Qua... | 10,000 | 5 | Operational | ||||||
Qua... | 20,700 | 9 | Operational | ||||||
Qua... | 16,000 | 8 | Operational | ||||||
Qua... | 12,000 | 6 | Operational | ||||||
Qua... | 20,000 | 10 | Operational | ||||||
Qua... | 16,000 | 8 | Operational | ||||||
Qua... | 9,000 | 6 | Operational | ||||||
Qua... | 9,000 | 3 | Operational | ||||||
Qua... | 12,000 | 6 | Operational | ||||||
Qué... | 4 | Under construction | |||||||
Que... | 7,050 | 3 | Operational | ||||||
Que... | 11,500 | 5 | Operational | ||||||
Que... | 11,500 | 5 | Operational | ||||||
Que... | 12,300 | 6 | Operational | ||||||
Qui... | 9,000 | 3 | Under construction | ||||||
Qui... | 8,000 | 4 | Operational | ||||||
Qui... | 6,000 | 3 | Operational | ||||||
Qui... | 46,200 | 11 | Operational | ||||||
Qui... | 4,200 | 1 | Under construction | ||||||
Qui... | 4,200 | 1 | Under construction | ||||||
Qui... | 6,000 | 2 | Operational | ||||||
Qui... | 8,200 | 4 | Operational | ||||||
Rad... | 8,200 | 4 | Operational | ||||||
Rad... | 2,200 | 1 | Operational | ||||||
Rag... | 12,000 | 6 | Operational | ||||||
Rag... | 12,000 | 6 | Operational | ||||||
Ram... | 12,000 | 6 | Operational | ||||||
Ram... | 11,750 | 5 | Operational | ||||||
Ram... | 12,000 | 6 | Operational | ||||||
Ram... | 26,000 | 13 | Operational | ||||||
Ras... | 11,500 | 5 | Operational | ||||||
Réc... | 6,000 | 3 | Operational | ||||||
Rem... | 30,000 | 10 | Operational | ||||||
Rem... | 18,400 | 8 | Operational | ||||||
Ren... | 18,450 | 9 | Operational | ||||||
Res... | 16,000 | 8 | Operational | ||||||
Reu... | 21,600 | 9 | Operational | ||||||
Réz... | 10,000 | 4 | Operational | ||||||
Ria... | 17,000 | 5 | Operational | ||||||
Ric... | 92,400 | 22 | Operational | ||||||
Ric... | 16,800 | 4 | Operational | ||||||
Ril... | 2,000 | 1 | Operational | ||||||
Riv... | 5,200 | 4 | Dismantled | ||||||
Riv... | 2,400 | 4 | Dismantled | ||||||
Riv... | 11,200 | 6 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Roc... | 2 | Operational | |||||||
Roc... | 18,000 | 9 | Operational | ||||||
Roi... | 8,000 | 4 | Operational | ||||||
Rom... | 4,400 | 2 | Operational | ||||||
Rom... | 4,400 | 2 | Operational | ||||||
Rom... | 10,000 | 5 | Operational | ||||||
Rom... | 6,600 | 3 | Operational | ||||||
Rom... | 12,000 | 4 | Under construction | ||||||
Rom... | 6,000 | 2 | Under construction | ||||||
Ron... | 12,000 | 6 | Operational | ||||||
Ron... | 6,000 | 3 | Operational | ||||||
Ron... | 12,000 | 6 | Operational | ||||||
Ron... | 10,000 | 5 | Operational | ||||||
Roq... | 5,280 | 8 | Operational | ||||||
Roq... | 17,000 | 20 | Operational | ||||||
Ros... | 9,000 | 3 | Operational | ||||||
Ros... | 3 | Operational | |||||||
Rou... | 9,000 | 3 | Operational | ||||||
Rou... | 36,140 | 13 | Operational | ||||||
Rou... | 44,480 | 16 | Operational | ||||||
Rou... | 15,000 | 5 | Operational | ||||||
Rou... | 10,500 | 6 | Operational | ||||||
Rou... | 10,500 | 6 | Operational | ||||||
Rou... | 18,400 | 8 | Operational | ||||||
Rou... | 9,200 | 4 | Operational | ||||||
Roy... | 11,400 | 4 | Operational | ||||||
Rui... | 6,000 | 3 | Operational | ||||||
Rul... | 12,000 | 6 | Operational | ||||||
Sac... | 9,200 | 4 | Operational | ||||||
Sai... | 6,000 | 2 | Operational | ||||||
Sai... | 26,400 | 8 | Operational | ||||||
Sai... | 12,000 | 4 | Operational | ||||||
Sai... | 13,800 | 6 | Operational | ||||||
Sai... | 10,000 | 5 | Operational | ||||||
Sai... | 3,400 | 4 | Operational | ||||||
Sai... | 11,000 | 5 | Operational | ||||||
Sai... | 12,000 | 4 | Operational | ||||||
Sai... | 15,000 | 3 | Operational | ||||||
Sai... | 11,500 | 5 | Operational | ||||||
Sai... | 9,000 | 3 | Operational | ||||||
Sai... | 11,000 | 5 | Operational | ||||||
Sai... | 10,800 | 3 | Under construction | ||||||
Sai... | 11,500 | 5 | Operational | ||||||
Sai... | 9,200 | 4 | Operational | ||||||
Sai... | 12,000 | 6 | Operational | ||||||
Sai... | 3,200 | 4 | Operational | ||||||
Sai... | 496,000 | 62 | Operational | ||||||
Sai... | 7,500 | 3 | Operational | ||||||
Sai... | 8,000 | 4 | Operational | ||||||
Sai... | 1,200 | 2 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sai... | 8,000 | 4 | Operational | ||||||
Sai... | 9,000 | 6 | Operational | ||||||
Sai... | 9,000 | 3 | Operational | ||||||
Sai... | 19,800 | 9 | Operational | ||||||
Sai... | 12,000 | 6 | Operational | ||||||
Sai... | 12,000 | 6 | Operational | ||||||
Sai... | 11,400 | 4 | Operational | ||||||
Sai... | 6,000 | 3 | Operational | ||||||
Sai... | 11,000 | 5 | Operational | ||||||
Sai... | 11,500 | 5 | Operational | ||||||
Sai... | 10,000 | 5 | Operational | ||||||
Sai... | 12,300 | 6 | Operational | ||||||
Sai... | 6,150 | 3 | Operational | ||||||
Sai... | 2,400 | 1 | Operational | ||||||
Sai... | 9,000 | 3 | Operational | ||||||
Sai... | 1,000 | 1 | Operational | ||||||
Sai... | 10,000 | 5 | Operational | ||||||
Sai... | 12,000 | 6 | Operational | ||||||
Sai... | 6,000 | 3 | Operational | ||||||
Sai... | 10,250 | 5 | Operational | ||||||
Sai... | 18,000 | 6 | Operational | ||||||
Sai... | 3,400 | 4 | Operational | ||||||
Sai... | 6,000 | 3 | Operational | ||||||
Sai... | 12,000 | 6 | Operational | ||||||
Sai... | 6,000 | 2 | Operational | ||||||
Sai... | 10,250 | 5 | Operational | ||||||
Sai... | 8,800 | 4 | Operational | ||||||
Sai... | 10,250 | 5 | Operational | ||||||
Sai... | 9,400 | 4 | Operational | ||||||
Sai... | 480,000 | 80 | Operational | ||||||
Sai... | 14,000 | 7 | Operational | ||||||
Sai... | 21,600 | 9 | Operational | ||||||
Sai... | 6,600 | 3 | Operational | ||||||
Sai... | 6,150 | 3 | Operational | ||||||
Sai... | 10,250 | 5 | Operational | ||||||
Sai... | 10,250 | 5 | Operational | ||||||
Sai... | 12,500 | 5 | Operational | ||||||
Sai... | 12,500 | 5 | Operational | ||||||
Sai... | 24,000 | 8 | Operational | ||||||
Sai... | 4,100 | 2 | Operational | ||||||
Sai... | 20,600 | 7 | Operational | ||||||
Sai... | 12,000 | 4 | Operational | ||||||
Sai... | 21,000 | 5 | Operational | ||||||
Sai... | 5,600 | 7 | Operational | ||||||
Sai... | 12,000 | 6 | Operational | ||||||
Sai... | Dismantled | ||||||||
Sai... | 4,000 | 5 | Operational | ||||||
Sai... | 3,850 | 14 | Dismantled | ||||||
Sai... | 3,300 | 12 | Dismantled | ||||||
Sai... | 3,025 | 11 | Dismantled | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Sai... | 19,800 | 9 | Operational | ||||||
Sai... | 15,400 | 7 | Operational | ||||||
Sai... | 15,000 | 5 | Operational | ||||||
Sai... | 6,900 | 2 | Operational | ||||||
Sai... | 1,250 | 1 | Operational | ||||||
Sai... | 250 | 1 | Operational | ||||||
Sai... | 12,000 | 6 | Operational | ||||||
Sai... | 8,000 | 4 | Operational | ||||||
Sai... | 8,000 | 4 | Operational | ||||||
Sai... | 6,325 | 23 | Dismantled | ||||||
Sai... | 15,000 | 5 | Operational | ||||||
Sal... | 7,500 | 10 | Dismantled | ||||||
Sal... | 8,000 | 4 | Operational | ||||||
Sam... | 53,300 | 26 | Operational | ||||||
San... | 8,800 | 4 | Operational | ||||||
San... | 20,000 | 8 | Operational | ||||||
Saô... | 8,000 | 4 | Operational | ||||||
Sar... | 2,300 | 1 | Operational | ||||||
Sar... | 23,100 | 11 | Operational | ||||||
Sas... | 15,000 | 6 | Operational | ||||||
Ség... | 12,000 | 6 | Operational | ||||||
Seh... | 6,000 | 2 | Operational | ||||||
Sei... | 30,000 | 12 | Operational | ||||||
Sei... | 45,000 | 18 | Operational | ||||||
Sei... | 32,000 | 16 | Operational | ||||||
SEM... | 8,000 | Operational | |||||||
Sen... | 11,500 | 5 | Operational | ||||||
Sep... | 2,050 | 1 | Operational | ||||||
Sep... | 13,200 | 6 | Operational | ||||||
Sér... | 4,100 | 2 | Operational | ||||||
Sér... | 6,150 | 3 | Operational | ||||||
Ser... | 600 | 1 | Operational | ||||||
Ser... | 6,000 | 3 | Operational | ||||||
Ser... | 8,000 | 4 | Operational | ||||||
Ser... | 16,000 | 8 | Operational | ||||||
Seu... | 15,000 | 5 | Operational | ||||||
Seu... | 17,250 | 5 | Operational | ||||||
Seu... | 10,000 | 5 | Operational | ||||||
Sév... | 8,200 | 4 | Operational | ||||||
Sév... | 18,450 | 9 | Operational | ||||||
Sil... | 2,350 | 1 | Operational | ||||||
Sil... | 4,600 | 2 | Operational | ||||||
Sin... | 2,300 | 1 | Operational | ||||||
Sio... | 10,000 | 5 | Operational | ||||||
Sio... | 4,800 | 6 | Operational | ||||||
Sol... | 10,250 | 5 | Operational | ||||||
Sol... | 27,600 | 8 | Operational | ||||||
Som... | 25,200 | 7 | Operational | ||||||
Som... | 18,450 | 9 | Operational | ||||||
Som... | 2,050 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Som... | 12,300 | 6 | Operational | ||||||
Sor... | 13,860 | 4 | Operational | ||||||
Sou... | 10,000 | 5 | Operational | ||||||
Sou... | 25,200 | 6 | Operational | ||||||
Sou... | 10,000 | 5 | Operational | ||||||
Sou... | 8,000 | 4 | Operational | ||||||
Sou... | 6,000 | 3 | Operational | ||||||
Sou... | 10,000 | 5 | Operational | ||||||
Sou... | 10,250 | 5 | Operational | ||||||
Sou... | 10,250 | 5 | Operational | ||||||
Sou... | 13,000 | 10 | Dismantled | ||||||
Sou... | 7,800 | 6 | Dismantled | ||||||
Sou... | 19,200 | 16 | Operational | ||||||
Sou... | 8,000 | 4 | Operational | ||||||
Sou... | 6,150 | 3 | Operational | ||||||
Sou... | 10,000 | 5 | Operational | ||||||
Sou... | 6,150 | 3 | Operational | ||||||
Sou... | 12,300 | 6 | Operational | ||||||
Sou... | 23,100 | 7 | Operational | ||||||
Sou... | 2,000 | 1 | Operational | ||||||
Sou... | 8,000 | 4 | Operational | ||||||
St-... | 200 | 1 | Operational | ||||||
Sud... | 126,000 | 30 | Operational | ||||||
Sud... | 46,200 | 11 | Operational | ||||||
Sud... | 23,400 | 9 | Operational | ||||||
Sud... | 21,600 | 6 | Operational | ||||||
Sud... | 17,600 | 8 | Operational | ||||||
Sud... | 19,800 | 9 | Operational | ||||||
Sud... | 12,000 | 6 | Operational | ||||||
Sud... | 12,000 | 6 | Operational | ||||||
Tai... | 6,000 | 3 | Operational | ||||||
Tal... | 12,000 | 6 | Operational | ||||||
Tal... | 6,000 | 3 | Operational | ||||||
Tam... | 8,350 | 5 | Operational | ||||||
Tar... | 8,000 | 4 | Operational | ||||||
Tas... | 8,000 | 4 | Operational | ||||||
Tei... | 8,000 | 4 | Operational | ||||||
Ter... | 11,500 | 5 | Operational | ||||||
Ter... | 9,200 | 4 | Operational | ||||||
Ter... | 13,800 | 6 | Operational | ||||||
Ter... | 1,925 | 7 | Operational | ||||||
Ter... | 25,000 | 10 | Operational | ||||||
Ter... | 15,000 | 5 | Operational | ||||||
Ter... | 11,000 | 5 | Operational | ||||||
Ter... | 14,000 | 7 | Operational | ||||||
Ter... | 10,000 | 5 | Operational | ||||||
Ter... | 19,020 | 6 | Operational | ||||||
Tét... | 9,000 | 6 | Operational | ||||||
The... | 12,000 | 6 | Operational | ||||||
Thi... | 18,000 | 9 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Thi... | 8,000 | 4 | Operational | ||||||
Thi... | 2,000 | 1 | Operational | ||||||
Tho... | 18,000 | 6 | Operational | ||||||
Tig... | 11,500 | 5 | Operational | ||||||
Tig... | 11,500 | 5 | Operational | ||||||
Til... | 12,300 | 6 | Operational | ||||||
Til... | 4,400 | 2 | Operational | ||||||
Til... | 8,800 | 4 | Operational | ||||||
TIP... | 6,600 | 3 | Operational | ||||||
Tiv... | 25,200 | 6 | Under construction | ||||||
Tor... | 18,000 | 5 | Operational | ||||||
Tot... | 8,800 | 4 | Operational | ||||||
Tou... | 300 | 2 | Dismantled | ||||||
Tou... | 4,950 | 18 | Operational | ||||||
Tou... | 12,000 | 6 | Operational | ||||||
Tou... | 18,000 | 6 | Operational | ||||||
Tou... | 13,800 | 6 | Operational | ||||||
Tou... | 8,200 | 4 | Operational | ||||||
Tra... | 9,900 | 3 | Operational | ||||||
Tré... | 9,000 | 6 | Dismantled | ||||||
Tré... | 13,800 | 6 | Operational | ||||||
Tré... | 7,500 | 3 | Dismantled | ||||||
Tre... | 8,000 | 4 | Operational | ||||||
Tré... | 12,000 | 6 | Operational | ||||||
Tré... | 14,000 | 4 | Under construction | ||||||
Tré... | 15,400 | 7 | Operational | ||||||
Tré... | 13,200 | 6 | Operational | ||||||
Tro... | 12,000 | 6 | Operational | ||||||
Tro... | 10,000 | 5 | Operational | ||||||
Tro... | 36,000 | 18 | Operational | ||||||
Tru... | 11,690 | 7 | Operational | ||||||
Tuc... | 3,000 | 5 | Operational | ||||||
Tuc... | 6,000 | 10 | Operational | ||||||
Tuc... | 2,700 | 3 | Operational | ||||||
Tur... | 10,500 | 5 | Operational | ||||||
Ty-... | 10,000 | 5 | Operational | ||||||
Uss... | 10,000 | 5 | Operational | ||||||
Vai... | 4,000 | 5 | Operational | ||||||
Vai... | 38,920 | 14 | Operational | ||||||
Val... | 15,000 | 6 | Operational | ||||||
Val... | 12,000 | 6 | Operational | ||||||
Val... | 8,000 | 4 | Operational | ||||||
Val... | 2,000 | 1 | Operational | ||||||
Val... | 11,500 | 5 | Operational | ||||||
Val... | 12,000 | 6 | Operational | ||||||
Val... | 9,900 | 3 | Operational | ||||||
Val... | 10,800 | 3 | Operational | ||||||
Val... | 10,800 | 3 | Operational | ||||||
Val... | 2,000 | 1 | Operational | ||||||
Val... | 2,000 | 1 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Val... | 23,000 | 10 | Operational | ||||||
Val... | 11,000 | 5 | Operational | ||||||
Val... | 8,000 | 4 | Operational | ||||||
Val... | 6,900 | 2 | Operational | ||||||
Val... | 13,800 | 4 | Operational | ||||||
Val... | 12,300 | 6 | Operational | ||||||
Val... | 6,150 | 3 | Operational | ||||||
Val... | 12,300 | 6 | Operational | ||||||
Val... | 14,000 | 7 | Operational | ||||||
Val... | 17,600 | 8 | Operational | ||||||
Val... | 12,000 | 6 | Operational | ||||||
Val... | 10,000 | 5 | Operational | ||||||
Val... | 12,000 | 6 | Operational | ||||||
Val... | 6,000 | 2 | Operational | ||||||
Val... | 11,500 | 5 | Operational | ||||||
Val... | 11,000 | 5 | Operational | ||||||
Van... | 8,500 | 10 | Operational | ||||||
Van... | 42,500 | 17 | Operational | ||||||
Var... | 4,800 | 6 | Operational | ||||||
Var... | 8,800 | 4 | Operational | ||||||
Vau... | 12,000 | 6 | Operational | ||||||
Vau... | 21,000 | 7 | Operational | ||||||
Vau... | 12,000 | 6 | Operational | ||||||
Vau... | 18,000 | 6 | Operational | ||||||
Ven... | 7,500 | 3 | Operational | ||||||
Ven... | 7,500 | 3 | Operational | ||||||
Ven... | 10,000 | 4 | Operational | ||||||
Ven... | 10,000 | 4 | Operational | ||||||
Ven... | 7,500 | 3 | Operational | ||||||
Ven... | 15,000 | 5 | Operational | ||||||
Ven... | 5,250 | 2 | Operational | ||||||
Ven... | 10,395 | 3 | Operational | ||||||
Ven... | 13,860 | 4 | Operational | ||||||
Ven... | 13,860 | 4 | Operational | ||||||
Ven... | 10,395 | 3 | Operational | ||||||
Ven... | 24,200 | 11 | Operational | ||||||
Ven... | 12,500 | 5 | Operational | ||||||
Ven... | 15,000 | 6 | Operational | ||||||
Ven... | 2,400 | 1 | Operational | ||||||
Ver... | 14,700 | 7 | Operational | ||||||
Ver... | 15,750 | 6 | Operational | ||||||
Ver... | 8,000 | 4 | Operational | ||||||
Ver... | 13,200 | 6 | Operational | ||||||
Veu... | 8,000 | 4 | Operational | ||||||
Vex... | 6,900 | 3 | Operational | ||||||
Vex... | 7,050 | 3 | Operational | ||||||
Vez... | 10,800 | 3 | Operational | ||||||
Via... | 12,000 | 6 | Operational | ||||||
Via... | 2,000 | 1 | Operational | ||||||
Vie... | 12,000 | 6 | Operational | ||||||
|
Name | Area | Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
||
Vie... | 17,600 | 8 | Operational | ||||||
Vie... | 11,500 | 5 | Operational | ||||||
Vil... | 8,000 | 4 | Operational | ||||||
Vil... | 9,600 | 4 | Operational | ||||||
Vil... | 2,300 | 1 | Operational | ||||||
Vil... | 36,000 | 8 | Under construction | ||||||
Vil... | 15,000 | 5 | Operational | ||||||
Vil... | 50,600 | 22 | Operational | ||||||
Voi... | 25,200 | 7 | Operational | ||||||
Voi... | 10,000 | 5 | Operational | ||||||
Voi... | 36,000 | 10 | Operational | ||||||
Voi... | 10,250 | 5 | Operational | ||||||
Voi... | 21,600 | 6 | Operational | ||||||
Voi... | 12,000 | 6 | Operational | ||||||
Voi... | 12,000 | 6 | Operational | ||||||
Voi... | 12,000 | 6 | Operational | ||||||
Voi... | 12,000 | 6 | Operational | ||||||
Voi... | 6,000 | 3 | Operational | ||||||
Vou... | 20,700 | 6 | Operational | ||||||
Voy... | 16,000 | 8 | Operational | ||||||
Vri... | 6,600 | 3 | Operational | ||||||
Vro... | 8,000 | 4 | Operational | ||||||
Vro... | 9,200 | 4 | Operational | ||||||
Wan... | 2,000 | 1 | Operational | ||||||
Wel... | 10,000 | 4 | Operational | ||||||
Wid... | 3,750 | 5 | Dismantled | ||||||
Wid... | 750 | 1 | Dismantled | ||||||
Wor... | 400 | 1 | Dismantled | ||||||
Wœl... | 10,250 | 5 | Operational | ||||||
Xam... | 12,500 | 5 | Operational | ||||||
Xan... | 8,800 | 4 | Operational | ||||||
Xan... | 2,000 | 1 | Operational | ||||||
Xan... | 2,000 | 1 | Operational | ||||||
Xan... | 6,000 | 3 | Operational | ||||||
Yat... | 20,400 | 24 | Operational | ||||||
Ypr... | 12,000 | 6 | Operational | ||||||
Yro... | 12,000 | 5 | Operational | ||||||
Yvi... | 8,000 | 4 | Operational | ||||||
Zon... | 12,500 | 5 | Operational | ||||||
|
Name Area |
Power (kW) | Number of turbines |
Hub height (m) |
Turbine manufacturer |
Status | Commissioning date |
/ | ||||||
4 vents |
7,500 | 3 | Operational | |||
4 vents |
7,500 | 3 | Operational | |||
4 vents |
10,000 | 4 | Operational | |||
4 vents |
10,000 | 4 | Operational | |||
Ablaincourt |
36,000 | 10 | Operational | |||
Ablaincourt-Pressoir |
4,100 | 2 | Operational | |||
Ablainzevelle |
2,000 | 1 | Operational | |||
Achery-Mayot |
27,500 | 11 | Operational | |||
Achiet-le-Petit I |
21,000 | 7 | Operational | |||
Achiet-le-Petit II |
7,050 | 3 | Operational | |||
Achiet-le-Petit III |
4,700 | 2 | Operational | |||
Adriers |
10,000 | 5 | Operational | |||
AFLOWT France |
6,000 |