[Back to previous page]
Generalities
|
|
Details
- City: Tange
- Commissioning:
- 2 turbines: (manufacturer name not available)
- Total nominal power: 300 kW
- Dismantled (2016/03)
- Onshore wind farm
- Source:
Localisation
- Latitude: 55° 26' 48.7"
- Longitude: 8° 48' 50.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: