[Back to previous page]
Generalities
|
|
Details
- City: Svanholm
- Commissioning:
- 1 turbine: Micon M570 (power 200 kW, diameter 27 m)
- Hub height:
- Total nominal power: 200 kW
- Operational
- Onshore wind farm
- Operator: Orsted
- Source:
Localisation
No data.
Update for this sheet: 0
Complete/correct this sheet: