[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Anantapur
- 50 turbines: (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
- Owner:
Part #2:
- City: Anantapur
- Commissioning:
- 50 turbines: (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
- Developer: Greenko
Localisation
Part #1:
- Latitude: 14° 40' 47.5"
- Longitude: 77° 35' 6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 14° 40' 47.5"
- Longitude: 77° 35' 6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 12 June 2024
Complete/correct this sheet: