[Back to previous page]
Generalities
|
|
Details
Part #1:
- Commissioning:
- 1 turbine: Enercon E30/300 (power 300 kW, diameter 30 m)
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning:
- 1 turbine: Nordtank
- Total nominal power: 333 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
Part #2:
Update for this sheet: 30 April 2018
Complete/correct this sheet: