Generalities
|
|
Details
Part #1:
- City: Hartenfels
- Commissioning:
- 1 turbine: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Owner:
Part #2:
- City: Hartenfels
- Commissioning:
- 4 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Operator: Breeze Two Energy GmbH
Part #3:
- City: Herschbach
- Commissioning:
- 2 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Operator: Breeze Two Energy GmbH
Part #4:
- City: Mündersbach
- Commissioning:
- 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #5:
- City: Höchstenbach
- Commissioning:
- 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: Juwi
Part #6:
- City: Mündersbach
- Commissioning:
- 4 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Operator: Breeze Two Energy GmbH
Part #7:
- City: Mündersbach
- Commissioning:
- 2 turbines: Schütz GmbH VT110 (power 3 200 kW, diameter 110 m)
- Hub height:
- Total nominal power: 6,400 kW
- Operational
- Onshore wind farm
- Developer: Schütz-Gruppe
Part #8:
- City: Schenkelberg
- Commissioning:
- 5 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Hub height:
- Total nominal power: 11,750 kW
- Operational
- Onshore wind farm
Part #9:
- City: Höchstenbach
- Commissioning:
- 6 turbines: Schütz GmbH VT110 (power 3 200 kW, diameter 110 m)
- Hub height:
- Total nominal power: 19,200 kW
- Operational
- Onshore wind farm
- Developer: Schütz-Gruppe
Part #10:
- City: Herschbach
- Commissioning:
- 1 turbine: Enercon E138/4200 (power 4 200 kW, diameter 138.25 m)
- Hub height:
- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
Part #11:
- City: Herschbach
- Commissioning:
- 1 turbine: Enercon E138/3500 (power 3 500 kW, diameter 138 m)
- Hub height:
- Total nominal power: 3,500 kW
- Operational
- Onshore wind farm
- Owner:
- Source:
Localisation
Part #1:
- Latitude: 50° 36' 59.6"
- Longitude: 7° 45' 27.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 50° 36' 48.4"
- Longitude: 7° 46' 9.7"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 50° 36' 17.4"
- Longitude: 7° 45' 52.4"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 50° 36' 28.7"
- Longitude: 7° 45' 34.9"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 50° 36' 51.6"
- Longitude: 7° 45' 40.7"
- Altitude: 475 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #6:
- Latitude: 50° 36' 35.5"
- Longitude: 7° 45' 45.9"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 50° 36' 51.6"
- Longitude: 7° 45' 40.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #8:
- Latitude: 50° 36' 51.6"
- Longitude: 7° 45' 40.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #9:
- Latitude: 50° 36' 51.6"
- Longitude: 7° 45' 40.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #10:
- Latitude: 50° 35' 58.6"
- Longitude: 7° 46' 22.9"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Latitude: 50° 35' 56.7"
- Longitude: 7° 45' 23.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0