[Back to previous page]
Generalities
|
|
Details
- City: Chitradurga
- Commissioning:

- 3 turbines: Neg Micon NM54/950 (power 950 kW, diameter 54 m)
- Hub height:

- Total nominal power: 2,850 kW
- Operational
- Onshore wind farm
- Developer: MSPL Limited
- Operator: MSPL Limited
Localisation
- Latitude: 14° 13' 19.7"
- Longitude: 76° 24' 3.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: