Generalities
|
|
Details
Part #1:
Part #2:
- Part: Kyrkebys 3-4
- City: Hangvar
- Commissioning:
- 2 turbines: Enercon E44/600 (power 600 kW, diameter 44 m)
- Hub height:
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Part: Kyrkebys 1-2
- Latitude: 57° 50' 31.7"
- Longitude: 18° 40' 55.1"
- Altitude: 20 m
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Kyrkebys 3-4
- Latitude: 57° 50' 24"
- Longitude: 18° 41' 24"
- Altitude: 20 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 13 September 2024