[Back to previous page]
Generalities
- Wind farm name: Sturkö 2
- Country: Sweden
- County / Zone: Blekinge
- Other name: Gudigen
|
|
Details
- City: Gudingen
- Commissioning:
![Reserved for Premium Access](images/site/locked.png)
- 1 turbine: Enercon E48/800 (power 800 kW, diameter 48 m)
- Hub height:
![Reserved for Premium Access](images/site/locked.png)
- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Operator: Ekovind AB
Localisation
Update for this sheet: 9 September 2024
Complete/correct this sheet: