[Back to previous page]
Generalities
|
|
Details
- City: Erenhot
- Commissioning:
- 4 turbines: (manufacturer name not available)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Changfeng Xiehe
Localisation
- Latitude: 43° 38' 59.9"
- Longitude: 111° 58' 11.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: