[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Jimo
- 2 turbines: Nordex
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #2:
- City: Jimo
- Commissioning:
- 1 turbine: Nordex
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #3:
- City: Jimo
- Commissioning:
- 12 turbines: Nordex N62/1300 (power 1 300 kW, diameter 62 m)
- Total nominal power: 15,600 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 36° 30' 0"
- Longitude: 120° 30' 0"
- Altitude: 70 m
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 36° 30' 0"
- Longitude: 120° 30' 0"
- Altitude: 70 m
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 36° 30' 0"
- Longitude: 120° 30' 0"
- Altitude: 70 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: