[Back to previous page]
Generalities
|
|
Details
- City: Neetzow-Liepen
- Commissioning:

- 4 turbines: Nordex N149/5.X (power 5 000 kW, diameter 149.1 m)
- Hub height:

- Total nominal power: 22,800 kW (uprated turbines)
- Operational
- Onshore wind farm
Localisation
- Latitude: 53° 52' 33.1"
- Longitude: 13° 27' 6.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: