[Back to previous page]
Generalities
|
|
Details
Part #1:
- Commissioning:

- 1 turbine: Mitsubishi
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
- Operator: Muroran city
Part #2:
- Commissioning:

- 1 turbine: Mitsubishi
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Operator: Muroran city
Localisation
Part #1:
- Latitude: 43° 1' 12"
- Longitude: 141° 20' 59.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 43° 1' 12"
- Longitude: 141° 20' 59.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 9 September 2019
Complete/correct this sheet: