Generalities
- Wind farm name: Kangbao
- Country: China
- County / Zone: Hebei
|
|
Details
Part #1:
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 450,000 kW
- Operational
- Onshore wind farm
Part #2:
- City: Dengyoufang Zhen
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
- Operator: China Three Gorges Corporation
Part #3:
- City: Zhangji
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 300,000 kW
- Operational
- Onshore wind farm
- Operator: Hebei Hongmeng
- Owner:
Part #4:
- City: Tuchengzi
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 300,000 kW
- Operational
- Onshore wind farm
- Operator: Hebei Hongmeng
- Owner:
Part #5:
- City: Zhaoyanghe
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 150,000 kW
- Operational
- Onshore wind farm
- Operator: Hebei Hongmeng
- Owner:
Part #6:
- City: Tunken
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
- Operator: Hebei Hongmeng
- Owner:
Part #7:
- City: Mandetang
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Operational
- Onshore wind farm
- Operator: Hebei Hongmeng
- Owner:
Part #8:
- Part: Part 1
- City: Mandetang Xiang
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: Shenhua
Part #9:
- Part: Part 1
- City: Tunken
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 300,000 kW
- Operational
- Onshore wind farm
Part #10:
- Part: Part 2
- City: Mandetang Xiang
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 300,000 kW
- Operational
- Onshore wind farm
- Operator: Shenhua
Part #11:
- Part: Part 2
- City: Kangbo
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 250,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 40° 52' 51.6"
- Longitude: 116° 5' 31.1"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 40° 52' 51.6"
- Longitude: 116° 5' 31.1"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 41° 38' 13.2"
- Longitude: 114° 34' 22.7"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Latitude: 41° 29' 49.1"
- Longitude: 114° 36' 28.8"
- Geodetic system: WGS84
- Precise localization: no
Part #5:
- Latitude: 42° 4' 12"
- Longitude: 114° 33' 57.6"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Latitude: 41° 55' 47.9"
- Longitude: 114° 45' 10.8"
- Geodetic system: WGS84
- Precise localization: no
Part #7:
- Latitude: 41° 56' 13.1"
- Longitude: 114° 30' 25.2"
- Geodetic system: WGS84
- Precise localization: no
Part #8:
- Part: Part 1
- Latitude: 41° 59' 20.3"
- Longitude: 114° 34' 15.5"
- Geodetic system: WGS84
- Precise localization: no
Part #9:
- Part: Part 1
- Latitude: 41° 55' 47.9"
- Longitude: 114° 45' 14.4"
- Geodetic system: WGS84
- Precise localization: no
Part #10:
- Part: Part 2
- Latitude: 41° 46' 29.9"
- Longitude: 114° 33' 28.8"
- Geodetic system: WGS84
- Precise localization: no
Part #11:
- Part: Part 2
- Latitude: 41° 50' 49.2"
- Longitude: 114° 35' 31.1"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 20 November 2024