[Back to previous page]
Generalities
|
|
Details
Part #1:
Part #2:
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
- Operator: Hokkaido Electric Power Co
Part #3:
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 250 kW
- Operational
- Onshore wind farm
- Operator: Hokkaido Electric Power Co
Localisation
Part #1:
- Latitude: 43° 5' 4.5"
- Longitude: 140° 29' 8.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 43° 5' 4.5"
- Longitude: 140° 29' 8.6"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 43° 5' 4.5"
- Longitude: 140° 29' 8.6"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: