[Back to previous page]
Generalities
|
|
Details
- City: Gmina Golancz
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 79,000 kW
- Operational
- Onshore wind farm
- Operator: EDP Renovaveis
- Owner:
Localisation
- Latitude: 52° 57' 47.3"
- Longitude: 17° 18' 21.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 7 October 2024
Complete/correct this sheet: