[Back to previous page]
Generalities
|
|
Details
- Commissioning:
- 3 turbines: (manufacturer name not available)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Elawan
- Source:
Localisation
- Latitude: 53° 48' 14.5"
- Longitude: 14° 57' 29.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 27 August 2024
Complete/correct this sheet: