[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Weddelbrook
- Commissioning:
- 3 turbines: (manufacturer name not available)
- Total nominal power: 14,400 kW
- Operational
- Onshore wind farm
- Operator: EnBW Energie
Part #2:
- City: Lentföhrden
- Commissioning:
- 2 turbines: (manufacturer name not available)
- Total nominal power: 9,600 kW
- Operational
- Onshore wind farm
- Operator: EnBW Energie
Localisation
Part #1:
- Latitude: 53° 52' 22.8"
- Longitude: 9° 52' 51.2"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 52' 31.1"
- Longitude: 9° 53' 4.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 3 June 2024
Complete/correct this sheet: