[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Tangerhütte
- Commissioning:
- 1 turbine: (manufacturer name not available)
- Total nominal power: 6,200 kW
- Operational
- Onshore wind farm
Part #2:
- City: Tangerhütte
- Commissioning:
- 5 turbines: (manufacturer name not available)
- Total nominal power: 31,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 52° 26' 13.6"
- Longitude: 11° 48' 11.4"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 26' 13.6"
- Longitude: 11° 48' 11.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 4 June 2024
Complete/correct this sheet: