[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Paffendorf
- City: Bergheim
- Commissioning:
- 2 turbines: Vestas V117/3300 (power 3 300 kW, diameter 117 m)
- Hub height:
- Total nominal power: 6,600 kW
- Operational
- Onshore wind farm
- Developer: BMR
Part #2:
- Part: Repowering
- City: Bergheim
- Commissioning:
- 1 turbine: Vestas V150/5.6MW (power 5 600 kW, diameter 150 m)
- Hub height:
- Total nominal power: 5,600 kW
- Operational
- Onshore wind farm
Part #3:
- Part: Rommerskirchen
- City: Bergheim
- Commissioning:
- 5 turbines: Enron 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:
- Total nominal power: 7,500 kW
- Operational
- Onshore wind farm
- Developer: BMR
- Operator: BMR
- Owner:
- Source:
- Source:
Part #4:
- Part: Rommerskirchen
- City: Bergheim
- Commissioning:
- 3 turbines: Repower MD77 (power 1 500 kW, diameter 77 m)
- Hub height:
- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
Part #5:
- Part: Wiedenfelder Höhe
- City: Bergheim
- Commissioning:
- 4 turbines: Vestas V117/3300 (power 3 300 kW, diameter 117 m)
- Hub height:
- Total nominal power: 13,200 kW
- Operational
- Onshore wind farm
- Developer: BMR
Localisation
Part #1:
- Part: Paffendorf
- Latitude: 50° 57' 18.1"
- Longitude: 6° 38' 23.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Repowering
- Latitude: 50° 57' 44.8"
- Longitude: 6° 40' 0"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
Part #4:
Part #5:
- Part: Wiedenfelder Höhe
- Latitude: 50° 58' 27.4"
- Longitude: 6° 38' 27.2"
- Altitude: 125 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 9 December 2024
Complete/correct this sheet: