[Back to previous page]
Generalities
|
|
Details
- City: Tarp
- Commissioning:
![Reserved for Premium Access](images/site/locked.png)
- 1 turbine: Nordex N133/4800 (power 4 800 kW, diameter 133.2 m)
- Hub height:
![Reserved for Premium Access](images/site/locked.png)
- Total nominal power: 4,800 kW
- Operational
- Onshore wind farm
Localisation
- Latitude: 54° 39' 44.1"
- Longitude: 9° 21' 35.7"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: