Part #1:
- City: Santanghu
- Turbine(s): (manufacturer name not available)
- Total nominal power: 600,000 kW
- Under construction
- Onshore wind farm
Part #2:
- City: Hami
- Turbine(s): (manufacturer name not available)
- Total nominal power: 800,000 kW
- Under construction
- Onshore wind farm
Part #3:
- City: Hami
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Owner:
Localisation
Part #1:
- Latitude: 44° 35' 13.2"
- Longitude: 93° 54' 21.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 42° 41' 23.9"
- Longitude: 94° 4' 33.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 44° 14' 24"
- Longitude: 93° 20' 5.9"
- Geodetic system: WGS84
- Precise localization: no