Generalities
- Wind farm name: Togtoh Thermal Power Phase 2 Horinger
- Country: China
- County / Zone: Inner Mongolia
|
|
Details
- City: Hohhot
- Turbine(s): (manufacturer name not available)
- Total nominal power: 300,000 kW
- Under construction
- Onshore wind farm
- Owner:
Localisation
- Latitude: 40° 22' 55.1"
- Longitude: 111° 49' 15.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 6 May 2024