[Back to previous page]
Generalities
- Wind farm name: Pingnan Dongping West
- Country: China
- County / Zone: Guangxi
|
|
Details
Part #1:
- Part: Part 1
- City: Guancheng Zhen
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 60,000 kW
- Operational
- Onshore wind farm
- Operator: China Three Gorges Corporation
Part #2:
- Part: Part 2
- City: Guigang
- Turbine(s): (manufacturer name not available)
- Total nominal power: 48,000 kW
- Under construction
- Onshore wind farm
- Operator: China Three Gorges Corporation
- Owner:
Localisation
Part #1:
- Part: Part 1
- Latitude: 23° 41' 42"
- Longitude: 110° 24' 0"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 2
- Latitude: 23° 41' 42"
- Longitude: 110° 24' 10.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 30 April 2024
Complete/correct this sheet: