[Back to previous page]
Generalities
- Wind farm name: Mengcheng Chenqiao
- Country: China
- County / Zone: Anhui
|
|
Details
Part #1:
- City: Chenqiaocun
- Commissioning:
- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
Part #2:
- Part: Part 2
- City: Bozhou
- Turbine(s): (manufacturer name not available)
- Total nominal power: 100,000 kW
- Under construction
- Onshore wind farm
- Owner:
Localisation
Part 1 : no data.
Part #2:
- Part: Part 2
- Latitude: 33° 2' 42"
- Longitude: 116° 43' 33.5"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: