[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Part 1
- Turbine(s): (manufacturer name not available)
- Total nominal power: 42,000 kW
- Under construction
- Onshore wind farm
Part #2:
- Part: Part 2
- Turbine(s): (manufacturer name not available)
- Total nominal power: 29,400 kW
- Under construction
- Onshore wind farm
Localisation
Part #1:
- Part: Part 1
- Latitude: -12° 15' 10.8"
- Longitude: -42° 22' 26.4"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 2
- Latitude: -12° 13' 33.6"
- Longitude: -42° 22' 40.8"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 25 April 2024
Complete/correct this sheet: